Oakdale Irrigation District, South San Joaquin Irrigation District; Notice of Authorization for Continued Project Operation, 2141-2142 [E5-95]
Download as PDF
Federal Register / Vol. 70, No. 8 / Wednesday, January 12, 2005 / Notices
filing is granted to and including July 1,
2006, as requested by the ISO.
Magalie R. Salas,
Secretary.
[FR Doc. E5–109 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–142–000]
Northwest Pipeline Corporation; Notice
of Proposed Changes in FERC Gas
Tariff
January 5, 2005.
Take notice that on December 30,
2004, Northwest Pipeline Corporation
(Northwest) tendered for filing and
acceptance the following tariff sheets as
part of its FERC Gas Tariff, Third
Revised Volume No. 1, to be effective
February 1, 2005:
Second Revised Sheet No. 370,
Seventh Revised Sheet No. 371,
Fourth Revised Sheet No. 372.
17:37 Jan 11, 2005
Jkt 205001
Magalie R. Salas,
Secretary.
[FR Doc. E5–80 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–138–000]
Northwest states that the purpose of
this filing is to change the name of the
shipper for 26 service agreements listed
as non-conforming service agreements
in Northwest’s tariff due to the
permanent release of these service
agreements.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
VerDate jul<14>2003
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Northwest Pipeline Corporation; Notice
of Proposed Changes in FERC Gas
Tariff and Filing of Non-Conforming
Service Agreements
January 5, 2005.
Take notice that on December 23,
2004, Northwest Pipeline Corporation
(Northwest) tendered for filing and
acceptance five Rate Schedule TF–1
service agreements. Northwest also
tendered the following tariff sheets as
part of its FERC Gas Tariff, Third
Revised Volume No. 1, to be effective
January 23, 2005:
First Revised Sheet No. 374,
Seventh Revised Sheet No. 377,
Fourth Revised Sheet No. 378.
Frm 00033
Fmt 4703
Sfmt 4703
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–82 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2005]
Northwest states that the purpose of
this filing is to: (1) Submit a
nonconforming negotiated rate service
agreement and four other nonconforming service agreements for
Commission acceptance for filing; and
(2) submit tariff sheets listing these
agreements in Northwest’s tariff.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
PO 00000
2141
Oakdale Irrigation District, South San
Joaquin Irrigation District; Notice of
Authorization for Continued Project
Operation
January 6, 2005.
On December 23, 2002, Oakdale and
South San Joaquin Irrigation Districts,
licensees for the Beardsley/Donnells
Project No. 2005, filed an application for
a new or subsequent license pursuant to
the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
Project No. 2005 is located on the
Middle Fork of the Stanislaus River in
Tuolumne County, California.
The license for Project No. 2005 was
issued for a period ending December 31,
2004. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
E:\FR\FM\12JAN1.SGM
12JAN1
2142
Federal Register / Vol. 70, No. 8 / Wednesday, January 12, 2005 / Notices
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on Section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensees of such project
have filed an application for a
subsequent license, the licensees may
continue to operate the project in
accordance with the terms and
conditions of the license after the minor
or minor part license expires, until the
Commission acts on their application. If
the licensees of such a project have not
filed an application for a subsequent
license, then they may be required,
pursuant to 18 CFR 16.21(b), to continue
project operations until the Commission
issues someone else a license for the
project or otherwise orders disposition
of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2005
is issued to Oakdale and South San
Joaquin Irrigation Districts for a period
effective January 1, 2005, through
December 31, 2005, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before January 1, 2006,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Oakdale and South San Joaquin
Irrigation Districts are authorized to
continue operation of the Beardsley/
Donnells Project No. 2005 until such
time as the Commission acts on their
application for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E5–95 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate jul<14>2003
17:37 Jan 11, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2067]
Oakdale Irrigation District, South San
Joaquin Irrigation District; Notice of
Authorization for Continued Project
Operation
January 6, 2005.
On December 23, 2002, Oakdale and
South San Joaquin Irrigation Districts,
licensees for the Tulloch Project No.
2067, filed an application for a new or
subsequent license pursuant to the
Federal Power Act (FPA) and the
Commission’s regulations thereunder.
Project No. 2067 is located on the
Stanislaus River in Tuolumne and
Calaveras Counties, California.
The license for Project No. 2067 was
issued for a period ending December 31,
2004. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensees of such project
have filed an application for a
subsequent license, the licensees may
continue to operate the project in
accordance with the terms and
conditions of the license after the minor
or minor part license expires, until the
Commission acts on their application. If
the licensees of such a project have not
filed an application for a subsequent
license, then they may be required,
pursuant to 18 CFR 16.21(b), to continue
project operations until the Commission
issues someone else a license for the
project or otherwise orders disposition
of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2067
is issued to Oakdale and South San
Joaquin Irrigation Districts for a period
effective January 1, 2005 through
December 31, 2005, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before January 1, 2006,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Oakdale and South San Joaquin
Irrigation Districts are authorized to
continue operation of the Tulloch
Project No. 2067 until such time as the
Commission acts on their application
for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E5–96 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2118]
Pacific Gas and Electric Company;
Notice of Authorization for Continued
Project Operation
January 6, 2005.
On December 26, 2002, Pacific Gas
and Electric Company, licensee for the
Donnells-Curtis Transmission Line
Project No. 2118, filed an application for
a new or subsequent license pursuant to
the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
Project No. 2118 is located in Tuolumne
County, California.
The license for Project No. 2118 was
issued for a period ending December 31,
2004. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 70, Number 8 (Wednesday, January 12, 2005)]
[Notices]
[Pages 2141-2142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-95]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2005]
Oakdale Irrigation District, South San Joaquin Irrigation
District; Notice of Authorization for Continued Project Operation
January 6, 2005.
On December 23, 2002, Oakdale and South San Joaquin Irrigation
Districts, licensees for the Beardsley/Donnells Project No. 2005, filed
an application for a new or subsequent license pursuant to the Federal
Power Act (FPA) and the Commission's regulations thereunder. Project
No. 2005 is located on the Middle Fork of the Stanislaus River in
Tuolumne County, California.
The license for Project No. 2005 was issued for a period ending
December 31, 2004. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year to year
[[Page 2142]]
an annual license to the then licensee under the terms and conditions
of the prior license until a new license is issued, or the project is
otherwise disposed of as provided in section 15 or any other applicable
section of the FPA. If the project's prior license waived the
applicability of section 15 of the FPA, then, based on Section 9(b) of
the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at
18 CFR 16.21(a), if the licensees of such project have filed an
application for a subsequent license, the licensees may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on their application. If the licensees of such a
project have not filed an application for a subsequent license, then
they may be required, pursuant to 18 CFR 16.21(b), to continue project
operations until the Commission issues someone else a license for the
project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2005 is issued to
Oakdale and South San Joaquin Irrigation Districts for a period
effective January 1, 2005, through December 31, 2005, or until the
issuance of a new license for the project or other disposition under
the FPA, whichever comes first. If issuance of a new license (or other
disposition) does not take place on or before January 1, 2006, notice
is hereby given that, pursuant to 18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is renewed automatically without
further order or notice by the Commission, unless the Commission orders
otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Oakdale and South San Joaquin Irrigation Districts
are authorized to continue operation of the Beardsley/Donnells Project
No. 2005 until such time as the Commission acts on their application
for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E5-95 Filed 1-11-05; 8:45 am]