Notice of Intent To File Application for New License, 3698-3699 [E5-292]

Download as PDF 3698 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices 27. Duke Energy Corporation [Docket No. ER05–433–000] Take notice that on January 10, 2005, Duke Energy Corporation, on behalf of Duke Electric Transmission, (collectively, Duke) submitted a revised Network Integration Service Agreement (NITSA) with North Carolina Municipal Power Agency Number 1 (NCMPA), which is designated as Third Revised Service Agreement No. 212 under Duke Electric Transmission FERC Electric Tariff Third Revised Volume No. 4. Duke states that copies of the filing were served upon NCMPA and the South Carolina and North Carolina state public service commissions. Comment Date: 5 p.m. Eastern Time on January 31, 2005. 28. American Electric Power Service Corporation [Docket No. ER05–435–000] Take notice that on January 11, 2005, the American Electric Power Service Corporation (AEPSC) tendered for filing pursuant to section 35.15 of the Commission’s regulations, a Notice of Cancellation of an executed Interconnection and Operation Agreement between Kentucky Power Company and Kentucky Mountain Power, LLC, designated as Service Agreement No. 312 under American Electric Power Operating Companies’ Open Access Transmission Tariff. AEP requests an effective date of January 10, 2005. AEPSC states that a copy of the filing was served upon Kentucky Mountain Power, L.L.C. and the Kentucky Public Service Commission. Comment Date: 5 p.m. Eastern Time on February 1, 2005. 29. Avista Corporation [Docket No. ER05–436–000] Take notice that on January 11, 2005, Avista Corporation, submitted a nonconforming long-term service agreement between Avista Corporation and Sovereign Power, Inc., Avista Corporation FERC Rate Schedule 319, for the sale of dynamic capacity at costbased rates under Avista Corporation’s FERC Electric Tariff Volume No. 10 and energy under Avista Corporation’s FERC Electric Tariff Volume No. 9, effective January 23, 2005. Avista states that copies of the filing were served upon Sovereign Power, Inc. Comment Date: 5 p.m. Eastern Time on February 1, 2005. 30. Avista Corporation [Docket No. ER05–437–000] Take notice that on January 11, 2005, Avista Corporation (AVA) tendered for VerDate jul<14>2003 19:33 Jan 25, 2005 Jkt 205001 filing a Notice of Cancellation on rate schedule designation Service Agreement No. 15 With Cogentrix Energy Power Marketing, Inc. AVA requests an effective date of January 23, 2005. AVA states that copies of this cancellation were served upon Cogentrix Energy Power Marketing, Inc. Comment Date: 5 p.m. Eastern Time on February 1, 2005. 31. Wabash Valley Power Association, Inc. [Docket No. ER05–438–000] Take notice that on January 12, 2005, Wabash Valley Power Association, Inc. (Wabash Valley) submitted for filing Supplemental Agreements to the Wholesale Power Supply Contracts between Wabash Valley and two of its Members, Midwest Energy Cooperative, Inc. (‘‘Midwest’’) and Paulding-Putnam Electric Cooperative, Inc. Wabash Valley requests an effective date of January 1, 2005. Wabash Valley states that copies of the filing were served upon each of Wabash Valley’s Members and the public utility commissions in Illinois, Indiana, Michigan and Ohio. Comment Date: 5 p.m. Eastern Time on February 2, 2005. of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–297 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P 32. ISO New England Inc. DEPARTMENT OF ENERGY [Docket No. ER05–439–000] Federal Energy Regulatory Commission Take notice that on January 11, 2005, ISO New England Inc. (ISO) submitted an application pursuant to section 205 of the Federal Power Act to revise RTO Market Rule 1 and conforming changes to appendix F of Market Rule 1, affecting the allocation of Real-Time RMR Operating Reserve charges. The ISO states that copies of the filing have been served on all NEPOOL Participants, and the Governors and utility regulatory agencies of the New England States. Comment Date: 5 p.m. Eastern Time on February 1, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Notice of Intent To File Application for New License January 14, 2005. a. Type of Filing: Notice of intent to file application for a new license. b. Project No.: 6885. c. Date Filed: December 28, 2004. d. Submitted By: Richard Moss. e. Name of Project: Cinnamon Ranch Hydroelectric Project. f. Location: On Birch Creek and Middle Creek, near the Town of Bishop and Benton, Mono County, California. The project occupies lands of the United States within Inyo National Forest and lands administered by the U.S. Bureau of Land Management. g. Filed Pursuant to: Section 15 of the Federal Power Act; 18 CFR 16.6 of the Commission’s regulations. h. Effective Date of Current License: January 1, 1960. i. Expiration Date of Current License: December 31, 2009. j. The Project Consists of: Two diversion flumes, a 5,940-foot penstock, a powerhouse with one turbine and generator with an installed capacity of 150 kW, access roads and a 5,176-foot long 12-kV transmission line. E:\FR\FM\26JAN1.SGM 26JAN1 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices k. Pursuant to 18 CFR 16.7, information on the project is available at: Richard Moss, Cinnamon Ranch, 1049 Cinnamon Ranch Road, Bishop, CA 93514, (760) 933–2295. l. FERC Contact: Ann-Ariel Vecchio, (202) 502–6351, annariel.vecchio@ferc.gov. m. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by December 31, 2007. n. A copy of this filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number to access the document excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or TTY 202– 502–8659. A copy is also available for inspection and reproduction at the address in item k above. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support as shown in the paragraph above. Magalie R. Salas, Secretary. [FR Doc. E5–292 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–43–000] Dominion Cove Point LNG LP; Notice of Technical Conference January 13, 2005. Take notice that the Commission will convene a technical conference on Thursday, February 3, 2005, at 1 p.m. (e.s.t.), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. The purpose of the conference will be to discuss Cove Point’s proposed tariff changes related to the rights of a current holder of capacity at the LNG terminal, and the rights of others, when the contract for the capacity is scheduled to VerDate jul<14>2003 19:33 Jan 25, 2005 Jkt 205001 terminate. The Commission directed its staff to convene this technical conference in a December 23, 2004 Order in this proceeding.1 FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 208– 1659 (TTY), or send a FAX to (202) 208– 2106 with the required accommodations. All interested persons are permitted to attend. For further information please contact Jacob Silverman at (202) 502– 8445 or e-mail jacob.silverman@ferc.gov. Magalie R. Salas, Secretary. [FR Doc. E5–284 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP04–36–000 and CP04–41– 000] Weaver’s Cove Energy L.L.C. and Mill River Pipeline L.L.C.; Notice of Meeting January 14, 2005. At the request of Mayor Edward Lambert, Jr., of Fall River, Massachusetts, Chairman Pat Wood will meet with the Mayor to receive comments on the Weaver’s Cove Energy, L.L.C.’s proposed liquefied natural gas (LNG) import terminal and storage facility in Fall River, Massachusetts. The meeting will be held at the FERC headquarters at 888 First Street, NE., Washington, DC, in Hearing Room 2 from 9:30 to 10:30 a.m. (e.s.t.), Monday, January 24, 2005. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 208– 1659 (TTY), or send a FAX to (202) 208– 2106 with the required accommodations. Magalie R. Salas, Secretary. [FR Doc. E5–295 Filed 1–25–05; 8:45 am] BILLING CODE 6717–01–P 1 Dominion Cove Point LNG LP, 109 FERC ¶ 61,363 (2004). PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 3699 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the Record Communications; Public Notice January 7, 2005. This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of exempt and prohibited off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive an exempt or prohibited off-the-record communication relevant to the merit’s of a contested on-therecord proceeding, to deliver a copy of the communication, if written, or a summary of the substance of any oral communication, to the Secretary. Prohibited communications will be included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication, and may request that the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications will be included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e)(1)(v). The following is a list of prohibited and exempt communications recently received in the Office of the Secretary. The communications listed are grouped by docket numbers. These filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the eLibrary (FERRIS) link. Enter the docket number excluding the last three digits in the E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 70, Number 16 (Wednesday, January 26, 2005)]
[Notices]
[Pages 3698-3699]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-292]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Intent To File Application for New License

