Aquila, Inc., et al.; Electric Rate and Corporate Filings, 1884-1886 [E5-55]
Download as PDF
1884
Federal Register / Vol. 70, No. 7 / Tuesday, January 11, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC05–30–000, et al.]
Aquila, Inc., et al.; Electric Rate and
Corporate Filings
January 3, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Aquila, Inc. and Aquila Long Term,
Inc.
[Docket No. EC05–30–000]
Take notice that on December 28,
2004, Aquila, Inc. and Aquila Long
Term, Inc. (collectively, Applicants)
tendered for filing an Application for
Authorization to Transfer Jurisdictional
Facilities to South Mississippi Electric
Power Association, pursuant to Part 33
of the Commission’s Regulations.
Applicants request privileged treatment
for Exhibit I of the Application pursuant
to section 388.112 and 33.9 of the
Commission’s regulations.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
2. ESI Energy, LLC, Energy National
Wind, LLC, Backbone Windpower
Holdings, LLC, ESI Vansycle GP, Inc.,
ESI Vansycle LP, Inc., FPL Energy
North Dakota Wind, LLC, FPL Energy
North Dakota Wind II, LLC, FPL Energy
Oklahoma Wind, LLC, FPL Energy
Pennsylvania Wind, LLC, FPL Energy
Sooner Wind, LLC, FPL Energy South
Dakota Wind, LLC, FPL Energy
Waymart GP, LLC, FPL Energy
Waymart LP, LLC, FPL Energy
Wyoming, LLC, Meyersdale
Windpower, LLC and Uinta County
Wind Farm L.L.C.
[Docket No. EC05–31–000]
Take notice that on December 29,
2004, ESI Energy, LLC, FPL Energy
National Wind, LLC, Backbone
Windpower Holdings, LLC, ESI
Vansycle GP, Inc., ESI Vansycle LP, Inc.,
FPL Energy North Dakota Wind, LLC,
FPL Energy North Dakota Wind II, LLC,
FPL Energy Oklahoma Wind, LLC, FPL
Energy Pennsylvania Wind, LLC, FPL
Energy Sooner Wind, LLC, FPL Energy
South Dakota Wind, LLC, FPL Energy
Waymart GP, LLC, FPL Energy Waymart
LP, LLC, FPL Energy Wyoming, LLC,
Meyersdale Windpower, LLC and Uinta
County Wind Farm L.L.C. (jointly,
Applicants) pursuant to section 203 of
the Federal Power Act, filed a joint
application for approval of an intracorporate reorganization. Applicants
VerDate jul<14>2003
17:22 Jan 10, 2005
Jkt 205001
state that the proposed reorganization
will not change the ultimate ownership
of the facilities directly or indirectly
owned by the Applicants.
Applicants state that a copy of the
application has been served on the
public utility commissions in the states
where the facilities are located.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
3. Puget Sound Energy, Inc.; Encogen
Northwest, L.P.
[Docket No. EC05–32–000]
Take notice that on December 29,
2004, Puget Sound Energy, Inc. (Puget)
and Encogen Northwest, L.P. (Encogen)
filed with the Federal Energy Regulatory
Commission, pursuant to section 203 of
the Federal Power Act, a Request for
Authorization to Transfer Jurisdictional
Assets with respect to the transfer to
Puget of Encogen’s 170 MW
cogenerating facility located in
Bellingham, Washington.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
4. SE Holdings, LLC
[Docket No. ER96–3107–014]
Take notice that on December 20,
2004, Strategic Energy, LLC submitted a
Notification of Change in Status that
reflects a departure from the facts relied
upon by the Commission in granting
market-based rate authority.
Comment Date: 5 p.m. eastern time on
January 10, 2005.
5. Millennium Power Partners, L.P.
[Docket Nos. ER98–830–010 and ER05–397–
000]
Take notice that on December 22,
2004, Millennium Power Partners, L.P.
(Millennium) submitted its triennial
market power report pursuant to Acadia
Power Partners, LLC, et al., 107 FERC
¶ 61,168 (2004), as well as its revised
Market-Based Rate Tariff to incorporate
the Market Behavior Rules as required
by the Commission and to allow for the
(1) sale of Ancillary Services; (2) resale
of Firm Transmission Rights,
Transmission Congestion Contracts,
Fixed Transmission Rights, Auction
Revenue Rights, or similar instruments;
and (3) reassignment of transmission
capacity.
