Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices
when relevant and necessary to their
duties of exclusive representation.
DISCLOSURE TO CONSUMER REPORTING
AGENCIES:
Disclosure pursuant to 5 U.S.C.
552a(b)(12): The Department may
disclose to a consumer reporting agency
information regarding a claim, which is
determined to be valid and overdue as
follows: (1) The name, address, and
other information necessary to establish
the identity of the individual
responsible for the claim; and (2) the
program under which the claim arose.
The Department may disclose the
information specified in this paragraph
under 5 U.S.C. 552a(b)(12) and the
procedures contained in subsection 31
U.S.C. 3711(e).
A consumer-reporting agency to
which these disclosures may be made is
defined at 31 U.S.C. 3701(a)(3).
POLICIES AND PRACTICES FOR STORING,
RETRIEVING, ACCESSING, RETAINING, AND
DISPOSING OF RECORDS IN THE SYSTEM:
STORAGE:
Records are maintained on a
computer database as well as in hard
copy. All hard copy forms are loaded
into an imaging system accessible
through internal systems only. Paper is
stored in file cabinets at the Pearson
Government Solutions facility in
Coralville, Iowa.
RETRIEVABILITY:
SAFEGUARDS:
All users of this system will have a
unique user ID with a personal
identifier.
This system does not use persistent
cookies (data that a Web server causes
to be placed on a user’s hard drive) to
implement personalization. It is the
policy of the Department to prohibit the
use of persistent cookies on Department
Web sites except when: there is a
compelling need; there are appropriate
safeguards in place; the use is
personally approved by the Secretary of
Education; and there is clear and
conspicuous notice to the public.
All physical access to the Department
site, and the sites of Department
contractors where this system of records
is maintained, is controlled and
monitored by security personnel who
check each individual entering the
building for his or her employee or
visitor badge.
The computer system employed by
the Department offers a high degree of
resistance to tampering and
15:43 Jan 27, 2005
Jkt 205001
RETENTION AND DISPOSAL:
SAIG, Participation Management
enrollment forms will be retained by the
manager of the SAIG Participation
Management System (Pearson
Government Solutions) for 6 years after
the expiration of the contract.
SYSTEM MANAGER(S) AND ADDRESS:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC01–66–000, et al.]
Nevada Power Company, et al.;
Electric Rate and Corporate Filings
January 19, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Nevada Power Company, Reid
Gardner Power LLC and Clark Power
LLC; Nevada Power Company and
Reliant Energy Sunrise LLC
[Docket Nos. EC01–66–000 and EC01–73–
000]
Sue O’Flaherty, Deputy Director,
Application Processing, U.S.
Department of Education, Students
Channel, Federal Student Aid, Union
Center Plaza, 830 First Street NE., Room
32E2, Washington, DC 20202.
Take notice that on September 25,
2003, Nevada Power Company (Nevada
Power) filed a motion to terminate the
proceedings in the above-referenced
docket numbers.
Comment Date: 5 p.m. Eastern Time
on February 9, 2005.
NOTIFICATION PROCEDURE:
2. Liberty Electric Power, LLC
If you wish to determine whether a
record exists regarding you in the
system of records, contact the system
manager. Your request must meet the
requirements of the Department’s
Privacy Act regulations at 34 CFR 5b.5,
including proof of identity.
[Docket Nos. EC05–37–000 and ER01–2398–
009]
RECORD ACCESS PROCEDURES:
The records are retrieved by the
names of the individual user and/or
unique system User ID.
VerDate jul<14>2003
circumvention. This security system
limits data access to Department and
contract staff on a ‘‘need-to-know’’
basis, and controls individual users’’
ability to access and alter records within
the system.
All users of this system of records are
given a unique user ID with personal
identifiers.
All interactions by individual users
with the system are recorded.
4115
If you wish to gain access to a record
regarding you in the system of records,
contact the system manager. Your
request must meet the requirements of
the Department’s Privacy Act
regulations at 34 CFR 5b.5, including
proof of identity.
CONTESTING RECORD PROCEDURES:
If you wish to contest the content of
a record regarding you in the system of
records, contact the system manager.
