Drawbridge Operation Regulations; Corpus Christi-Port Aransas Channel-Tule Lake, Corpus Christi, TX, 4013 [05-1559]
Download as PDF
Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Rules and Regulations
DEPARTMENT OF THE TREASURY
DEPARTMENT OF HOMELAND
SECURITY
Internal Revenue Service
Coast Guard
26 CFR Parts 1 and 602
33 CFR Part 117
[TD 9171]
[CGD08–05–009]
RIN 1545–AY87; 1545–BC03
Drawbridge Operation Regulations;
Corpus Christi—Port Aransas
Channel—Tule Lake, Corpus Christi,
TX
New Markets Tax Credit; Correction
Internal Revenue Service (IRS),
Treasury.
AGENCY:
ACTION:
Correction to final regulations.
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: This document contains
corrections to final regulations (TD
9171), that were published in the
Federal Register on Tuesday, December
28, 2004 (69 FR 77625) relating to the
new markets tax credit under section
45D.
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Tule Lake
Vertical Lift Span Highway and Railroad
Bridge across the Corpus Christi—Port
Aransas Channel, mile 14.0, at Corpus
Christi, Nueces County, TX. This
DATES: This correction is effective
deviation allows the bridge to remain
December 28, 2004.
closed to navigation for four hours on
FOR FURTHER INFORMATION CONTACT: Paul two consecutive days. This temporary
F. Handleman or Lauren R. Taylor, (202) deviation is necessary for the
622–3040 (not a toll-free number).
maintenance of the rope sheaves and for
the cleaning and lubrication of the haul
SUPPLEMENTARY INFORMATION:
and counterweight ropes of the
Background
drawbridge.
DATES: This deviation is effective from
The final regulations (TD 9171) that
7 a.m. on Thursday, February 10, 2005
are the subject of these corrections are
through 11 a.m. on Friday, February 11,
under section 45D of the Internal
2005.
Revenue Code.
ADDRESSES: Materials referred to in this
Need for Correction
document are available for inspection or
As published, TD 9171 contains errors copying at the office of the Eighth Coast
that may prove to be misleading and are Guard District, Bridge Administration
Branch, Hale Boggs Federal Building,
in need of clarification.
room 1313, 501 Magazine Street, New
Correction of Publication
Orleans, Louisiana 70130–3396 between
7 a.m. and 3 p.m., Monday through
I Accordingly, the publication of the
final regulations (TD 9171), that were the Friday, except Federal holidays. The
subject of FR Doc. 04–28325, is corrected telephone number is (504) 589–2965.
The Bridge Administration Branch of
as follows:
the Eighth Coast Guard District
I 1. On page 77626, column 3, in the
maintains the public docket for this
preamble, last full paragraph under
temporary deviation.
paragraph heading ‘‘Qualified Active
FOR FURTHER INFORMATION CONTACT:
Low-Income Community Business’’, is
David Frank, Bridge Administration
removed.
Branch, telephone (504) 589–2965.
I 2. On page 77627, column 1, in the
SUPPLEMENTARY INFORMATION: The Port
preamble under paragraph heading
of Corpus Christi Authority has
‘‘Recapture’’, first paragraph, line 21
requested a temporary deviation in
from the top of the column, the language,
order to perform required maintenance
‘‘taxable year will be not treated as a’’ is
on the rope sheaves and for the cleaning
corrected to read ‘‘taxable year will not
and lubrication of the haul and
be treated as a’’.
counterweight ropes of the Tule Lake
vertical lift span bridge across Corpus
Cynthia E. Grigsby,
Christi—Port Aransas Channel, mile
Acting Chief, Publications and Regulations
14.0 at Corpus Christi, Nueces County,
Branch, Legal Processing Division, Associate
Chief Counsel, (Procedures and
Texas. This temporary deviation will
Administration).
allow the bridge to remain in the closed[FR Doc. 05–1551 Filed 1–27–05; 8:45 am]
to-navigation position from 7 a.m. to 11
a.m. on Thursday, February 10, 2005
BILLING CODE 4830–01–P
VerDate jul<14>2003
14:20 Jan 27, 2005
Jkt 205001
PO 00000
Frm 00011
Fmt 4700
Sfmt 4700
4013
and from 7 a.m. to 11 a.m. on Friday,
February 11, 2005.