January 14, 2005.
    a. Type of Filing: Notice of intent to file application for a new 
license.
    b. Project No.: 6885.
    c. Date Filed: December 28, 2004.
    d. Submitted By: Richard Moss.
    e. Name of Project: Cinnamon Ranch Hydroelectric Project.
    f. Location: On Birch Creek and Middle Creek, near the Town of 
Bishop and Benton, Mono County, California. The project occupies lands 
of the United States within Inyo National Forest and lands administered 
by the U.S. Bureau of Land Management.
    g. Filed Pursuant to: Section 15 of the Federal Power Act; 18 CFR 
16.6 of the Commission's regulations.
    h. Effective Date of Current License: January 1, 1960.
    i. Expiration Date of Current License: December 31, 2009.
    j. The Project Consists of: Two diversion flumes, a 5,940-foot 
penstock, a powerhouse with one turbine and generator with an installed 
capacity of 150 kW, access roads and a 5,176-foot long 12-kV 
transmission line.

[[Page 3699]]

    k. Pursuant to 18 CFR 16.7, information on the project is available 
at: Richard Moss, Cinnamon Ranch, 1049 Cinnamon Ranch Road, Bishop, CA 
93514, (760) 933-2295.
    l. FERC Contact: Ann-Ariel Vecchio, (202) 502-6351, ann-
ariel.vecchio@ferc.gov.
    m. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a 
new license and any competing license applications must be filed with 
the Commission at least 24 months prior to the expiration of the 
existing license. All applications for license for this project must be 
filed by December 31, 2007.
    n. A copy of this filing is available for review at the Commission 
in the Public Reference Room or may be viewed on the Commission's Web 
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number to access the document excluding the last three digits in 
the docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or TTY 202-502-8659. A copy is also available for 
inspection and reproduction at the address in item k above.
    o. Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support as shown in the paragraph above.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-292 Filed 1-25-05; 8:45 am]
BILLING CODE 6717-01-P