CSX Corporation and CSX Transportation, Inc., Norfolk Southern Corporation and Norfolk Southern Railway Company-Control and Operating Leases/Agreements-Conrail Inc. and Consolidated Rail Corporation [Petition to Approve Settlement Agreement and Exempt Embraced Transactions], 3767-3768 [05-1400]
Download as PDF
Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices
Department of Transportation is
soliciting comments from Federal, state,
private sector, and not-for-profit
institutions on the topics outlined
below.
Please submit all comments
electronically to
RitaReport@rspa.dot.gov or fax to (202)
366–3671. The deadline for comments is
February 15, 2005.
FOR FURTHER INFORMATION CONTACT:
Thomas Marchessault, RSPA, by
telephone at (202) 366–4434 or Fax:
(202) 366–3671.
SUPPLEMENTARY INFORMATION: RITA is a
new Department of Transportation
(DOT) organization dedicated to
advancing the DOT’s priorities for
transportation innovation, research, and
education. RITA will integrate the
existing intermodal research and
development functions of the RSPA
Office of Innovation, Research, and
Education and the Secretary’s Office of
Intermodalism.
In addition, RITA also will
incorporate the Volpe National
Transportation Systems Center in
Cambridge, Massachusetts; the
Transportation Safety Institute in
Oklahoma City; and the Bureau of
Transportation Statistics in its entirety.
ADDRESSES:
Report to Congress
On November 30, 2004, President
Bush signed the Norman Y. Mineta
Research and Special Programs
Improvement Act (Public Law 108–426).
Section 4(g) of the Act directs the RITA
Administrator to prepare a report on the
research activities of the Department of
Transportation, for delivery to the
Committee on Transportation and
Infrastructure, the Committee on
Science of the House of Representatives,
and the Committee on Commerce,
Science, and Transportation of the
Senate. This report is due March 30,
2005, 120 days after enactment.
The report shall include the following
information:
• A summary of the mission and
strategic goals of the new RITA
Administration;
• A prioritized list of the research and
development activities that the
Department intends to pursue over the
next five (5) years;
• A description of the primary
purposes for conducting such R&D
activities such as reducing traffic
congestion, improving mobility, and
promoting safety;
• An estimate of the funding levels
needed to implement such R&D
activities for the current fiscal year; and
• Additional information the RITA
Administrator considers appropriate.
VerDate jul<14>2003
19:33 Jan 25, 2005
Jkt 205001
In developing the report, the RITA
Administrator must also:
• Solicit input from a wide range of
stakeholders;
• Take into account how the research
and development activities of other
Federal, state, private sector, and notfor-profit institutions contribute to the
achievement of the desired purposes;
and
• Address methods to avoid
unnecessary duplication of efforts in
achieving such purposes.
As a part of the stakeholder review
process, the Department of
Transportation is soliciting comments
from Federal, state, private sector, and
not-for-profit institutions on these
topics. The Department is using a
variety of venues to solicit comments by
stakeholders. This Federal Register
Notice is one method for receiving
comment. In particular, the Department
encourages comments on the following
topics:
Research Duplication
• How do we identify and avoid
unnecessary duplication in
transportation-related technology
research?
• How do we share information and
learn about opportunities to benefit
from others’ research?
The Role of Stakeholders
• What on-going communications
methods or processes might be
established with stakeholders outside of
the DOT to receive their advice and
recommendations?
• What information resources can
RITA utilize or create to leverage private
sector advances into the DOT missions
and goals?
We encourage your ideas on these
topics, and on other related topics you
may identify. The development of RITA,
its roles, direction, and responsibilities,
will be a methodical process of growth.
It may not be possible to incorporate
many of the ideas we receive in our
Congressional report. However, all ideas
and concerns identified will be
considered for integration into our
planning endeavors.
Frm 00098
Fmt 4703
Sfmt 4703
BILLING CODE 4910–60–P
DEPARTMENT OF TRANSPORTATION
Surface Transportation Board
[STB Finance Docket No. 33388 (Sub–No.
