Nevada Power Company, et al.; Electric Rate and Corporate Filings, 4115-4117 [E5-315]

Download as PDF Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices when relevant and necessary to their duties of exclusive representation. DISCLOSURE TO CONSUMER REPORTING AGENCIES: Disclosure pursuant to 5 U.S.C. 552a(b)(12): The Department may disclose to a consumer reporting agency information regarding a claim, which is determined to be valid and overdue as follows: (1) The name, address, and other information necessary to establish the identity of the individual responsible for the claim; and (2) the program under which the claim arose. The Department may disclose the information specified in this paragraph under 5 U.S.C. 552a(b)(12) and the procedures contained in subsection 31 U.S.C. 3711(e). A consumer-reporting agency to which these disclosures may be made is defined at 31 U.S.C. 3701(a)(3). POLICIES AND PRACTICES FOR STORING, RETRIEVING, ACCESSING, RETAINING, AND DISPOSING OF RECORDS IN THE SYSTEM: STORAGE: Records are maintained on a computer database as well as in hard copy. All hard copy forms are loaded into an imaging system accessible through internal systems only. Paper is stored in file cabinets at the Pearson Government Solutions facility in Coralville, Iowa. RETRIEVABILITY: SAFEGUARDS: All users of this system will have a unique user ID with a personal identifier. This system does not use persistent cookies (data that a Web server causes to be placed on a user’s hard drive) to implement personalization. It is the policy of the Department to prohibit the use of persistent cookies on Department Web sites except when: there is a compelling need; there are appropriate safeguards in place; the use is personally approved by the Secretary of Education; and there is clear and conspicuous notice to the public. All physical access to the Department site, and the sites of Department contractors where this system of records is maintained, is controlled and monitored by security personnel who check each individual entering the building for his or her employee or visitor badge. The computer system employed by the Department offers a high degree of resistance to tampering and 15:43 Jan 27, 2005 Jkt 205001 RETENTION AND DISPOSAL: SAIG, Participation Management enrollment forms will be retained by the manager of the SAIG Participation Management System (Pearson Government Solutions) for 6 years after the expiration of the contract. SYSTEM MANAGER(S) AND ADDRESS: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EC01–66–000, et al.] Nevada Power Company, et al.; Electric Rate and Corporate Filings January 19, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Nevada Power Company, Reid Gardner Power LLC and Clark Power LLC; Nevada Power Company and Reliant Energy Sunrise LLC [Docket Nos. EC01–66–000 and EC01–73– 000] Sue O’Flaherty, Deputy Director, Application Processing, U.S. Department of Education, Students Channel, Federal Student Aid, Union Center Plaza, 830 First Street NE., Room 32E2, Washington, DC 20202. Take notice that on September 25, 2003, Nevada Power Company (Nevada Power) filed a motion to terminate the proceedings in the above-referenced docket numbers. Comment Date: 5 p.m. Eastern Time on February 9, 2005. NOTIFICATION PROCEDURE: 2. Liberty Electric Power, LLC If you wish to determine whether a record exists regarding you in the system of records, contact the system manager. Your request must meet the requirements of the Department’s Privacy Act regulations at 34 CFR 5b.5, including proof of identity. [Docket Nos. EC05–37–000 and ER01–2398– 009] RECORD ACCESS PROCEDURES: The records are retrieved by the names of the individual user and/or unique system User ID. VerDate jul<14>2003 circumvention. This security system limits data access to Department and contract staff on a ‘‘need-to-know’’ basis, and controls individual users’’ ability to access and alter records within the system. All users of this system of records are given a unique user ID with personal identifiers. All interactions by individual users with the system are recorded. 