Your request must meet the
requirements of the Department’s
Privacy Act regulations at 34 CFR 5b.7.
RECORD SOURCE CATEGORIES:
Information in this system is obtained
from the following entities: financial aid
administrators, postsecondary
institutions, third-party servicers,
lenders, guaranty agencies, and state
scholarship programs.
SYSTEM EXEMPTED FROM CERTAIN PROVISION OF
THE PRIVACY ACT:
None.
BILLING CODE 4000–01–P
Frm 00032
3. Rainy River Energy Corporation and
Constellation Energy Commodities
Group, Inc.
[Docket No. EC05–39–000]
[FR Doc. 05–1651 Filed 1–27–05; 8:45 am]
PO 00000
Take notice that on January 13, 2005,
Liberty Electric Power, LLC (Applicant)
submitted an application pursuant to
section 203 of the Federal Power Act for
authorization for disposition of
jurisdictional facilities relating to the
transfer of membership interests in
Liberty’s indirect upstream owner, LEP
Holdings, LLC (LEP Holdings) to several
financial institutions and other financial
investors or their special purpose
affiliates (collectively, New Investors)
and the transfer of a managing
membership interest in LEP Holdings to
Tyr Energy, Inc. (Tyr) or one of its
affiliates or another entity which will
meet the criteria set forth in the
Application.
Applicant states that it owns an
approximately 567.7 MW combined
cycle gas-fueled electric generating
plant located in the Borough of
Eddystone, Delaware County,
Pennsylvania. Applicant also filed a
notice of change in status in the abovecaptioned rate docket with respect to
the proposed transfers of interests in
LEP Holdings.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
Fmt 4703
Sfmt 4703
Take notice that on January 14, 2005,
Rainy River Energy Corporation (Rainy
E:\FR\FM\28JAN1.SGM
28JAN1
4116
Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices
River) and Constellation Energy
Commodities Group, Inc. (CCG) filed an
application pursuant to section 203 of
the Federal Power Act seeking
authorization for Rainy River to transfer
to CCG two power sales agreements.
Rainy River and CCG state that they are
power marketers with market-based rate
tariffs on file with the Commission.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
4. River Hill Power Company, LLC
[Docket No. EG05–30–000]
Take notice that on January 12, 2005,
River Hill Power Company, LLC
(RHPC), with a principal place of
business at 335 Madison Avenue, 28th
Floor, New York, NY 10017, filed with
the Commission an application for
determination of exempt wholesale
generator status pursuant to Part 365 of
the Commission’s regulations.
RHPC states that it is a wholly owned
subsidiary of RCG River Hill, LLC and
that it intends to construct, own, and
operate a nominal 290 MW waste coalfired electricity and steam generating
plant at a site in Karthaus Township,
Clearfield County, Pennsylvania.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
5. The Empire District Electric
Company
[Docket No. ER99–1757–007]
Take notice that on January 12, 2005,
The Empire District Electric Company
(Empire District), submitted additional
responses and data pursuant to the
Commission’s deficiency letter order
dated November 24, 2004 in Docket No.
ER99–1757–005, as an amendment to
the September 27, 2004 filing of Empire
District’s generation market power
study.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
6. Split Rock Energy LLC
[Docket No. ER00–1857–005]
Take notice that on January 12, 2005,
Split Rock Energy LLC (Split Rock)
supplemented its triennial review
originally submitted on November 9,
2004 in Docket No. ER00–1857–004
pursuant to the Commission’s order
issued May 13, 2004 in Docket No.
ER02–1406–001, et al., 107 FERC
¶ 61,168 (2004).
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
VerDate jul<14>2003
15:43 Jan 27, 2005
Jkt 205001
7. Ameren Energy Development
Company
10. Virginia Electric and Power
Company
[Docket Nos. ER01–294–003); Ameren Energy
Generating Company (Docket No. ER00–
3412–004); Ameren Energy Marketing
Company (Docket No. ER00–816–002);
AmerenEnergy Medina Valley Cogen, LLC
(Docket No. ER04–8–003); AmerenEnergy
Resources Generating Company (Docket No.
