Drawbridge Operation Regulations; Corpus Christi-Port Aransas Channel-Tule Lake, Corpus Christi, TX, 4013 [05-1559]

Download as PDF Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Rules and Regulations DEPARTMENT OF THE TREASURY DEPARTMENT OF HOMELAND SECURITY Internal Revenue Service Coast Guard 26 CFR Parts 1 and 602 33 CFR Part 117 [TD 9171] [CGD08–05–009] RIN 1545–AY87; 1545–BC03 Drawbridge Operation Regulations; Corpus Christi—Port Aransas Channel—Tule Lake, Corpus Christi, TX New Markets Tax Credit; Correction Internal Revenue Service (IRS), Treasury. AGENCY: ACTION: Correction to final regulations. Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: This document contains corrections to final regulations (TD 9171), that were published in the Federal Register on Tuesday, December 28, 2004 (69 FR 77625) relating to the new markets tax credit under section 45D. SUMMARY: The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Tule Lake Vertical Lift Span Highway and Railroad Bridge across the Corpus Christi—Port Aransas Channel, mile 14.0, at Corpus Christi, Nueces County, TX. This DATES: This correction is effective deviation allows the bridge to remain December 28, 2004. closed to navigation for four hours on FOR FURTHER INFORMATION CONTACT: Paul two consecutive days. This temporary F. Handleman or Lauren R. Taylor, (202) deviation is necessary for the 622–3040 (not a toll-free number). maintenance of the rope sheaves and for the cleaning and lubrication of the haul SUPPLEMENTARY INFORMATION: and counterweight ropes of the Background drawbridge. DATES: This deviation is effective from The final regulations (TD 9171) that 7 a.m. on Thursday, February 10, 2005 are the subject of these corrections are through 11 a.m. on Friday, February 11, under section 45D of the Internal 2005. Revenue Code. ADDRESSES: Materials referred to in this Need for Correction document are available for inspection or As published, TD 9171 contains errors copying at the office of the Eighth Coast that may prove to be misleading and are Guard District, Bridge Administration Branch, Hale Boggs Federal Building, in need of clarification. room 1313, 501 Magazine Street, New Correction of Publication Orleans, Louisiana 70130–3396 between 7 a.m. and 3 p.m., Monday through I Accordingly, the publication of the final regulations (TD 9171), that were the Friday, except Federal holidays. The subject of FR Doc. 04–28325, is corrected telephone number is (504) 589–2965. The Bridge Administration Branch of as follows: the Eighth Coast Guard District I 1. On page 77626, column 3, in the maintains the public docket for this preamble, last full paragraph under temporary deviation. paragraph heading ‘‘Qualified Active FOR FURTHER INFORMATION CONTACT: Low-Income Community Business’’, is David Frank, Bridge Administration removed. Branch, telephone (504) 589–2965. I 2. On page 77627, column 1, in the SUPPLEMENTARY INFORMATION: The Port preamble under paragraph heading of Corpus Christi Authority has ‘‘Recapture’’, first paragraph, line 21 requested a temporary deviation in from the top of the column, the language, order to perform required maintenance ‘‘taxable year will be not treated as a’’ is on the rope sheaves and for the cleaning corrected to read ‘‘taxable year will not and lubrication of the haul and be treated as a’’. counterweight ropes of the Tule Lake vertical lift span bridge across Corpus Cynthia E. Grigsby, Christi—Port Aransas Channel, mile Acting Chief, Publications and Regulations 14.0 at Corpus Christi, Nueces County, Branch, Legal Processing Division, Associate Chief Counsel, (Procedures and Texas. This temporary deviation will Administration). allow the bridge to remain in the closed[FR Doc. 05–1551 Filed 1–27–05; 8:45 am] to-navigation position from 7 a.m. to 11 a.m. on Thursday, February 10, 2005 BILLING CODE 4830–01–P VerDate jul<14>2003 14:20 Jan 27, 2005 Jkt 205001 PO 00000 Frm 00011 Fmt 4700 Sfmt 4700 4013 and from 7 a.m. to 11 a.m. on Friday, February 11, 2005. The vertical lift span bridge has a vertical clearance of 9.0 feet above mean high water, elevation 1.0 feet Mean Sea Level and 11.0 feet above mean low water, elevation ¥1.0 Mean Sea Level in the closed-to-navigation position. Navigation at the site of the bridge consists mainly of oil tankers and tows with barges. There is no recreational pleasure craft usage at the bridge site. Due to prior experience, as well as coordination with waterway users, it has been determined that this two-day partial closure will not have a significant effect on these vessels. The bridge normally opens to pass navigation an average of 850 times per month. The bridge opens on signal as required by 33 CFR 117.5. The bridge will not be able to open for emergencies during the closure period. Alternate routes are not available. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: January 18, 2005. Marcus Redford, Bridge Administrator. [FR Doc. 05–1559 Filed 1–27–05; 8:45 am] BILLING CODE 4910–15–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [CGD08–05–007] Drawbridge Operation Regulations; Gulf Intracoastal Waterway—Bayou Boeuf, Amelia, LA Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the BNSF RR Swing Bridge across Bayou Boeuf, mile 10.2, at Amelia, St. Mary Parish, LA. This deviation allows the bridge to remain closed to navigation for eight hours on February 14, 2005, ten hours on February 15, 2005, and eight hours on February 16, 2005. The deviation is necessary to remove and replace the motor and transmission of the bridge. DATES: This deviation is effective from 8 a.m. on Monday, February 14, 2005 E:\FR\FM\28JAR1.SGM 28JAR1