4115 If you wish to gain access to a record regarding you in the system of records, contact the system manager. Your request must meet the requirements of the Department’s Privacy Act regulations at 34 CFR 5b.5, including proof of identity. CONTESTING RECORD PROCEDURES: If you wish to contest the content of a record regarding you in the system of records, contact the system manager. Your request must meet the requirements of the Department’s Privacy Act regulations at 34 CFR 5b.7. RECORD SOURCE CATEGORIES: Information in this system is obtained from the following entities: financial aid administrators, postsecondary institutions, third-party servicers, lenders, guaranty agencies, and state scholarship programs. SYSTEM EXEMPTED FROM CERTAIN PROVISION OF THE PRIVACY ACT: None. BILLING CODE 4000–01–P Frm 00032 3. Rainy River Energy Corporation and Constellation Energy Commodities Group, Inc. [Docket No. EC05–39–000] [FR Doc. 05–1651 Filed 1–27–05; 8:45 am] PO 00000 Take notice that on January 13, 2005, Liberty Electric Power, LLC (Applicant) submitted an application pursuant to section 203 of the Federal Power Act for authorization for disposition of jurisdictional facilities relating to the transfer of membership interests in Liberty’s indirect upstream owner, LEP Holdings, LLC (LEP Holdings) to several financial institutions and other financial investors or their special purpose affiliates (collectively, New Investors) and the transfer of a managing membership interest in LEP Holdings to Tyr Energy, Inc. (Tyr) or one of its affiliates or another entity which will meet the criteria set forth in the Application. Applicant states that it owns an approximately 567.7 MW combined cycle gas-fueled electric generating plant located in the Borough of Eddystone, Delaware County, Pennsylvania. Applicant also filed a notice of change in status in the abovecaptioned rate docket with respect to the proposed transfers of interests in LEP Holdings. Comment Date: 5 p.m. Eastern Time on February 3, 2005. Fmt 4703 Sfmt 4703 Take notice that on January 14, 2005, Rainy River Energy Corporation (Rainy E:\FR\FM\28JAN1.SGM 28JAN1 4116 Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices River) and Constellation Energy Commodities Group, Inc. (CCG) filed an application pursuant to section 203 of the Federal Power Act seeking authorization for Rainy River to transfer to CCG two power sales agreements. Rainy River and CCG state that they are power marketers with market-based rate tariffs on file with the Commission. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 4. River Hill Power Company, LLC [Docket No. EG05–30–000] Take notice that on January 12, 2005, River Hill Power Company, LLC (RHPC), with a principal place of business at 335 Madison Avenue, 28th Floor, New York, NY 10017, filed with the Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission’s regulations. RHPC states that it is a wholly owned subsidiary of RCG River Hill, LLC and that it intends to construct, own, and operate a nominal 290 MW waste coalfired electricity and steam generating plant at a site in Karthaus Township, Clearfield County, Pennsylvania. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 5. The Empire District Electric Company [Docket No. ER99–1757–007] Take notice that on January 12, 2005, The Empire District Electric Company (Empire District), submitted additional responses and data pursuant to the Commission’s deficiency letter order dated November 24, 2004 in Docket No. ER99–1757–005, as an amendment to the September 27, 2004 filing of Empire District’s generation market power study. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 6. Split Rock Energy LLC [Docket No. ER00–1857–005] Take notice that on January 12, 2005, Split Rock Energy LLC (Split Rock) supplemented its triennial review originally submitted on November 9, 2004 in Docket No. ER00–1857–004 pursuant to the Commission’s order issued May 13, 2004 in Docket No. ER02–1406–001, et al., 107 FERC ¶ 61,168 (2004). Comment Date: 5 p.m. Eastern Time on February 2, 2005. VerDate jul<14>2003 15:43 Jan 27, 2005 Jkt 205001 7. Ameren Energy Development Company 10. Virginia Electric and Power Company [Docket Nos. ER01–294–003); Ameren Energy Generating Company (Docket No. ER00– 3412–004); Ameren Energy Marketing Company (Docket No. ER00–816–002); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04–8–003); AmerenEnergy Resources Generating Company (Docket No. ER04–53–004); Central Illinois Light Company (Docket No. ER98–2440–004); Central Illinois Public Service Company (Docket No. ER98–3285–001); Union Electric Company (Docket No. ER00–2687–003] [Docket No. ER05–74–001] Take notice that on December 27, 2004, Ameren Services Company, on behalf of the above-listed affiliates and subsidiaries of Ameren Corporation, submitted an updated market power analysis in compliance with Commission orders in AEP Power Marketing, Inc., et al., 107 FERC ¶ 61,018 (2004), order on reh’g, 108 FERC ¶ 61,026 (2004). Comment Date: 5 p.m. Eastern Time on January 26, 2005. 