ER04–53–004); Central Illinois Light
Company (Docket No. ER98–2440–004);
Central Illinois Public Service Company
(Docket No. ER98–3285–001); Union Electric
Company (Docket No. ER00–2687–003]
[Docket No. ER05–74–001]
Take notice that on December 27,
2004, Ameren Services Company, on
behalf of the above-listed affiliates and
subsidiaries of Ameren Corporation,
submitted an updated market power
analysis in compliance with
Commission orders in AEP Power
Marketing, Inc., et al., 107 FERC
¶ 61,018 (2004), order on reh’g, 108
FERC ¶ 61,026 (2004).
Comment Date: 5 p.m. Eastern Time
on January 26, 2005.
8. Ameren Energy Development
Company
[Docket Nos. ER01–294–004); Ameren Energy
Generating Company (Docket No. ER00–
3412–005); Ameren Energy Marketing
Company (Docket No. ER00–816–003);
AmerenEnergy Medina Valley Cogen, LLC
(Docket No. ER04–8–004); Central Illinois
Light Company (Docket No. ER98–2440–005);
Central Illinois Public Service Company
(Docket No. ER98–3285–002); Union Electric
Company (Docket No. ER00–2687–004]
Take notice that on December 27,
2004, Ameren Services Company, on
behalf of the above-listed affiliates and
subsidiaries of Ameren Corporation,
submitted updated and revised marketbased rate tariffs and rate schedules in
compliance with the Commission’s
orders in Investigation of Terms and
Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC
¶ 61,218 (2003), order on reh’g, 107
FERC ¶ 61,175 (2004).
Comment Date: 5 p.m. Eastern Time
on January 26, 2005.
9. Williams Power Company, Inc.
[Docket No. ER05–44–001]
Take notice that on January 12, 2005,
Williams Power Company, Inc.
(Williams) filed amended pages to the
reliability must-run agreements between
Williams and the California
Independent System Operator
Corporation for the Alamitos and
Huntington Beach Generation Units.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Take notice that on January 12, 2005,
Virginia Electric and Power Company
(Dominion Virginia Power) tendered for
filing an executed Standard Large
Generator Interconnection Agreement
(LGIA) with Five Forks Energy
Associates, LLC (Five Forks) and its
response to the Commission’s
deficiency letter issued December 15,
2004 in Docket No. ER05–74–000.
Dominion Virginia Power states that the
executed LGIA replaces the unexecuted
LGIA that was filed in these proceedings
on October 26, 2004. Dominion Virginia
Power requests an effective date of
January 13, 2005.
Dominion Virginia Power states that
copies of the filing were served on the
parties on the Commission’s official
service list in these proceedings, Five
Forks and the Virginia State Corporation
Commission.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
11. Northeast Energy Associates, a
Limited Partnership
[Docket No. ER05–236–002]
Take notice that on January 14, 2005,
Northeast Energy Associates, a Limited
Partnership submitted a supplement to
the application for market-based rate
authority filed on November 18, 2004,
which clarifies that it does not intend to
retain its qualifying facility status.
Northeast Energy Associates states
that copies of the filing were served
upon the Florida Public Service
Commission.
Comment Date: 5 p.m. Eastern Time
on January 24, 2005.
12. Westbank Energy Capital LLC
[Docket No. ER05–294–001]
Take notice that on January 13, 2005,
Westbank Energy Capital, LLC
(Westbank) submitted an amendment to
its petition filed December 6, 2004 in
Docket No. ER05–294–000 for
acceptance of Westbank’s Rate Schedule
FERC No. 1; the granting of certain
blanket approvals, including the
authority to sell electricity at marketbased rates; and the waiver of certain
Commission regulations.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
13. Spokane Energy, LLC
[Docket No. ER05–310–001]
Take notice that on January 12, 2005,
Spokane Energy, LLC (Spokane Energy)
filed with the Commission proposed
revisions to its First Revised Rate
Schedule FERC No. 1, which was
E:\FR\FM\28JAN1.SGM
28JAN1
Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices
originally filed on December 7, 2004 in
Docket No. ER05–310–000.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
14. Avista Turbine Power, Inc.
[Docket No. ER05–311–001]
Take notice that on January 12, 2005,
Avista Turbine Power, Inc. (Avista
Turbine) filed with the Commission
proposed revisions to its First Revised
Rate Schedule No. 1, which was
originally filed on December 7, 2005 in
Docket No. ER05–311–000.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
15. San Diego Gas & Electric Company
[Docket No. ER05–354–001]
Take notice that on December 28,
2004, San Diego Gas & Electric
Company (SDG&E) tendered for filing an
amendment to its December 17, 2004
filing of changes to its Transmission
Owner Tariff Reliability Services Rates.