95)] 1
CSX Corporation and CSX
Transportation, Inc., Norfolk Southern
Corporation and Norfolk Southern
Railway Company—Control and
Operating Leases/Agreements—
Conrail Inc. and Consolidated Rail
Corporation [Petition to Approve
Settlement Agreement and Exempt
Embraced Transactions]
Surface Transportation Board,
DOT.
• How do we establish DOT
transportation research priorities in an
environment of limited resources?
• How do we balance research on
long-term, high-risk and high-impact
advances versus research with
immediate transportation safety and
mobility returns?
PO 00000
Issued in Washington, DC on January 14,
2005.
Thomas Marchessault,
Acting Associate Administrator, Office of
Innovation, Research and Education,
Research and Special Programs
Administration.
[FR Doc. 05–1226 Filed 1–25–05; 8:45 am]
AGENCY:
Identification of Priorities
3767
Notice of Board action with
regard to settlement agreement and 6
related exemptions.
ACTION:
SUMMARY: Under 49 U.S.C. 11327, the
Board finds that a settlement agreement
that was entered into by Norfolk
Southern Corporation and Norfolk
Southern Railway Company
(collectively, NS) and Wheeling & Lake
Erie Railway Company (W&LE), when
implemented, will satisfy certain
conditions imposed in CSX Corp. et
al.—Control—Conrail Inc. et al., 3 S.T.B.
196 (1998). Under 49 U.S.C. 10502 the
Board grants the exemption authority
sought by NS and W&LE pursuant to the
settlement agreement.
The Settlement Agreement includes 7
elements.
Element #1 provides that W&LE will
be granted overhead trackage rights,
1 This notice embraces: STB Finance Docket No.
33388 (Sub-No. 96), Wheeling & Lake Erie Railway
Co.—Trackage Rights Exemption—Norfolk
Southern Railway Co. Between Bellevue and
Toledo, OH; STB Finance Docket No. 33388 (SubNo. 97), Wheeling & Lake Erie Railway Co.—
Trackage Rights Exemption—Norfolk Southern
Railway Co. in Cleveland, OH; STB Finance Docket
No. 33388 (Sub-No. 98), Norfolk Southern Railway
Co.—Trackage Rights Exemption—Wheeling & Lake
Erie Railway Co. Between Clairton, PA and
Bellevue, OH; STB Finance Docket No. 33388 (SubNo. 99), Wheeling & Lake Erie Railway Co.—
Petition for Exemption—Purchase of the Toledo
Pivot Bridge—Norfolk Southern Railway Co.; STB
Finance Docket No. 32516 (Sub-No. 1), Wheeling &
Lake Erie Railway Co.—Lease and Operation
Exemption—Norfolk and Western Railway Co.’s
Dock at Huron, OH; and STB Finance Docket No.
32525 (Sub-No. 1), Wheeling & Lake Erie Railway
Co.—Trackage Rights Exemption—Norfolk and
Western Railway.
E:\FR\FM\26JAN1.SGM
26JAN1
3768
Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices
limited to one train per day per
direction, between Bellevue (Yeomans),
OH, at Milepost (MP) T–54.7 and
Toledo (Manhattan Jct.), OH, at MP CS–
1.30. Element #1 also provides that
W&LE will be granted back-up haulage
rights for overflow traffic. In STB
Finance Docket No. 33388 (Sub-No. 96),
the Board has granted an exemption
under 49 U.S.C. 10502 for the BellevueToledo trackage rights, which were
originally sought in a responsive
application in a rail consolidation
proceeding, subject to the labor
protective conditions set forth in
Norfolk and Western Ry. Co.—Trackage
Rights—BN, 354 I.C.C. 605, 610–15
(1978), as modified in Mendocino Coast
Ry., Inc.—Lease and Operate, 360 I.C.C.
653, 664 (1980).
Element #2 provides that W&LE will
purchase the Toledo Pivot Bridge,
which is also known as the Maumee
River Bridge (this is a railroad swing
bridge that spans the Maumee River in
Toledo, OH). In STB Finance Docket No.