8. Ameren Energy Development Company [Docket Nos. ER01–294–004); Ameren Energy Generating Company (Docket No. ER00– 3412–005); Ameren Energy Marketing Company (Docket No. ER00–816–003); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04–8–004); Central Illinois Light Company (Docket No. ER98–2440–005); Central Illinois Public Service Company (Docket No. ER98–3285–002); Union Electric Company (Docket No. ER00–2687–004] Take notice that on December 27, 2004, Ameren Services Company, on behalf of the above-listed affiliates and subsidiaries of Ameren Corporation, submitted updated and revised marketbased rate tariffs and rate schedules in compliance with the Commission’s orders in Investigation of Terms and Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC ¶ 61,218 (2003), order on reh’g, 107 FERC ¶ 61,175 (2004). Comment Date: 5 p.m. Eastern Time on January 26, 2005. 9. Williams Power Company, Inc. [Docket No. ER05–44–001] Take notice that on January 12, 2005, Williams Power Company, Inc. (Williams) filed amended pages to the reliability must-run agreements between Williams and the California Independent System Operator Corporation for the Alamitos and Huntington Beach Generation Units. Comment Date: 5 p.m. Eastern Time on February 2, 2005. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Take notice that on January 12, 2005, Virginia Electric and Power Company (Dominion Virginia Power) tendered for filing an executed Standard Large Generator Interconnection Agreement (LGIA) with Five Forks Energy Associates, LLC (Five Forks) and its response to the Commission’s deficiency letter issued December 15, 2004 in Docket No. ER05–74–000. Dominion Virginia Power states that the executed LGIA replaces the unexecuted LGIA that was filed in these proceedings on October 26, 2004. Dominion Virginia Power requests an effective date of January 13, 2005. Dominion Virginia Power states that copies of the filing were served on the parties on the Commission’s official service list in these proceedings, Five Forks and the Virginia State Corporation Commission. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 11. Northeast Energy Associates, a Limited Partnership [Docket No. ER05–236–002] Take notice that on January 14, 2005, Northeast Energy Associates, a Limited Partnership submitted a supplement to the application for market-based rate authority filed on November 18, 2004, which clarifies that it does not intend to retain its qualifying facility status. Northeast Energy Associates states that copies of the filing were served upon the Florida Public Service Commission. Comment Date: 5 p.m. Eastern Time on January 24, 2005. 12. Westbank Energy Capital LLC [Docket No. ER05–294–001] Take notice that on January 13, 2005, Westbank Energy Capital, LLC (Westbank) submitted an amendment to its petition filed December 6, 2004 in Docket No. ER05–294–000 for acceptance of Westbank’s Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 13. Spokane Energy, LLC [Docket No. ER05–310–001] Take notice that on January 12, 2005, Spokane Energy, LLC (Spokane Energy) filed with the Commission proposed revisions to its First Revised Rate Schedule FERC No. 1, which was E:\FR\FM\28JAN1.SGM 28JAN1 Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices originally filed on December 7, 2004 in Docket No. ER05–310–000. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 14. Avista Turbine Power, Inc. [Docket No. ER05–311–001] Take notice that on January 12, 2005, Avista Turbine Power, Inc. (Avista Turbine) filed with the Commission proposed revisions to its First Revised Rate Schedule No. 1, which was originally filed on December 7, 2005 in Docket No. ER05–311–000. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 15. San Diego Gas & Electric Company [Docket No. ER05–354–001] Take notice that on December 28, 2004, San Diego Gas & Electric Company (SDG&E) tendered for filing an amendment to its December 17, 2004 filing of changes to its Transmission Owner Tariff Reliability Services Rates. SDG&E states that copies of the filing have been served on the California Public Utilities Commission and the California Independent System Operator. Comment Date: 5 p.m. Eastern Time on January 31 , 2005. 16. Sempra Generation [Docket No. ER05–440–000] Take notice that on January 12, 2005, Sempra Generation submitted a notice of succession pursuant to section 35.16 of the Commission’s Regulations to reflect a corporate name change from Sempra Energy Resources to Sempra Generation, effective January 1, 2005. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 17. American Electric Power Service Corporation [Docket No. ER05–441–000] Take notice that on January 12, 2005, the American Electric Power Service Corporation (AEPSC), tendered for filing notices of cancellation of Service Agreement Nos. 317 and 318 under the Operating Companies of the American Electric Power System’s FERC Electric Tariff, Third Revised Volume No. 6, for firm and non-firm point-to-point transmission service agreements for Entergy-Koch Trading, LP. AEPSC requests an effective date of January 1, 2005. AEPSC states that a copy of the filing was served on the Parties and the state utility regulatory commissions of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. Comment Date: 5 p.m. Eastern Time on February 2, 2005. VerDate jul<14>2003 15:43 Jan 27, 2005 Jkt 205001 18. Condon Wind Power, LLC [Docket Nos. ER05–442–000 and ER02–305– 003); AES Alamitos, LLC (Docket No. ER98– 2185–008); AEE 2, LLC (Docket No. ER99– 2284–004); AES Creative Resources, LP and AES Eastern Energy, LP (Docket No. ER99– 1773–004); Indianapolis Power & Light Company (Docket No. ER00–1026–009); AES Ironwood, LLC (Docket No. ER04–1010–002); AES Red Oak, LLC (Docket No. ER01–2401– 003); AES Huntington Beach, LLC (Docket No. ER98–2184–008); AES Redondo Beach, LLC (Docket No. ER98–2186–008); AES Placerita, Inc. (Docket No. ER00–33–006); AES Delano, Inc. (Docket No. ER03–1207– 002] Take notice that on January 12, 2005, the above-captioned entities (collectively, Applicants) tendered for filing an amendment to the tariff of Condon Wind Power, LLC (Condon), and a notice of change in status. Applicants state that the amendment to the Condon’s tariff and the notice of change in status are intended to reflect a transaction in which SeaWest Holdings, Inc., which owns a 38.9 percent managing interest in Condon, will be acquired by a subsidiary of AES Corporation, the parent of the other Applicants. Comment Date: 5 p.m. Eastern Time on February 2, 2005. 19. Transmission Owners of the Midwest Independent Transmission System Operator, Inc. [Docket No. ER05–447–000] Take notice that on January 13, 2005, the Transmission Owners of the Midwest Independent Transmission System Operator (Midwest ISO Transmission Owners) submitted for filing a rate schedule change concerning the direct recovery of Midwest ISO Schedule 10 and 17 costs assessed to Carved-Out Grandfathered Agreements by the Midwest ISO to the transmission owners. The Midwest ISO Transmission Owners state that this filing will be served on all affected customers and on all applicable state commissions and that the filing will be posted on the Midwest ISO’s home page. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 20. Arizona Public Service Company [Docket No. ER05–448–000] Take notice that on January 13, 2005, Arizona Public Service Company (APS) tendered for filing revisions to its open access transmission tariff in order to comply with Order 2003–B issued December 20, 2004 in Docket No. RM02–1–005. APS states that a copy of the transmittal letter has been served on all PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 4117 parties listed on the Service List and that copies of the complete filing can be found on APS’ OASIS at https:// www.oatioasos.com\azps\index. Comment Date: 5 p.m. Eastern Time on February 3, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–315 Filed 1–27–05; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [OW–2004–0038, FRL–7865–3] Agency Information Collection Activities: Proposed Collection; Comment Request; Survey of Airport Deicing Operations, EPA ICR Number 2171.01 Environmental Protection Agency (EPA). AGENCY: E:\FR\FM\28JAN1.SGM 28JAN1