SDG&E states that copies of the filing
have been served on the California
Public Utilities Commission and the
California Independent System
Operator.
Comment Date: 5 p.m. Eastern Time
on January 31 , 2005.
16. Sempra Generation
[Docket No. ER05–440–000]
Take notice that on January 12, 2005,
Sempra Generation submitted a notice
of succession pursuant to section 35.16
of the Commission’s Regulations to
reflect a corporate name change from
Sempra Energy Resources to Sempra
Generation, effective January 1, 2005.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
17. American Electric Power Service
Corporation
[Docket No. ER05–441–000]
Take notice that on January 12, 2005,
the American Electric Power Service
Corporation (AEPSC), tendered for filing
notices of cancellation of Service
Agreement Nos. 317 and 318 under the
Operating Companies of the American
Electric Power System’s FERC Electric
Tariff, Third Revised Volume No. 6, for
firm and non-firm point-to-point
transmission service agreements for
Entergy-Koch Trading, LP. AEPSC
requests an effective date of January 1,
2005.
AEPSC states that a copy of the filing
was served on the Parties and the state
utility regulatory commissions of
Arkansas, Indiana, Kentucky, Louisiana,
Michigan, Ohio, Oklahoma, Tennessee,
Texas, Virginia and West Virginia.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
VerDate jul<14>2003
15:43 Jan 27, 2005
Jkt 205001
18. Condon Wind Power, LLC
[Docket Nos. ER05–442–000 and ER02–305–
003); AES Alamitos, LLC (Docket No. ER98–
2185–008); AEE 2, LLC (Docket No. ER99–
2284–004); AES Creative Resources, LP and
AES Eastern Energy, LP (Docket No. ER99–
1773–004); Indianapolis Power & Light
Company (Docket No. ER00–1026–009); AES
Ironwood, LLC (Docket No. ER04–1010–002);
AES Red Oak, LLC (Docket No. ER01–2401–
003); AES Huntington Beach, LLC (Docket
No. ER98–2184–008); AES Redondo Beach,
LLC (Docket No. ER98–2186–008); AES
Placerita, Inc. (Docket No. ER00–33–006);
AES Delano, Inc. (Docket No. ER03–1207–
002]
Take notice that on January 12, 2005,
the above-captioned entities
(collectively, Applicants) tendered for
filing an amendment to the tariff of
Condon Wind Power, LLC (Condon),
and a notice of change in status.
Applicants state that the amendment to
the Condon’s tariff and the notice of
change in status are intended to reflect
a transaction in which SeaWest
Holdings, Inc., which owns a 38.9
percent managing interest in Condon,
will be acquired by a subsidiary of AES
Corporation, the parent of the other
Applicants.
Comment Date: 5 p.m. Eastern Time
on February 2, 2005.
19. Transmission Owners of the
Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER05–447–000]
Take notice that on January 13, 2005,
the Transmission Owners of the
Midwest Independent Transmission
System Operator (Midwest ISO
Transmission Owners) submitted for
filing a rate schedule change concerning
the direct recovery of Midwest ISO
Schedule 10 and 17 costs assessed to
Carved-Out Grandfathered Agreements
by the Midwest ISO to the transmission
owners.
The Midwest ISO Transmission
Owners state that this filing will be
served on all affected customers and on
all applicable state commissions and
that the filing will be posted on the
Midwest ISO’s home page.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
20. Arizona Public Service Company
[Docket No. ER05–448–000]
Take notice that on January 13, 2005,
Arizona Public Service Company (APS)
tendered for filing revisions to its open
access transmission tariff in order to
comply with Order 2003–B issued
December 20, 2004 in Docket No.
RM02–1–005.