33388 (Sub-No. 99), the Board has
granted a 49 U.S.C. 10502 petition for
exemption of the Toledo Pivot Bridge
purchase transaction. Any employee
affected by the Toledo Pivot Bridge
purchase exempted in STB Finance
Docket No. 33388 (Sub-No. 99) will be
protected as required by section
10902(d), subject to the standards and
procedures established in Wisconsin
Central Ltd.—Acquisition Exem.—
Union Pac. RR, 2 S.T.B. 218 (1997), aff’d
in relevant part sub nom. Association of
American Railroads v. STB, 162 F.3d
101 (D.C. Cir. 1998).
Element #3 provides for a 10-year
extension of W&LE’s lease of NS’s
Huron Dock on Lake Erie. In STB
Finance Docket No. 32516 (Sub-No. 1),
the Board has accepted a 49 CFR
1180.2(d)(4) notice of exemption
respecting the Huron Dock lease
extension. Any employee affected by the
Huron Dock lease extension exempted
in STB Finance Docket No. 32516 (SubNo. 1) will be protected by the labor
protective conditions set forth in
Mendocino Coast Ry., Inc.—Lease and
Operate, 354 I.C.C. 732 (1978), as
modified in Mendocino Coast Ry., Inc.—
Lease and Operate, 360 I.C.C. 653
(1980).
Element #4 provides for a 10-year
extension of W&LE’s Bellevue-Huron
Dock overhead trackage rights, by which
W&LE accesses Huron Dock. These
trackage rights run over the NS line
between approximately MP B242 at
Bellevue, OH, and approximately MP
B229 at Berlin Heights, OH, and
between approximately MP B232 at
Shinrock, OH (on the Bellevue-Berlin
Heights segment), and approximately
VerDate jul<14>2003
19:33 Jan 25, 2005
Jkt 205001
MP HU12.2 at the Huron Dock
connection in Huron, OH. In STB
Finance Docket No. 32525 (Sub-No. 1),
the Board has accepted a 49 CFR
1180.2(d)(4) notice of exemption
respecting the Bellevue-Huron Dock
trackage rights extension. Any employee
affected by the trackage rights exempted
in STB Finance Docket No. 32525 (SubNo. 1) will be protected by the labor
protective conditions set forth in
Norfolk and Western Ry. Co.—Trackage
Rights—BN, 354 I.C.C. 605, 610–15
(1978), as modified in Mendocino Coast
Ry., Inc.—Lease and Operate, 360 I.C.C.
653, 664 (1980).
Element #5 provides that W&LE will
be granted overhead trackage rights in
the Cleveland, OH area between Berea,
OH (at MP CD–194.2), and the Knob,
OH (at MP GZ–488.13). In STB Finance
Docket No. 33388 (Sub-No. 97), the
Board has accepted a 49 CFR
1180.2(d)(7) notice of exemption for the
Berea-Knob trackage rights. Any
employee affected by the trackage rights
exempted in STB Finance Docket No.
33388 (Sub-No. 97) will be protected by
the labor protective conditions set forth
in Norfolk and Western Ry. Co.—
Trackage Rights—BN, 354 I.C.C. 605,
610–15 (1978), as modified in
Mendocino Coast Ry., Inc.—Lease and
Operate, 360 I.C.C. 653, 664 (1980).
Element #6 provides that NS will be
granted overhead trackage rights
between Clairton, PA (at MP 5.2), and
Bellevue, OH (at MP H53.7), with
certain rights of ingress and egress at
Mingo Jct., OH, Jewett, OH, Bowerston,
OH, and Orrville, OH. In STB Finance
Docket No. 33388 (Sub-No. 98), the
Board has accepted a 49 CFR
1180.2(d)(7) notice of exemption for the
Clairton-Bellevue trackage rights. Any
employee affected by the trackage rights
exempted in STB Finance Docket No.
33388 (Sub-No. 98) will be protected by
the labor protective conditions set forth
in Norfolk and Western Ry. Co.—
Trackage Rights—BN, 354 I.C.C. 605,
610–15 (1978), as modified in
Mendocino Coast Ry., Inc.—Lease and
Operate, 360 I.C.C. 653, 664 (1980).
Element #7 provides that, to allow NS
to access a new trailer parking facility
in the Maple Heights area (Maple
Heights is located a few miles southeast
of Cleveland), NS will be granted the
right to create and use a second road atgrade crossing over W&LE’s Cleveland
Subdivision line at MP 8.67 under the
same terms and conditions that govern
NS’s use of the existing road at-grade
crossing over the W&LE line at MP 9.03.