Agencies

[Federal Register Volume 70, Number 18 (Friday, January 28, 2005)]
[Notices]
[Pages 4115-4117]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-315]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC01-66-000, et al.]


Nevada Power Company, et al.; Electric Rate and Corporate Filings

January 19, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Nevada Power Company, Reid Gardner Power LLC and Clark Power LLC; 
Nevada Power Company and Reliant Energy Sunrise LLC

[Docket Nos. EC01-66-000 and EC01-73-000]

    Take notice that on September 25, 2003, Nevada Power Company 
(Nevada Power) filed a motion to terminate the proceedings in the 
above-referenced docket numbers.
    Comment Date: 5 p.m. Eastern Time on February 9, 2005.

2. Liberty Electric Power, LLC

[Docket Nos. EC05-37-000 and ER01-2398-009]

    Take notice that on January 13, 2005, Liberty Electric Power, LLC 
(Applicant) submitted an application pursuant to section 203 of the 
Federal Power Act for authorization for disposition of jurisdictional 
facilities relating to the transfer of membership interests in 
Liberty's indirect upstream owner, LEP Holdings, LLC (LEP Holdings) to 
several financial institutions and other financial investors or their 
special purpose affiliates (collectively, New Investors) and the 
transfer of a managing membership interest in LEP Holdings to Tyr 
Energy, Inc. (Tyr) or one of its affiliates or another entity which 
will meet the criteria set forth in the Application.
    Applicant states that it owns an approximately 567.7 MW combined 
cycle gas-fueled electric generating plant located in the Borough of 
Eddystone, Delaware County, Pennsylvania. Applicant also filed a notice 
of change in status in the above-captioned rate docket with respect to 
the proposed transfers of interests in LEP Holdings.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

3. Rainy River Energy Corporation and Constellation Energy Commodities 
Group, Inc.

[Docket No. EC05-39-000]

    Take notice that on January 14, 2005, Rainy River Energy 
Corporation (Rainy

[[Page 4116]]

River) and Constellation Energy Commodities Group, Inc. (CCG) filed an 
application pursuant to section 203 of the Federal Power Act seeking 
authorization for Rainy River to transfer to CCG two power sales 
agreements. Rainy River and CCG state that they are power marketers 
with market-based rate tariffs on file with the Commission.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

4. River Hill Power Company, LLC

[Docket No. EG05-30-000]

    Take notice that on January 12, 2005, River Hill Power Company, LLC 
(RHPC), with a principal place of business at 335 Madison Avenue, 28th 
Floor, New York, NY 10017, filed with the Commission an application for 
determination of exempt wholesale generator status pursuant to Part 365 
of the Commission's regulations.
    RHPC states that it is a wholly owned subsidiary of RCG River Hill, 
LLC and that it intends to construct, own, and operate a nominal 290 MW 
waste coal-fired electricity and steam generating plant at a site in 
Karthaus Township, Clearfield County, Pennsylvania.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

5. The Empire District Electric Company

[Docket No. ER99-1757-007]

    Take notice that on January 12, 2005, The Empire District Electric 
Company (Empire District), submitted additional responses and data 
pursuant to the Commission's deficiency letter order dated November 24, 
2004 in Docket No. ER99-1757-005, as an amendment to the September 27, 
2004 filing of Empire District's generation market power study.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

6. Split Rock Energy LLC

[Docket No. ER00-1857-005]

    Take notice that on January 12, 2005, Split Rock Energy LLC (Split 
Rock) supplemented its triennial review originally submitted on 
November 9, 2004 in Docket No. ER00-1857-004 pursuant to the 
Commission's order issued May 13, 2004 in Docket No. ER02-1406-001, et 
al., 107 FERC ] 61,168 (2004).
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

7. Ameren Energy Development Company

[Docket Nos. ER01-294-003); Ameren Energy Generating Company (Docket 
No. ER00-3412-004); Ameren Energy Marketing Company (Docket No. ER00-
816-002); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04-8-
003); AmerenEnergy Resources Generating Company (Docket No. ER04-53-
004); Central Illinois Light Company (Docket No. ER98-2440-004); 
Central Illinois Public Service Company (Docket No. ER98-3285-001); 
Union Electric Company (Docket No. ER00-2687-003]

    Take notice that on December 27, 2004, Ameren Services Company, on 
behalf of the above-listed affiliates and subsidiaries of Ameren 
Corporation, submitted an updated market power analysis in compliance 
with Commission orders in AEP Power Marketing, Inc., et al., 107 FERC ] 
61,018 (2004), order on reh'g, 108 FERC ] 61,026 (2004).
    Comment Date: 5 p.m. Eastern Time on January 26, 2005.