Millennium states that copies of the
filing were served on parties on the
official service list for Docket No. ER98–
830.
Comment Date: 5 p.m. eastern time on
January 12, 2005.
6. Kincaid Generation, L.L.C.
[Docket No. ER99–1432–004]
Take notice that on December 28,
2004, Kincaid Generation, L.L.C. (KGL)
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
tendered for filing revised tariff sheets
to its market-based rate tariff, FERC
Electric Tariff, Second Revised Volume
No. 1, to change the issuing officer and
to correct the corporate name in the
header and footer. KGL requests an
effective date of December 17, 2003.
KGL states that copies of the filing
were served upon the public utility’s
jurisdictional customers and Virginia
State Corporation Commission, Ohio
Public Utilities Commission, the Public
Service Commission of West Virginia
and the Pennsylvania Public Service
Commission.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
7. American Ref-Fuel Company of
Niagara, L.P.
[Docket No. ER01–1302–004]
Take notice that on December 29,
2004, American Ref-Fuel Company of
Niagara, L.P. (ARC-Niagara) tendered for
filing a triennial market power analysis
pursuant to the Commission’s order
granting ARC-Niagara market-based rate
authority.
ARC-Niagara states that a copy of this
filing was served on the New York State
Public Service Commission.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
8. In the matter of: ER02–2559–002, ER01–
1071–003, ER02–669–004, ER02–2018–004,
ER01–2074–003, ER90–80–002, ER98–2494–
005, ER97–3359–006, ER00–3068–003,
ER03–34–002, ER98–3511–007, ER02–1903–
003, ER98–3562–007, ER99–2917–004,
ER03–179–004, ER02–2166–003, ER98–
3566–010, ER02–1838–003, ER01–838–003,
ER98–3563–007, ER98–3564–007, ER01–
1972–003, ER98–2076–006, ER03–155–003,
ER03–623–003, ER98–4222–002, ER01–
1710–003, ER01–2139–004, and ER98–1965–
003; Backbone Mountain Windpower, LLC,
Badger Windpower, LLC, Bayswater Peaking
Facility, LLC, Blythe Energy, LLC, Calhoun
Power Company I, LLC, Doswell Limited
Partnership, ESI Vansycle Partners, L.P.,
Florida Power & Light Co., FPL Energy Cape,
LLC, FPL Energy Hancock County Wind,
LLC, FPL Energy Maine Hydro, Inc., FPL
Energy Marcus Hook, L.P., FPL Energy
Mason, LLC, FPL Energy MH 50, LP, FPL
Energy New Mexico Wind, LLC, FPL Energy
Pennsylvania Wind, LLC, FPL Energy Power
Marketing, Inc., FPL Energy Seabrook, LLC,
FPL Energy Vansycle, LLC, FPL Energy
Wyman, LLC, FPL Energy Wyman IV, LLC,
Gray County Wind Energy, LLC, Hawkeye
Power Partners, LLC, High Winds, LLC,
Jamaica Bay Peaking Facility, LLC, Lake
Benton Power Partners II, LLC, Mill Run
Windpower, LLC, Somerset Windpower,
LLC, and West Texas Wind Energy Partners,
LP.
Take notice that, on December 22,
2004, Backbone Mountain Windpower,
LLC, Badger Windpower, LLC,
Bayswater Peaking Facility, LLC, Blythe
Energy, LLC, Calhoun Power Company
E:\FR\FM\11JAN1.SGM
11JAN1
Federal Register / Vol. 70, No. 7 / Tuesday, January 11, 2005 / Notices
I, LLC, Doswell Limited Partnership, ESI
Vansycle Partners, L.P., Florida Power &
Light Company, FPL Energy Cape, LLC,
FPL Energy Hancock County Wind,
LLC, FPL Energy Maine Hydro, Inc.,
FPL Energy Marcus Hook, L.P., FPL
Energy Mason, LLC, FPL Energy MH 50,
LP, FPL Energy New Mexico Wind, LLC,
FPL Energy Pennsylvania Wind, LLC,
FPL Energy Power Marketing, Inc., FPL
Energy Rhode Island Energy, L.P., FPL
Energy Seabrook, LLC, FPL Energy
Vansycle, LLC, FPL Energy Wyman,
LLC, FPL Energy Wyman IV, LLC, Gray
County Wind Energy, LLC, Hawkeye
Power Partners, LLC, High Winds, LLC,
Jamaica Bay Peaking Facility, LLC, Lake
Benton Power Partners II, LLC, Mill Run
Windpower, LLC, Somerset Windpower,
LLC, and West Texas Wind Energy
Partners, LP (collectively, Applicants)
submitted a revised market-based rate
three-year update filing pursuant to the
Commission Order Implementing New
Generation Market Power Analysis and
Mitigation Procedures, issued May 13,
2004 in Docket Nos. ER04–1406–001, et
al., 107 FERC ¶ 61,168 (2004).