Element #7 further provides for NS and
W&LE to negotiate a broader agreement
regarding operations in the Maple
Heights area. NS and W&LE are
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
currently evaluating two options, both
of which involve the lease, by NS, of
freight rights on the Randall Secondary.
The approval of the Settlement
Agreement, and also the 6 related
exemptions, will be effective on
February 25, 2005. Petitions for stay
must be filed by February 7, 2005.
Petitions for reconsideration must be
filed by February 15, 2005.
DATES:
Send an original and 10
copies of any pleading referring to STB
Finance Docket No. 33388 (Sub-No. 95)
and also, if appropriate, referring to any
one or more of the six embraced
dockets, to: Surface Transportation
Board, 1925 K Street, NW., Washington,
DC 20423–0001. In addition, send one
copy of any pleading to NS’s
representative (Richard A. Allen, Esq.,
Zuckert, Scoutt & Rasenberger, LLP, 888
Seventeenth Street, NW., Suite 700,
Washington, DC 20006) and also send
one copy of any pleading to W&LE’s
representative (William C. Sippel, Esq.,
Fletcher & Sippel LLC, 29 North Wacker
Drive, Suite 920, Chicago, IL 60606–
2832).
ADDRESSES:
Julia
M. Farr, 202–565–1655. [Assistance for
the hearing impaired is available
through the Federal Information Relay
Service (FIRS) at 1–800–877–8339.]
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
Additional information is contained in
the Board’s decision. To purchase a
copy of the full decision, write to, email, or call: ASAP Document
Solutions, 9332 Annapolis Rd., Suite
103, Lanham, MD 20706; e-mail:
asapdc@verizon.net; telephone: 202–
306–4004). [Assistance for the hearing
impaired is available through the
Federal Information Relay Service
(FIRS) at 1–800–877–8339.]
Board decisions and notices are
available on our Web site at
www.stb.dot.gov.
Decided: January 19, 2005.
By the Board, Chairman Nober, Vice
Chairman Buttrey, and Commissioner
Mulvey.
Vernon A. Williams,
Secretary.
[FR Doc. 05–1400 Filed 1–25–05; 8:45 am]
BILLING CODE 4915–01–P
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 70, Number 16 (Wednesday, January 26, 2005)]
[Notices]
[Pages 3767-3768]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-1400]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Surface Transportation Board
[STB Finance Docket No. 33388 (Sub-No. 95)] \1\
CSX Corporation and CSX Transportation, Inc., Norfolk Southern
Corporation and Norfolk Southern Railway Company--Control and Operating
Leases/Agreements--Conrail Inc. and Consolidated Rail Corporation
[Petition to Approve Settlement Agreement and Exempt Embraced
Transactions]
AGENCY: Surface Transportation Board, DOT.
---------------------------------------------------------------------------
\1\ This notice embraces: STB Finance Docket No. 33388 (Sub-No.
96), Wheeling & Lake Erie Railway Co.--Trackage Rights Exemption--
Norfolk Southern Railway Co. Between Bellevue and Toledo, OH; STB
Finance Docket No. 33388 (Sub-No. 97), Wheeling & Lake Erie Railway
Co.--Trackage Rights Exemption--Norfolk Southern Railway Co. in
Cleveland, OH; STB Finance Docket No. 33388 (Sub-No. 98), Norfolk
Southern Railway Co.--Trackage Rights Exemption--Wheeling & Lake
Erie Railway Co. Between Clairton, PA and Bellevue, OH; STB Finance
Docket No. 33388 (Sub-No. 99), Wheeling & Lake Erie Railway Co.--
Petition for Exemption--Purchase of the Toledo Pivot Bridge--Norfolk
Southern Railway Co.; STB Finance Docket No. 32516 (Sub-No. 1),
Wheeling & Lake Erie Railway Co.--Lease and Operation Exemption--
Norfolk and Western Railway Co.'s Dock at Huron, OH; and STB Finance
Docket No. 32525 (Sub-No. 1), Wheeling & Lake Erie Railway Co.--
Trackage Rights Exemption--Norfolk and Western Railway.