APS states that a copy of the
transmittal letter has been served on all
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
4117
parties listed on the Service List and
that copies of the complete filing can be
found on APS’ OASIS at https://
www.oatioasos.com\azps\index.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–315 Filed 1–27–05; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[OW–2004–0038, FRL–7865–3]
Agency Information Collection
Activities: Proposed Collection;
Comment Request; Survey of Airport
Deicing Operations, EPA ICR Number
2171.01
Environmental Protection
Agency (EPA).
AGENCY:
E:\FR\FM\28JAN1.SGM
28JAN1
Agencies
[Federal Register Volume 70, Number 18 (Friday, January 28, 2005)]
[Notices]
[Pages 4115-4117]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-315]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC01-66-000, et al.]
Nevada Power Company, et al.; Electric Rate and Corporate Filings
January 19, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Nevada Power Company, Reid Gardner Power LLC and Clark Power LLC;
Nevada Power Company and Reliant Energy Sunrise LLC
[Docket Nos. EC01-66-000 and EC01-73-000]
Take notice that on September 25, 2003, Nevada Power Company
(Nevada Power) filed a motion to terminate the proceedings in the
above-referenced docket numbers.
Comment Date: 5 p.m. Eastern Time on February 9, 2005.
2. Liberty Electric Power, LLC
[Docket Nos. EC05-37-000 and ER01-2398-009]
Take notice that on January 13, 2005, Liberty Electric Power, LLC
(Applicant) submitted an application pursuant to section 203 of the
Federal Power Act for authorization for disposition of jurisdictional
facilities relating to the transfer of membership interests in
Liberty's indirect upstream owner, LEP Holdings, LLC (LEP Holdings) to
several financial institutions and other financial investors or their
special purpose affiliates (collectively, New Investors) and the
transfer of a managing membership interest in LEP Holdings to Tyr
Energy, Inc. (Tyr) or one of its affiliates or another entity which
will meet the criteria set forth in the Application.
Applicant states that it owns an approximately 567.7 MW combined
cycle gas-fueled electric generating plant located in the Borough of
Eddystone, Delaware County, Pennsylvania. Applicant also filed a notice
of change in status in the above-captioned rate docket with respect to
the proposed transfers of interests in LEP Holdings.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
3. Rainy River Energy Corporation and Constellation Energy Commodities
Group, Inc.
[Docket No. EC05-39-000]
Take notice that on January 14, 2005, Rainy River Energy
Corporation (Rainy
[[Page 4116]]
River) and Constellation Energy Commodities Group, Inc. (CCG) filed an
application pursuant to section 203 of the Federal Power Act seeking
authorization for Rainy River to transfer to CCG two power sales
agreements. Rainy River and CCG state that they are power marketers
with market-based rate tariffs on file with the Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
4. River Hill Power Company, LLC
[Docket No. EG05-30-000]
Take notice that on January 12, 2005, River Hill Power Company, LLC
(RHPC), with a principal place of business at 335 Madison Avenue, 28th
Floor, New York, NY 10017, filed with the Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's regulations.
RHPC states that it is a wholly owned subsidiary of RCG River Hill,
LLC and that it intends to construct, own, and operate a nominal 290 MW
waste coal-fired electricity and steam generating plant at a site in
Karthaus Township, Clearfield County, Pennsylvania.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
5. The Empire District Electric Company
[Docket No. ER99-1757-007]
Take notice that on January 12, 2005, The Empire District Electric
Company (Empire District), submitted additional responses and data
pursuant to the Commission's deficiency letter order dated November 24,
2004 in Docket No. ER99-1757-005, as an amendment to the September 27,
2004 filing of Empire District's generation market power study.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
6. Split Rock Energy LLC
[Docket No. ER00-1857-005]
Take notice that on January 12, 2005, Split Rock Energy LLC (Split
Rock) supplemented its triennial review originally submitted on
November 9, 2004 in Docket No. ER00-1857-004 pursuant to the
Commission's order issued May 13, 2004 in Docket No. ER02-1406-001, et
al., 107 FERC ] 61,168 (2004).
