Walden Energy, L.L.C.; Notice of Issuance of Order, 2147 [E5-111]
Download as PDF
Federal Register / Vol. 70, No. 8 / Wednesday, January 12, 2005 / Notices
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–137–000]
Texas Eastern Transmission, LP;
Notice of Proposed Changes in FERC
Gas Tariff
Magalie R. Salas,
Secretary.
[FR Doc. E5–92 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
January 6, 2005.
Take notice on December 30, 2004,
Texas Eastern Transmission, LP (Texas
Eastern) tendered for filing as part of its
FERC Gas Tariff, Seventh Revised
Volume No. 1 and First Revised Volume
No. 2, revised tariff sheets, as listed on
Appendix B to the filing, to become
effective February 1, 2005.
Texas Eastern states that these revised
tariff sheets are filed pursuant to section
15.1, Electric Power Cost (EPC)
Adjustment, of the General Terms and
Conditions of Texas Eastern’s FERC Gas
Tariff, Seventh Revised Volume No. 1.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate jul<14>2003
17:37 Jan 11, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–66–000, ER05–66–001]
Walden Energy, L.L.C.; Notice of
Issuance of Order
January 5, 2005.
Walden Energy, L.L.C. (Walden) filed
an application for market-based rate
authority, with an accompanying rate
tariff. The proposed rate tariff provides
for wholesale sales of energy and
capacity at market-based rates. Walden
also requested waiver of various
Commission regulations. In particular,
Walden requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by Walden.
On January 3, 2005, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development–South, granted the
request for blanket approval under part
34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Walden should file a motion
to intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is February 2, 2005.
Absent a request to be heard in
opposition by the deadline above,
Walden is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of Walden, compatible with
the public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
2147
public nor private interests will be
adversely affected by continued
approval of Walden’s issuances of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–111 Filed 1–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL88–1–008, et al.]
Indiana & Michigan Municipal
Distributors Association and City of
Auburn, Indiana et al.; Electric Rate
and Corporate Filings
January 4, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Indiana & Michigan Municipal
Distributors Association and City of
Auburn, Indiana v. Indiana Michigan
Power Company
[Docket Nos. EL88–1–008, ER88–31–007 and
ER88–32–007]
Take notice that on December 28,
2004, Indiana Michigan Power
Company (I&M) tendered a compliance
filing, pursuant to the Commission’s
June 3, 1992, Opinion No. 373 and
Order on Initial Decision, 59 FERC
¶61,260, which addressed, among other
things, the appropriateness of periodic
reviews of nuclear decommissioning
costs and funding.
I&M states that copies of the filing
were served upon its current
jurisdictional customers, the Indiana
Utility Regulatory Commission, and the
Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time
on January 18, 2005.
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 70, Number 8 (Wednesday, January 12, 2005)]
[Notices]
[Page 2147]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-111]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER05-66-000, ER05-66-001]
Walden Energy, L.L.C.; Notice of Issuance of Order
January 5, 2005.
Walden Energy, L.L.C. (Walden) filed an application for market-
based rate authority, with an accompanying rate tariff. The proposed
rate tariff provides for wholesale sales of energy and capacity at
market-based rates. Walden also requested waiver of various Commission
regulations. In particular, Walden requested that the Commission grant
blanket approval under 18 CFR part 34 of all future issuances of
securities and assumptions of liability by Walden.
On January 3, 2005, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development-South, granted the request
for blanket approval under part 34, subject to the following:
Any person desiring to be heard or to protest the blanket approval
of issuances of securities or assumptions of liability by Walden should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest, is February 2, 2005.
Absent a request to be heard in opposition by the deadline above,
Walden is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
Walden, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of Walden's issuances of securities or assumptions
of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5-111 Filed 1-11-05; 8:45 am]
BILLING CODE 6717-01-P