Williams Power Company, Inc., Complainant v. California Independent System Operator Corp., Respondent; Notice of Complaint, 3692 [E5-298]

Download as PDF 3692 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on January 28, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–286 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL05–57–000] Williams Power Company, Inc., Complainant v. California Independent System Operator Corp., Respondent; Notice of Complaint January 18, 2005. Take notice that on January 14, 2005, Williams Power Company, Inc. (Williams) filed a complaint under section 206 of the Federal Power Act 16 U.S.C. 824e and section 206 of the Commission’s Rules of Practice and Procedures 18 CFR 385.206, against the California Independent System Operator VerDate jul<14>2003 19:33 Jan 25, 2005 Jkt 205001 Corporation (CAISO). Williams charges that the CAISO has improperly and unlawfully applied an unapproved tolerance band procedure to deprive minimum load cost compensation (MLCC) to generating units operating under the must-offer obligation when returning from a CAISO dispatch instruction. Williams requests a determination that the CAISO’s unilateral application of this procedure has not been authorized by the Commission and is therefore unlawful. Williams requests that the Commission direct the CAISO to reverse the application of this procedure in each and every instance that it applied the procedure, and that the Commission direct the CAISO to immediately pay MLCC, plus interest, in which the CAISO imparoperly denied MLCC by virtue of the application in this procedure. Williams states that this complaint has been served on the CAISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Comment Date: February 7, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–298 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC05–25–000, et al.] Wisconsin Electric Power Company, et al.; Electric Rate and Corporate Filings January 12, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Wisconsin Electric Power Company [Docket No. AC05–25–000] Take notice that on January 7, 2005, Wisconsin Electric Power Company (Wisconsin Electric) submitted a request a waiver of compliance in reporting in the FERC Form 1 as it pertains to the allowance for funds used during construction and electric plant instruction No. 3(17). Wisconsin Electric states that it does not own any transmission facilities. Comment Date: 5 p.m. Eastern Time on January 28, 2005. 2. Old Dominion Electric Cooperative, New Dominion Energy Cooperative, New Dominion Energy Cooperative, New Dominion Energy Cooperative [Docket Nos. EC05–1–001, ER05–18–001, ER05–20–001] Take notice that on January 7, 2005, Old Dominion Electric Cooperative (Old Dominion) and New Dominion Energy Cooperative (New Dominion) joined in filing an amendment to the above referenced dockets in response to the December 8, 2004, deficiency letter, issued by the Commission in these dockets. Old Dominion stated that a copy of this filing was served upon each of its member cooperatives, the public service commissions in the Commonwealth of Virginia and the states of Delaware, Maryland and West Virginia, and Bear Island Paper Company, LLC. Comment Date: 5 p.m. Eastern Time on January 28, 2005. 3. American Transmission Company LLC [Docket No. EC05–34–000] Take notice that on January 6, 2005, American Transmission Company LLC (ATCLLC) tendered for filing an E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 70, Number 16 (Wednesday, January 26, 2005)]
[Notices]
[Page 3692]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-298]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL05-57-000]


Williams Power Company, Inc., Complainant v. California 
Independent System Operator Corp., Respondent; Notice of Complaint

January 18, 2005.
    Take notice that on January 14, 2005, Williams Power Company, Inc. 
(Williams) filed a complaint under section 206 of the Federal Power Act 
16 U.S.C. 824e and section 206 of the Commission's Rules of Practice 
and Procedures 18 CFR 385.206, against the California Independent 
System Operator Corporation (CAISO). Williams charges that the CAISO 
has improperly and unlawfully applied an unapproved tolerance band 
procedure to deprive minimum load cost compensation (MLCC) to 
generating units operating under the must-offer obligation when 
returning from a CAISO dispatch instruction. Williams requests a 
determination that the CAISO's unilateral application of this procedure 
has not been authorized by the Commission and is therefore unlawful. 
Williams requests that the Commission direct the CAISO to reverse the 
application of this procedure in each and every instance that it 
applied the procedure, and that the Commission direct the CAISO to 
immediately pay MLCC, plus interest, in which the CAISO imparoperly 
denied MLCC by virtue of the application in this procedure.
    Williams states that this complaint has been served on the CAISO.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: February 7, 2005.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-298 Filed 1-25-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.