The vertical lift span bridge has a
vertical clearance of 9.0 feet above mean
high water, elevation 1.0 feet Mean Sea
Level and 11.0 feet above mean low
water, elevation ¥1.0 Mean Sea Level
in the closed-to-navigation position.
Navigation at the site of the bridge
consists mainly of oil tankers and tows
with barges. There is no recreational
pleasure craft usage at the bridge site.
Due to prior experience, as well as
coordination with waterway users, it
has been determined that this two-day
partial closure will not have a
significant effect on these vessels. The
bridge normally opens to pass
navigation an average of 850 times per
month. The bridge opens on signal as
required by 33 CFR 117.5. The bridge
will not be able to open for emergencies
during the closure period. Alternate
routes are not available.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: January 18, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05–1559 Filed 1–27–05; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD08–05–007]
Drawbridge Operation Regulations;
Gulf Intracoastal Waterway—Bayou
Boeuf, Amelia, LA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the BNSF RR
Swing Bridge across Bayou Boeuf, mile
10.2, at Amelia, St. Mary Parish, LA.
This deviation allows the bridge to
remain closed to navigation for eight
hours on February 14, 2005, ten hours
on February 15, 2005, and eight hours
on February 16, 2005. The deviation is
necessary to remove and replace the
motor and transmission of the bridge.
DATES: This deviation is effective from
8 a.m. on Monday, February 14, 2005
E:\FR\FM\28JAR1.SGM
28JAR1
Agencies
[Federal Register Volume 70, Number 18 (Friday, January 28, 2005)]
[Rules and Regulations]
[Page 4013]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-1559]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-05-009]
Drawbridge Operation Regulations; Corpus Christi--Port Aransas
Channel--Tule Lake, Corpus Christi, TX
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Tule Lake Vertical Lift Span Highway and Railroad Bridge across the
Corpus Christi--Port Aransas Channel, mile 14.0, at Corpus Christi,
Nueces County, TX. This deviation allows the bridge to remain closed to
navigation for four hours on two consecutive days. This temporary
deviation is necessary for the maintenance of the rope sheaves and for
the cleaning and lubrication of the haul and counterweight ropes of the
drawbridge.
DATES: This deviation is effective from 7 a.m. on Thursday, February
10, 2005 through 11 a.m. on Friday, February 11, 2005.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the office of the Eighth Coast Guard District,
Bridge Administration Branch, Hale Boggs Federal Building, room 1313,
501 Magazine Street, New Orleans, Louisiana 70130-3396 between 7 a.m.
and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (504) 589-2965. The Bridge Administration Branch of
the Eighth Coast Guard District maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: David Frank, Bridge Administration
Branch, telephone (504) 589-2965.
SUPPLEMENTARY INFORMATION: The Port of Corpus Christi Authority has
requested a temporary deviation in order to perform required
maintenance on the rope sheaves and for the cleaning and lubrication of
the haul and counterweight ropes of the Tule Lake vertical lift span
bridge across Corpus Christi--Port Aransas Channel, mile 14.0 at Corpus
Christi, Nueces County, Texas. This temporary deviation will allow the
bridge to remain in the closed-to-navigation position from 7 a.m. to 11
a.m. on Thursday, February 10, 2005 and from 7 a.m. to 11 a.m. on
Friday, February 11, 2005.
The vertical lift span bridge has a vertical clearance of 9.0 feet
above mean high water, elevation 1.0 feet Mean Sea Level and 11.0 feet
above mean low water, elevation -1.0 Mean Sea Level in the closed-to-
navigation position. Navigation at the site of the bridge consists
mainly of oil tankers and tows with barges. There is no recreational
pleasure craft usage at the bridge site. Due to prior experience, as
well as coordination with waterway users, it has been determined that
this two-day partial closure will not have a significant effect on
these vessels. The bridge normally opens to pass navigation an average
of 850 times per month. The bridge opens on signal as required by 33
CFR 117.5. The bridge will not be able to open for emergencies during
the closure period. Alternate routes are not available.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 18, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05-1559 Filed 1-27-05; 8:45 am]
BILLING CODE 4910-15-P