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
7. Ameren Energy Development Company
[Docket Nos. ER01-294-003); Ameren Energy Generating Company (Docket
No. ER00-3412-004); Ameren Energy Marketing Company (Docket No. ER00-
816-002); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04-8-
003); AmerenEnergy Resources Generating Company (Docket No. ER04-53-
004); Central Illinois Light Company (Docket No. ER98-2440-004);
Central Illinois Public Service Company (Docket No. ER98-3285-001);
Union Electric Company (Docket No. ER00-2687-003]
Take notice that on December 27, 2004, Ameren Services Company, on
behalf of the above-listed affiliates and subsidiaries of Ameren
Corporation, submitted an updated market power analysis in compliance
with Commission orders in AEP Power Marketing, Inc., et al., 107 FERC ]
61,018 (2004), order on reh'g, 108 FERC ] 61,026 (2004).
Comment Date: 5 p.m. Eastern Time on January 26, 2005.
8. Ameren Energy Development Company
[Docket Nos. ER01-294-004); Ameren Energy Generating Company (Docket
No. ER00-3412-005); Ameren Energy Marketing Company (Docket No. ER00-
816-003); AmerenEnergy Medina Valley Cogen, LLC (Docket No. ER04-8-
004); Central Illinois Light Company (Docket No. ER98-2440-005);
Central Illinois Public Service Company (Docket No. ER98-3285-002);
Union Electric Company (Docket No. ER00-2687-004]
Take notice that on December 27, 2004, Ameren Services Company, on
behalf of the above-listed affiliates and subsidiaries of Ameren
Corporation, submitted updated and revised market-based rate tariffs
and rate schedules in compliance with the Commission's orders in
Investigation of Terms and Conditions of Public Utility Market-Based
Rate Authorizations, 105 FERC 61,218 (2003), order on reh'g,
107 FERC ] 61,175 (2004).
Comment Date: 5 p.m. Eastern Time on January 26, 2005.
9. Williams Power Company, Inc.
[Docket No. ER05-44-001]
Take notice that on January 12, 2005, Williams Power Company, Inc.
(Williams) filed amended pages to the reliability must-run agreements
between Williams and the California Independent System Operator
Corporation for the Alamitos and Huntington Beach Generation Units.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
10. Virginia Electric and Power Company
[Docket No. ER05-74-001]
Take notice that on January 12, 2005, Virginia Electric and Power
Company (Dominion Virginia Power) tendered for filing an executed
Standard Large Generator Interconnection Agreement (LGIA) with Five
Forks Energy Associates, LLC (Five Forks) and its response to the
Commission's deficiency letter issued December 15, 2004 in Docket No.
ER05-74-000. Dominion Virginia Power states that the executed LGIA
replaces the unexecuted LGIA that was filed in these proceedings on
October 26, 2004. Dominion Virginia Power requests an effective date of
January 13, 2005.
Dominion Virginia Power states that copies of the filing were
served on the parties on the Commission's official service list in
these proceedings, Five Forks and the Virginia State Corporation
Commission.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
11. Northeast Energy Associates, a Limited Partnership
[Docket No. ER05-236-002]
Take notice that on January 14, 2005, Northeast Energy Associates,
a Limited Partnership submitted a supplement to the application for
market-based rate authority filed on November 18, 2004, which clarifies
that it does not intend to retain its qualifying facility status.
Northeast Energy Associates states that copies of the filing were
served upon the Florida Public Service Commission.
Comment Date: 5 p.m. Eastern Time on January 24, 2005.
12. Westbank Energy Capital LLC
[Docket No. ER05-294-001]
Take notice that on January 13, 2005, Westbank Energy Capital, LLC
(Westbank) submitted an amendment to its petition filed December 6,
2004 in Docket No. ER05-294-000 for acceptance of Westbank's Rate
Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission regulations.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
13. Spokane Energy, LLC
[Docket No. ER05-310-001]
Take notice that on January 12, 2005, Spokane Energy, LLC (Spokane
Energy) filed with the Commission proposed revisions to its First
Revised Rate Schedule FERC No. 1, which was
[[Page 4117]]
originally filed on December 7, 2004 in Docket No. ER05-310-000.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
14. Avista Turbine Power, Inc.
[Docket No. ER05-311-001]
Take notice that on January 12, 2005, Avista Turbine Power, Inc.