8. Ameren Energy Development Company

[Docket Nos. ER01-294-004); Ameren Energy Generating Company (Docket 
No. ER00-3412-005); Ameren Energy Marketing Company (Docket No. ER00-
816-003); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04-8-
004); Central Illinois Light Company (Docket No. ER98-2440-005); 
Central Illinois Public Service Company (Docket No. ER98-3285-002); 
Union Electric Company (Docket No. ER00-2687-004]

    Take notice that on December 27, 2004, Ameren Services Company, on 
behalf of the above-listed affiliates and subsidiaries of Ameren 
Corporation, submitted updated and revised market-based rate tariffs 
and rate schedules in compliance with the Commission's orders in 
Investigation of Terms and Conditions of Public Utility Market-Based 
Rate Authorizations, 105 FERC  61,218 (2003), order on reh'g, 
107 FERC ] 61,175 (2004).
    Comment Date: 5 p.m. Eastern Time on January 26, 2005.

9. Williams Power Company, Inc.

[Docket No. ER05-44-001]

    Take notice that on January 12, 2005, Williams Power Company, Inc. 
(Williams) filed amended pages to the reliability must-run agreements 
between Williams and the California Independent System Operator 
Corporation for the Alamitos and Huntington Beach Generation Units.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

10. Virginia Electric and Power Company

[Docket No. ER05-74-001]

    Take notice that on January 12, 2005, Virginia Electric and Power 
Company (Dominion Virginia Power) tendered for filing an executed 
Standard Large Generator Interconnection Agreement (LGIA) with Five 
Forks Energy Associates, LLC (Five Forks) and its response to the 
Commission's deficiency letter issued December 15, 2004 in Docket No. 
ER05-74-000. Dominion Virginia Power states that the executed LGIA 
replaces the unexecuted LGIA that was filed in these proceedings on 
October 26, 2004. Dominion Virginia Power requests an effective date of 
January 13, 2005.
    Dominion Virginia Power states that copies of the filing were 
served on the parties on the Commission's official service list in 
these proceedings, Five Forks and the Virginia State Corporation 
Commission.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

11. Northeast Energy Associates, a Limited Partnership

[Docket No. ER05-236-002]

    Take notice that on January 14, 2005, Northeast Energy Associates, 
a Limited Partnership submitted a supplement to the application for 
market-based rate authority filed on November 18, 2004, which clarifies 
that it does not intend to retain its qualifying facility status.
    Northeast Energy Associates states that copies of the filing were 
served upon the Florida Public Service Commission.
    Comment Date: 5 p.m. Eastern Time on January 24, 2005.

12. Westbank Energy Capital LLC

[Docket No. ER05-294-001]

    Take notice that on January 13, 2005, Westbank Energy Capital, LLC 
(Westbank) submitted an amendment to its petition filed December 6, 
2004 in Docket No. ER05-294-000 for acceptance of Westbank's Rate 
Schedule FERC No. 1; the granting of certain blanket approvals, 
including the authority to sell electricity at market-based rates; and 
the waiver of certain Commission regulations.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

13. Spokane Energy, LLC

[Docket No. ER05-310-001]

    Take notice that on January 12, 2005, Spokane Energy, LLC (Spokane 
Energy) filed with the Commission proposed revisions to its First 
Revised Rate Schedule FERC No. 1, which was

[[Page 4117]]

originally filed on December 7, 2004 in Docket No. ER05-310-000.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

14. Avista Turbine Power, Inc.

[Docket No. ER05-311-001]

    Take notice that on January 12, 2005, Avista Turbine Power, Inc. 
(Avista Turbine) filed with the Commission proposed revisions to its 
First Revised Rate Schedule No. 1, which was originally filed on 
December 7, 2005 in Docket No. ER05-311-000.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

15. San Diego Gas & Electric Company

[Docket No. ER05-354-001]

    Take notice that on December 28, 2004, San Diego Gas & Electric 
Company (SDG&E) tendered for filing an amendment to its December 17, 
2004 filing of changes to its Transmission Owner Tariff Reliability 
Services Rates.
    SDG&E states that copies of the filing have been served on the 
California Public Utilities Commission and the California Independent 
System Operator.
    Comment Date: 5 p.m. Eastern Time on January 31 , 2005.