Applicants state that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceedings, the Florida
Public Service Commission and the
New Hampshire Public Utilities
Commission.
Comment Date: 5 p.m. eastern time on
January 12, 2005.
9. Delmarva Power & Light Company
[Docket Nos. ER04–509–003, and ER04–
1250–002]
10. California Independent System
Operator Corporation
[Docket No. ER05–333–000]
Take notice that on December 14,
2004, the California Independent
System Operator Corporation (ISO)
tendered for filing an amended and
restated NCPA MSS Aggregator
Agreement (MSSAA) between the ISO
and Northern California Power Agency
(NCPA). The ISO requests privileged
treatment of portions of the filing. The
ISO is requesting an effective date of
January 1, 2005.
VerDate jul<14>2003
17:22 Jan 10, 2005
Jkt 205001
The ISO states that the non-privileged
elements of this filing have been served
on NCPA, the California Public Utilities
Commission, the California Electricity
Oversight Board, and all entities that are
on the official service lists for Docket
Nos. ER02–2321, ER03–1119, ER04–
1020, and ER04–690.
Comment Date: 5 p.m. eastern time on
January 13, 2005.
requests an effective date of November
30, 2004.
PJM states that copies of this filing
were served upon the parties to the
agreement and the state regulatory
commissions within the PJM region.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
11. Northeast Utilities Service Company
[Docket No. ER05–389–000]
[Docket No. ER05–385–000]
Take notice that on December 28,
2004, PJM Interconnection, L.L.C. (PJM),
submitted for filing an executed interim
interconnection service agreement
among PJM, Exelon Generation
Company L.L.C., and PECO Energy
Company, designated as Original
Service Agreement No. 1198 under
PJM’s FERC Electric Tariff, Sixth
Revised Volume No. 1. PJM requests an
effective date of November 29, 2004.
PJM states that copies of this filing
were served upon the parties to the
agreement and the state regulatory
commissions within the PJM region.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
Take notice that on December 28,
2004, Northeast Utilities Service
Company (NUSCO), on behalf of The
Connecticut Light and Power Company,
Western Massachusetts Electric
Company, Holyoke Water Power
Company and Public Service Company
of New Hampshire, submitted a Notice
of Cancellation of the rate schedules for
sales of electricity to the Town of
Danvers Electric Division (Danvers),
Littleton Electric Light Department
(Littleton), Mansfield Municipal Electric
Department (Mansfield), and UNITIL
Power Corporation (UNITIL). NUSCO
requests that the rate schedule
terminations be effective as of October
31, 2004, the date on which the rate
schedules terminated by their own
terms.
NUSCO states that a copy of this filing
has been mailed to Danvers, Littleton,
Mansfield, UNITIL, and Select Energy,
Inc.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
12. PJM Interconnection, L.L.C.
Take notice that on December 29,
2004, Delmarva Power & Light Company
(Delmarva), tendered for filing an
amendment to its September 24, 2004
filing in Docket Nos. ER04–509–001 and
ER04–1250–000. Delmarva states that
the amendment was filed in response to
a deficiency letter regarding the
September 24, 2004 filing issued on
November 23, 2004.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
1885
[Docket No. ER05–387–000]
Take notice that on December 28,
2004, PJM Interconnection, L.L.C. (PJM),
submitted for filing an executed interim
interconnection service agreement
among PJM, Conectiv Delmarva
Generation, Inc., and Delmarva Power &
Light Company d/b/a Conectiv Power
Delivery. PJM requests an effective date
of November 30, 2004.
PJM states that copies of this filing
were served upon the parties to the
agreement and the state regulatory
commissions within the PJM region.
Comment Date: 5 p.m. eastern time on
January 18, 2005.