(Avista Turbine) filed with the Commission proposed revisions to its
First Revised Rate Schedule No. 1, which was originally filed on
December 7, 2005 in Docket No. ER05-311-000.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
15. San Diego Gas & Electric Company
[Docket No. ER05-354-001]
Take notice that on December 28, 2004, San Diego Gas & Electric
Company (SDG&E) tendered for filing an amendment to its December 17,
2004 filing of changes to its Transmission Owner Tariff Reliability
Services Rates.
SDG&E states that copies of the filing have been served on the
California Public Utilities Commission and the California Independent
System Operator.
Comment Date: 5 p.m. Eastern Time on January 31 , 2005.
16. Sempra Generation
[Docket No. ER05-440-000]
Take notice that on January 12, 2005, Sempra Generation submitted a
notice of succession pursuant to section 35.16 of the Commission's
Regulations to reflect a corporate name change from Sempra Energy
Resources to Sempra Generation, effective January 1, 2005.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
17. American Electric Power Service Corporation
[Docket No. ER05-441-000]
Take notice that on January 12, 2005, the American Electric Power
Service Corporation (AEPSC), tendered for filing notices of
cancellation of Service Agreement Nos. 317 and 318 under the Operating
Companies of the American Electric Power System's FERC Electric Tariff,
Third Revised Volume No. 6, for firm and non-firm point-to-point
transmission service agreements for Entergy-Koch Trading, LP. AEPSC
requests an effective date of January 1, 2005.
AEPSC states that a copy of the filing was served on the Parties
and the state utility regulatory commissions of Arkansas, Indiana,
Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas,
Virginia and West Virginia.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
18. Condon Wind Power, LLC
[Docket Nos. ER05-442-000 and ER02-305-003); AES Alamitos, LLC (Docket
No. ER98-2185-008); AEE 2, LLC (Docket No. ER99-2284-004); AES Creative
Resources, LP and AES Eastern Energy, LP (Docket No. ER99-1773-004);
Indianapolis Power & Light Company (Docket No. ER00-1026-009); AES
Ironwood, LLC (Docket No. ER04-1010-002); AES Red Oak, LLC (Docket No.
ER01-2401-003); AES Huntington Beach, LLC (Docket No. ER98-2184-008);
AES Redondo Beach, LLC (Docket No. ER98-2186-008); AES Placerita, Inc.
(Docket No. ER00-33-006); AES Delano, Inc. (Docket No. ER03-1207-002]
Take notice that on January 12, 2005, the above-captioned entities
(collectively, Applicants) tendered for filing an amendment to the
tariff of Condon Wind Power, LLC (Condon), and a notice of change in
status. Applicants state that the amendment to the Condon's tariff and
the notice of change in status are intended to reflect a transaction in
which SeaWest Holdings, Inc., which owns a 38.9 percent managing
interest in Condon, will be acquired by a subsidiary of AES
Corporation, the parent of the other Applicants.
Comment Date: 5 p.m. Eastern Time on February 2, 2005.
19. Transmission Owners of the Midwest Independent Transmission System
Operator, Inc.
[Docket No. ER05-447-000]
Take notice that on January 13, 2005, the Transmission Owners of
the Midwest Independent Transmission System Operator (Midwest ISO
Transmission Owners) submitted for filing a rate schedule change
concerning the direct recovery of Midwest ISO Schedule 10 and 17 costs
assessed to Carved-Out Grandfathered Agreements by the Midwest ISO to
the transmission owners.
The Midwest ISO Transmission Owners state that this filing will be
served on all affected customers and on all applicable state
commissions and that the filing will be posted on the Midwest ISO's
home page.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
20. Arizona Public Service Company
[Docket No. ER05-448-000]
Take notice that on January 13, 2005, Arizona Public Service
Company (APS) tendered for filing revisions to its open access
transmission tariff in order to comply with Order 2003-B issued
December 20, 2004 in Docket No. RM02-1-005.
APS states that a copy of the transmittal letter has been served on
all parties listed on the Service List and that copies of the complete
filing can be found on APS' OASIS at https://
www.oatioasos.com\azps\index.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-315 Filed 1-27-05; 8:45 am]