16. Sempra Generation

[Docket No. ER05-440-000]

    Take notice that on January 12, 2005, Sempra Generation submitted a 
notice of succession pursuant to section 35.16 of the Commission's 
Regulations to reflect a corporate name change from Sempra Energy 
Resources to Sempra Generation, effective January 1, 2005.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

17. American Electric Power Service Corporation

[Docket No. ER05-441-000]

    Take notice that on January 12, 2005, the American Electric Power 
Service Corporation (AEPSC), tendered for filing notices of 
cancellation of Service Agreement Nos. 317 and 318 under the Operating 
Companies of the American Electric Power System's FERC Electric Tariff, 
Third Revised Volume No. 6, for firm and non-firm point-to-point 
transmission service agreements for Entergy-Koch Trading, LP. AEPSC 
requests an effective date of January 1, 2005.
    AEPSC states that a copy of the filing was served on the Parties 
and the state utility regulatory commissions of Arkansas, Indiana, 
Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, 
Virginia and West Virginia.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

18. Condon Wind Power, LLC

[Docket Nos. ER05-442-000 and ER02-305-003); AES Alamitos, LLC (Docket 
No. ER98-2185-008); AEE 2, LLC (Docket No. ER99-2284-004); AES Creative 
Resources, LP and AES Eastern Energy, LP (Docket No. ER99-1773-004); 
Indianapolis Power & Light Company (Docket No. ER00-1026-009); AES 
Ironwood, LLC (Docket No. ER04-1010-002); AES Red Oak, LLC (Docket No. 
ER01-2401-003); AES Huntington Beach, LLC (Docket No. ER98-2184-008); 
AES Redondo Beach, LLC (Docket No. ER98-2186-008); AES Placerita, Inc. 
(Docket No. ER00-33-006); AES Delano, Inc. (Docket No. ER03-1207-002]

    Take notice that on January 12, 2005, the above-captioned entities 
(collectively, Applicants) tendered for filing an amendment to the 
tariff of Condon Wind Power, LLC (Condon), and a notice of change in 
status. Applicants state that the amendment to the Condon's tariff and 
the notice of change in status are intended to reflect a transaction in 
which SeaWest Holdings, Inc., which owns a 38.9 percent managing 
interest in Condon, will be acquired by a subsidiary of AES 
Corporation, the parent of the other Applicants.
    Comment Date: 5 p.m. Eastern Time on February 2, 2005.

19. Transmission Owners of the Midwest Independent Transmission System 
Operator, Inc.

[Docket No. ER05-447-000]

    Take notice that on January 13, 2005, the Transmission Owners of 
the Midwest Independent Transmission System Operator (Midwest ISO 
Transmission Owners) submitted for filing a rate schedule change 
concerning the direct recovery of Midwest ISO Schedule 10 and 17 costs 
assessed to Carved-Out Grandfathered Agreements by the Midwest ISO to 
the transmission owners.
    The Midwest ISO Transmission Owners state that this filing will be 
served on all affected customers and on all applicable state 
commissions and that the filing will be posted on the Midwest ISO's 
home page.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

20. Arizona Public Service Company

[Docket No. ER05-448-000]

    Take notice that on January 13, 2005, Arizona Public Service 
Company (APS) tendered for filing revisions to its open access 
transmission tariff in order to comply with Order 2003-B issued 
December 20, 2004 in Docket No. RM02-1-005.
    APS states that a copy of the transmittal letter has been served on 
all parties listed on the Service List and that copies of the complete 
filing can be found on APS' OASIS at https://
www.oatioasos.com\azps\index.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
 [FR Doc. E5-315 Filed 1-27-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.