ACTION: Notice of Board action with regard to settlement agreement and
6 related exemptions.
-----------------------------------------------------------------------
SUMMARY: Under 49 U.S.C. 11327, the Board finds that a settlement
agreement that was entered into by Norfolk Southern Corporation and
Norfolk Southern Railway Company (collectively, NS) and Wheeling & Lake
Erie Railway Company (W&LE), when implemented, will satisfy certain
conditions imposed in CSX Corp. et al.--Control--Conrail Inc. et al., 3
S.T.B. 196 (1998). Under 49 U.S.C. 10502 the Board grants the exemption
authority sought by NS and W&LE pursuant to the settlement agreement.
The Settlement Agreement includes 7 elements.
Element 1 provides that W&LE will be granted overhead
trackage rights,
[[Page 3768]]
limited to one train per day per direction, between Bellevue (Yeomans),
OH, at Milepost (MP) T-54.7 and Toledo (Manhattan Jct.), OH, at MP CS-
1.30. Element 1 also provides that W&LE will be granted back-
up haulage rights for overflow traffic. In STB Finance Docket No. 33388
(Sub-No. 96), the Board has granted an exemption under 49 U.S.C. 10502
for the Bellevue-Toledo trackage rights, which were originally sought
in a responsive application in a rail consolidation proceeding, subject
to the labor protective conditions set forth in Norfolk and Western Ry.
Co.--Trackage Rights--BN, 354 I.C.C. 605, 610-15 (1978), as modified in
Mendocino Coast Ry., Inc.--Lease and Operate, 360 I.C.C. 653, 664
(1980).
Element 2 provides that W&LE will purchase the Toledo
Pivot Bridge, which is also known as the Maumee River Bridge (this is a
railroad swing bridge that spans the Maumee River in Toledo, OH). In
STB Finance Docket No. 33388 (Sub-No. 99), the Board has granted a 49
U.S.C. 10502 petition for exemption of the Toledo Pivot Bridge purchase
transaction. Any employee affected by the Toledo Pivot Bridge purchase
exempted in STB Finance Docket No. 33388 (Sub-No. 99) will be protected
as required by section 10902(d), subject to the standards and
procedures established in Wisconsin Central Ltd.--Acquisition Exem.--
Union Pac. RR, 2 S.T.B. 218 (1997), aff'd in relevant part sub nom.
Association of American Railroads v. STB, 162 F.3d 101 (D.C. Cir.
1998).
Element 3 provides for a 10-year extension of W&LE's lease
of NS's Huron Dock on Lake Erie. In STB Finance Docket No. 32516 (Sub-
No. 1), the Board has accepted a 49 CFR 1180.2(d)(4) notice of
exemption respecting the Huron Dock lease extension. Any employee
affected by the Huron Dock lease extension exempted in STB Finance
Docket No. 32516 (Sub-No. 1) will be protected by the labor protective
conditions set forth in Mendocino Coast Ry., Inc.--Lease and Operate,
354 I.C.C. 732 (1978), as modified in Mendocino Coast Ry., Inc.--Lease
and Operate, 360 I.C.C. 653 (1980).
Element 4 provides for a 10-year extension of W&LE's
Bellevue-Huron Dock overhead trackage rights, by which W&LE accesses
Huron Dock. These trackage rights run over the NS line between
approximately MP B242 at Bellevue, OH, and approximately MP B229 at
Berlin Heights, OH, and between approximately MP B232 at Shinrock, OH
(on the Bellevue-Berlin Heights segment), and approximately MP HU12.2
at the Huron Dock connection in Huron, OH. In STB Finance Docket No.
32525 (Sub-No. 1), the Board has accepted a 49 CFR 1180.2(d)(4) notice
of exemption respecting the Bellevue-Huron Dock trackage rights
extension. Any employee affected by the trackage rights exempted in STB
Finance Docket No. 32525 (Sub-No. 1) will be protected by the labor
protective conditions set forth in Norfolk and Western Ry. Co.--
Trackage Rights--BN, 354 I.C.C. 605, 610-15 (1978), as modified in
Mendocino Coast Ry., Inc.--Lease and Operate, 360 I.C.C. 653, 664
(1980).