13. PJM Interconnection, L.L.C.
[Docket No. ER05–388–000]
Take notice that on December 28,
2004, PJM Interconnection, L.L.C. (PJM),
submitted for filing an executed interim
interconnection service agreement
(Interim ISA) among PJM, Conectiv
Delmarva Generation, Inc., and
Delmarva Power & Light Company
d/b/a Conectiv Power Delivery. PJM
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
14. PJM Interconnection, L.L.C.
15. Pacific Gas and Electric Company
[Docket No. ER05–390–000]
Take notice that on December 29,
2004, Pacific Gas and Electric Company
(PG&E) submitted a Revised
Interconnection Agreement between
PG&E and the Turlock Irrigation District
(TID) designated as Pacific Gas and
Electric Company, Second Revised Rate
Schedule FERC No. 213. PG&E requests
an effective date of March 1, 2005.
PG&E states that copies of the filing
were served upon the TID, the
California Public Utilities Commission
and the California Independent System
Operator Corporation.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
16. Progress Ventures, Inc.
[Docket No. ER05–391–000]
Take notice that on December 29,
2004, Progress Ventures, Inc. (Progress
Ventures) submitted a Cost-based Sales
Tariff for Short-term Sales of Capacity
and Energy, designated as Progress
Ventures, Inc., FERC Electric Tariff,
Original Volume No. 2. Progress
Ventures requests an effective date of
June 14, 2004.
Progress Ventures states that copies of
the filing were served upon the Florida
Public Service Commission, the North
Carolina Utilities Commission and
affected customers.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
E:\FR\FM\11JAN1.SGM
11JAN1
1886
Federal Register / Vol. 70, No. 7 / Tuesday, January 11, 2005 / Notices
17. American Electric Power Service
Corporation
[Docket No. ER05–392–000]
Take notice that on December 29,
2004, the American Electric Power
Service Corporation (AEPSC), tendered
for filing an Interconnection and Local
Delivery Service Agreement designated
as Original Service Agreement No. 621,
under the Operating Companies of the
American Electric Power System’s FERC
Electric Tariff, Third Revised Volume
No. 6. AEPSC requests an effective date
of December 1, 2004.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
18. El Paso Electric Company Public
Service, Company of New Mexico and
Texas-New Mexico Power Company
[Docket No. ER05–393–000]
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
17:22 Jan 10, 2005
Magalie R. Salas,
Secretary.
[FR Doc. E5–44 Filed 1–10–05; 8:45 am]
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–55 Filed 1–10–05; 8:45 am]
[Project No. 20–038]
Jkt 205001
[Project No. 2232–455]
Duke Power Company; Notice of
Availability of Environmental
Assessment
January 4, 2005.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR part 380),
Commission staff have prepared an
environmental assessment (EA) that
analyzes the environmental impacts of
allowing Duke Power Company,
licensee for the Catawba-Wateree
Hydroelectric Project, to grant a lease of
two parcels of land, totaling 1.918 acres,
to Lake James Properties, LLC, for the
purpose of constructing a residential/
commercial marina. The marina will be
located on Lake James, one of the
project’s 11 reservoirs, in McDowell
County, North Carolina. The facility will
accommodate a total of 110 boat slips,
and will provide access to the reservoir
for the residents of The Arbor on Lake
James subdivision.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Modifying and Approving Non-Project
Use of Project Lands and Waters,’’
which was issued on December 15,
2004, and is available for review and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426. The EA may also be viewed
on the Commission’s Web site at http:/
/www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (prefaced by
P-) and excluding the last three digits,
in the docket number field to access the
Frm 00024
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
January 4, 2005.
Federal Energy Regulatory
Commission
PO 00000
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
PacifiCorp; Notice of Application for
Temporary Amendment of License and
Soliciting Comments, Motions To
Intervene, and Protests
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Take notice that on December 29,
2004, El Paso Electric Company, Public
Service Company of New Mexico, and
Texas-New Mexico Power Company
(collectively, the Parties) submitted the
New Mexico Transmission Operating
Procedures and First Revised Restated
Letter of Understanding. The Parties
request an effective date of January 1,
2005.
The Parties state that copies of the
agreement were served on Tri-State
Generation and Transmission
Association, Inc., the only other party to
the agreements.
Comment Date: 5 p.m. eastern time on
January 19, 2005.