Agencies

[Federal Register Volume 70, Number 18 (Friday, January 28, 2005)]
[Rules and Regulations]
[Page 4013]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-1559]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[CGD08-05-009]


Drawbridge Operation Regulations; Corpus Christi--Port Aransas 
Channel--Tule Lake, Corpus Christi, TX

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Eighth Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Tule Lake Vertical Lift Span Highway and Railroad Bridge across the 
Corpus Christi--Port Aransas Channel, mile 14.0, at Corpus Christi, 
Nueces County, TX. This deviation allows the bridge to remain closed to 
navigation for four hours on two consecutive days. This temporary 
deviation is necessary for the maintenance of the rope sheaves and for 
the cleaning and lubrication of the haul and counterweight ropes of the 
drawbridge.

DATES: This deviation is effective from 7 a.m. on Thursday, February 
10, 2005 through 11 a.m. on Friday, February 11, 2005.

ADDRESSES: Materials referred to in this document are available for 
inspection or copying at the office of the Eighth Coast Guard District, 
Bridge Administration Branch, Hale Boggs Federal Building, room 1313, 
501 Magazine Street, New Orleans, Louisiana 70130-3396 between 7 a.m. 
and 3 p.m., Monday through Friday, except Federal holidays. The 
telephone number is (504) 589-2965. The Bridge Administration Branch of 
the Eighth Coast Guard District maintains the public docket for this 
temporary deviation.

FOR FURTHER INFORMATION CONTACT: David Frank, Bridge Administration 
Branch, telephone (504) 589-2965.

SUPPLEMENTARY INFORMATION: The Port of Corpus Christi Authority has 
requested a temporary deviation in order to perform required 
maintenance on the rope sheaves and for the cleaning and lubrication of 
the haul and counterweight ropes of the Tule Lake vertical lift span 
bridge across Corpus Christi--Port Aransas Channel, mile 14.0 at Corpus 
Christi, Nueces County, Texas. This temporary deviation will allow the 
bridge to remain in the closed-to-navigation position from 7 a.m. to 11 
a.m. on Thursday, February 10, 2005 and from 7 a.m. to 11 a.m. on 
Friday, February 11, 2005.
    The vertical lift span bridge has a vertical clearance of 9.0 feet 
above mean high water, elevation 1.0 feet Mean Sea Level and 11.0 feet 
above mean low water, elevation -1.0 Mean Sea Level in the closed-to-
navigation position. Navigation at the site of the bridge consists 
mainly of oil tankers and tows with barges. There is no recreational 
pleasure craft usage at the bridge site. Due to prior experience, as 
well as coordination with waterway users, it has been determined that 
this two-day partial closure will not have a significant effect on 
these vessels. The bridge normally opens to pass navigation an average 
of 850 times per month. The bridge opens on signal as required by 33 
CFR 117.5. The bridge will not be able to open for emergencies during 
the closure period. Alternate routes are not available.
    In accordance with 33 CFR 117.35(c), this work will be performed 
with all due speed in order to return the bridge to normal operation as 
soon as possible. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: January 18, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05-1559 Filed 1-27-05; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.