Element 5 provides that W&LE will be granted overhead
trackage rights in the Cleveland, OH area between Berea, OH (at MP CD-
194.2), and the Knob, OH (at MP GZ-488.13). In STB Finance Docket No.
33388 (Sub-No. 97), the Board has accepted a 49 CFR 1180.2(d)(7) notice
of exemption for the Berea-Knob trackage rights. Any employee affected
by the trackage rights exempted in STB Finance Docket No. 33388 (Sub-
No. 97) will be protected by the labor protective conditions set forth
in Norfolk and Western Ry. Co.--Trackage Rights--BN, 354 I.C.C. 605,
610-15 (1978), as modified in Mendocino Coast Ry., Inc.--Lease and
Operate, 360 I.C.C. 653, 664 (1980).
Element 6 provides that NS will be granted overhead
trackage rights between Clairton, PA (at MP 5.2), and Bellevue, OH (at
MP H53.7), with certain rights of ingress and egress at Mingo Jct., OH,
Jewett, OH, Bowerston, OH, and Orrville, OH. In STB Finance Docket No.
33388 (Sub-No. 98), the Board has accepted a 49 CFR 1180.2(d)(7) notice
of exemption for the Clairton-Bellevue trackage rights. Any employee
affected by the trackage rights exempted in STB Finance Docket No.
33388 (Sub-No. 98) will be protected by the labor protective conditions
set forth in Norfolk and Western Ry. Co.--Trackage Rights--BN, 354
I.C.C. 605, 610-15 (1978), as modified in Mendocino Coast Ry., Inc.--
Lease and Operate, 360 I.C.C. 653, 664 (1980).
Element 7 provides that, to allow NS to access a new
trailer parking facility in the Maple Heights area (Maple Heights is
located a few miles southeast of Cleveland), NS will be granted the
right to create and use a second road at-grade crossing over W&LE's
Cleveland Subdivision line at MP 8.67 under the same terms and
conditions that govern NS's use of the existing road at-grade crossing
over the W&LE line at MP 9.03. Element 7 further provides for
NS and W&LE to negotiate a broader agreement regarding operations in
the Maple Heights area. NS and W&LE are currently evaluating two
options, both of which involve the lease, by NS, of freight rights on
the Randall Secondary.
DATES: The approval of the Settlement Agreement, and also the 6 related
exemptions, will be effective on February 25, 2005. Petitions for stay
must be filed by February 7, 2005. Petitions for reconsideration must
be filed by February 15, 2005.
ADDRESSES: Send an original and 10 copies of any pleading referring to
STB Finance Docket No. 33388 (Sub-No. 95) and also, if appropriate,
referring to any one or more of the six embraced dockets, to: Surface
Transportation Board, 1925 K Street, NW., Washington, DC 20423-0001. In
addition, send one copy of any pleading to NS's representative (Richard
A. Allen, Esq., Zuckert, Scoutt & Rasenberger, LLP, 888 Seventeenth
Street, NW., Suite 700, Washington, DC 20006) and also send one copy of
any pleading to W&LE's representative (William C. Sippel, Esq.,
Fletcher & Sippel LLC, 29 North Wacker Drive, Suite 920, Chicago, IL
60606-2832).
FOR FURTHER INFORMATION CONTACT: Julia M. Farr, 202-565-1655.
[Assistance for the hearing impaired is available through the Federal
Information Relay Service (FIRS) at 1-800-877-8339.]
SUPPLEMENTARY INFORMATION: Additional information is contained in the
Board's decision. To purchase a copy of the full decision, write to, e-
mail, or call: ASAP Document Solutions, 9332 Annapolis Rd., Suite 103,
Lanham, MD 20706; e-mail: asapdc@verizon.net; telephone: 202-306-4004).
[Assistance for the hearing impaired is available through the Federal
Information Relay Service (FIRS) at 1-800-877-8339.]
Board decisions and notices are available on our Web site at
www.stb.dot.gov.
Decided: January 19, 2005.
By the Board, Chairman Nober, Vice Chairman Buttrey, and
Commissioner Mulvey.
Vernon A. Williams,
Secretary.
[FR Doc. 05-1400 Filed 1-25-05; 8:45 am]