VerDate jul<14>2003
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection.
a. Type of Application: Request to
temporarily amend the minimum flow
requirements of article 408 of the project
license.
b. Project Number: P–20–038.
c. Date Filed: December 12, 2004.
d. Applicant: PacifiCorp.
e. Name of Project: Bear River
Hydroelectric Project (FERC No. 20).
f. Location: The project is located on
the Bear River in Caribou and Franklin
Counties, Idaho.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a) 825(r) and 799 and
801.
h. Applicant Contacts: Monte Garrett,
825 NE. Multnomah, Suite 1500,
Portland, OR 97232. Phone: (503) 813–
6629.
i. FERC Contact: Any questions on
this notice should be addressed to Mr.
Robert Fletcher at (202) 502–8901, or email address: robert.fletcher@ferc.gov.
j. Deadline for filing comments and or
motions: February 7, 2005.
k. Description of Request: The parties
to the Bear River Settlement Agreement,
which include PacifiCorp, U.S. Fish and
Wildlife Service, U.S. Bureau of Land
Management, National Park Service,
U.S. Forest Service, Shoshone-Bannock
Tribes, Idaho Department of
Environmental Quality, Idaho
Department of Fish and Game, Idaho
Department of Parks and Recreation,
Idaho Council of Trout Unlimited, Idaho
Rivers United, Greater Yellowstone
Coalition, and American Whitewater,
propose to amend the Bear River
Settlement Agreement to include the
forthcoming Cove Agreement and
E:\FR\FM\11JAN1.SGM
11JAN1
Agencies
[Federal Register Volume 70, Number 7 (Tuesday, January 11, 2005)]
[Notices]
[Pages 1884-1886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-55]
[[Page 1884]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-30-000, et al.]
Aquila, Inc., et al.; Electric Rate and Corporate Filings
January 3, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Aquila, Inc. and Aquila Long Term, Inc.
[Docket No. EC05-30-000]
Take notice that on December 28, 2004, Aquila, Inc. and Aquila Long
Term, Inc. (collectively, Applicants) tendered for filing an
Application for Authorization to Transfer Jurisdictional Facilities to
South Mississippi Electric Power Association, pursuant to Part 33 of
the Commission's Regulations. Applicants request privileged treatment
for Exhibit I of the Application pursuant to section 388.112 and 33.9
of the Commission's regulations.
Comment Date: 5 p.m. eastern time on January 18, 2005.
2. ESI Energy, LLC, Energy National Wind, LLC, Backbone Windpower
Holdings, LLC, ESI Vansycle GP, Inc., ESI Vansycle LP, Inc., FPL Energy
North Dakota Wind, LLC, FPL Energy North Dakota Wind II, LLC, FPL
Energy Oklahoma Wind, LLC, FPL Energy Pennsylvania Wind, LLC, FPL
Energy Sooner Wind, LLC, FPL Energy South Dakota Wind, LLC, FPL Energy
Waymart GP, LLC, FPL Energy Waymart LP, LLC, FPL Energy Wyoming, LLC,
Meyersdale Windpower, LLC and Uinta County Wind Farm L.L.C.
[Docket No. EC05-31-000]
Take notice that on December 29, 2004, ESI Energy, LLC, FPL Energy
National Wind, LLC, Backbone Windpower Holdings, LLC, ESI Vansycle GP,
Inc., ESI Vansycle LP, Inc., FPL Energy North Dakota Wind, LLC, FPL
Energy North Dakota Wind II, LLC, FPL Energy Oklahoma Wind, LLC, FPL
Energy Pennsylvania Wind, LLC, FPL Energy Sooner Wind, LLC, FPL Energy
South Dakota Wind, LLC, FPL Energy Waymart GP, LLC, FPL Energy Waymart
LP, LLC, FPL Energy Wyoming, LLC, Meyersdale Windpower, LLC and Uinta
County Wind Farm L.L.C. (jointly, Applicants) pursuant to section 203
of the Federal Power Act, filed a joint application for approval of an
intra-corporate reorganization. Applicants state that the proposed
reorganization will not change the ultimate ownership of the facilities
directly or indirectly owned by the Applicants.
Applicants state that a copy of the application has been served on
the public utility commissions in the states where the facilities are
located.
Comment Date: 5 p.m. eastern time on January 19, 2005.
3. Puget Sound Energy, Inc.; Encogen Northwest, L.P.
[Docket No. EC05-32-000]
Take notice that on December 29, 2004, Puget Sound Energy, Inc.
(Puget) and Encogen Northwest, L.P. (Encogen) filed with the Federal
Energy Regulatory Commission, pursuant to section 203 of the Federal
Power Act, a Request for Authorization to Transfer Jurisdictional
Assets with respect to the transfer to Puget of Encogen's 170 MW
cogenerating facility located in Bellingham, Washington.
Comment Date: 5 p.m. eastern time on January 19, 2005.
4. SE Holdings, LLC
[Docket No. ER96-3107-014]
Take notice that on December 20, 2004, Strategic Energy, LLC
submitted a Notification of Change in Status that reflects a departure
from the facts relied upon by the Commission in granting market-based
rate authority.
Comment Date: 5 p.m. eastern time on January 10, 2005.
5. Millennium Power Partners, L.P.
[Docket Nos. ER98-830-010 and ER05-397-000]
Take notice that on December 22, 2004, Millennium Power Partners,
L.P. (Millennium) submitted its triennial market power report pursuant
to Acadia Power Partners, LLC, et al., 107 FERC ] 61,168 (2004), as
well as its revised Market-Based Rate Tariff to incorporate the Market
Behavior Rules as required by the Commission and to allow for the (1)
sale of Ancillary Services; (2) resale of Firm Transmission Rights,
Transmission Congestion Contracts, Fixed Transmission Rights, Auction
Revenue Rights, or similar instruments; and (3) reassignment of
transmission capacity.
Millennium states that copies of the filing were served on parties
on the official service list for Docket No. ER98-830.
Comment Date: 5 p.m. eastern time on January 12, 2005.
6. Kincaid Generation, L.L.C.
[Docket No. ER99-1432-004]
Take notice that on December 28, 2004, Kincaid Generation, L.L.C.
(KGL) tendered for filing revised tariff sheets to its market-based
rate tariff, FERC Electric Tariff, Second Revised Volume No. 1, to
change the issuing officer and to correct the corporate name in the
header and footer. KGL requests an effective date of December 17, 2003.
KGL states that copies of the filing were served upon the public
utility's jurisdictional customers and Virginia State Corporation
Commission, Ohio Public Utilities Commission, the Public Service
Commission of West Virginia and the Pennsylvania Public Service
Commission.
Comment Date: 5 p.m. eastern time on January 18, 2005.
7. American Ref-Fuel Company of Niagara, L.P.
[Docket No. ER01-1302-004]
Take notice that on December 29, 2004, American Ref-Fuel Company of
Niagara, L.P. (ARC-Niagara) tendered for filing a triennial market
power analysis pursuant to the Commission's order granting ARC-Niagara
market-based rate authority.
ARC-Niagara states that a copy of this filing was served on the New
York State Public Service Commission.
Comment Date: 5 p.m. eastern time on January 19, 2005.
8. In the matter of: ER02-2559-002, ER01-1071-003, ER02-669-004,
ER02-2018-004, ER01-2074-003, ER90-80-002, ER98-2494-005, ER97-3359-
006, ER00-3068-003, ER03-34-002, ER98-3511-007, ER02-1903-003, ER98-
3562-007, ER99-2917-004, ER03-179-004, ER02-2166-003, ER98-3566-010,
ER02-1838-003, ER01-838-003, ER98-3563-007, ER98-3564-007, ER01-
1972-003, ER98-2076-006, ER03-155-003, ER03-623-003, ER98-4222-002,
ER01-1710-003, ER01-2139-004, and ER98-1965-003; Backbone Mountain
Windpower, LLC, Badger Windpower, LLC, Bayswater Peaking Facility,
LLC, Blythe Energy, LLC, Calhoun Power Company I, LLC, Doswell
Limited Partnership, ESI Vansycle Partners, L.P., Florida Power &
Light Co., FPL Energy Cape, LLC, FPL Energy Hancock County Wind,
LLC, FPL Energy Maine Hydro, Inc., FPL Energy Marcus Hook, L.P., FPL
Energy Mason, LLC, FPL Energy MH 50, LP, FPL Energy New Mexico Wind,
LLC, FPL Energy Pennsylvania Wind, LLC, FPL Energy Power Marketing,
Inc., FPL Energy Seabrook, LLC, FPL Energy Vansycle, LLC, FPL Energy
Wyman, LLC, FPL Energy Wyman IV, LLC, Gray County Wind Energy, LLC,
Hawkeye Power Partners, LLC, High Winds, LLC, Jamaica Bay Peaking
Facility, LLC, Lake Benton Power Partners II, LLC, Mill Run
Windpower, LLC, Somerset Windpower, LLC, and West Texas Wind Energy
Partners, LP.
Take notice that, on December 22, 2004, Backbone Mountain
Windpower, LLC, Badger Windpower, LLC, Bayswater Peaking Facility, LLC,
Blythe Energy, LLC, Calhoun Power Company
[[Page 1885]]
I, LLC, Doswell Limited Partnership, ESI Vansycle Partners, L.P.,
Florida Power & Light Company, FPL Energy Cape, LLC, FPL Energy Hancock
County Wind, LLC, FPL Energy Maine Hydro, Inc., FPL Energy Marcus Hook,
L.P., FPL Energy Mason, LLC, FPL Energy MH 50, LP, FPL Energy New
Mexico Wind, LLC, FPL Energy Pennsylvania Wind, LLC, FPL Energy Power
Marketing, Inc., FPL Energy Rhode Island Energy, L.P., FPL Energy
Seabrook, LLC, FPL Energy Vansycle, LLC, FPL Energy Wyman, LLC, FPL
Energy Wyman IV, LLC, Gray County Wind Energy, LLC, Hawkeye Power
Partners, LLC, High Winds, LLC, Jamaica Bay Peaking Facility, LLC, Lake
Benton Power Partners II, LLC, Mill Run Windpower, LLC, Somerset
Windpower, LLC, and West Texas Wind Energy Partners, LP (collectively,
Applicants) submitted a revised market-based rate three-year update
filing pursuant to the Commission Order Implementing New Generation
Market Power Analysis and Mitigation Procedures, issued May 13, 2004 in
Docket Nos. ER04-1406-001, et al., 107 FERC ] 61,168 (2004).
Applicants state that copies of the filing were served on parties
on the official service list in the above-captioned proceedings, the
Florida Public Service Commission and the New Hampshire Public
Utilities Commission.
Comment Date: 5 p.m. eastern time on January 12, 2005.
9. Delmarva Power & Light Company
[Docket Nos. ER04-509-003, and ER04-1250-002]
Take notice that on December 29, 2004, Delmarva Power & Light
Company (Delmarva), tendered for filing an amendment to its September
24, 2004 filing in Docket Nos. ER04-509-001 and ER04-1250-000. Delmarva
states that the amendment was filed in response to a deficiency letter
regarding the September 24, 2004 filing issued on November 23, 2004.
Comment Date: 5 p.m. eastern time on January 19, 2005.
10. California Independent System Operator Corporation
[Docket No. ER05-333-000]
Take notice that on December 14, 2004, the California Independent
System Operator Corporation (ISO) tendered for filing an amended and
restated NCPA MSS Aggregator Agreement (MSSAA) between the ISO and
Northern California Power Agency (NCPA). The ISO requests privileged
treatment of portions of the filing. The ISO is requesting an effective
date of January 1, 2005.
The ISO states that the non-privileged elements of this filing have
been served on NCPA, the California Public Utilities Commission, the
California Electricity Oversight Board, and all entities that are on
the official service lists for Docket Nos. ER02-2321, ER03-1119, ER04-
1020, and ER04-690.
Comment Date: 5 p.m. eastern time on January 13, 2005.
11. Northeast Utilities Service Company
[Docket No. ER05-385-000]
Take notice that on December 28, 2004, Northeast Utilities Service
Company (NUSCO), on behalf of The Connecticut Light and Power Company,
Western Massachusetts Electric Company, Holyoke Water Power Company and
Public Service Company of New Hampshire, submitted a Notice of
Cancellation of the rate schedules for sales of electricity to the Town
of Danvers Electric Division (Danvers), Littleton Electric Light
Department (Littleton), Mansfield Municipal Electric Department
(Mansfield), and UNITIL Power Corporation (UNITIL). NUSCO requests that
the rate schedule terminations be effective as of October 31, 2004, the
date on which the rate schedules terminated by their own terms.
NUSCO states that a copy of this filing has been mailed to Danvers,
Littleton, Mansfield, UNITIL, and Select Energy, Inc.
Comment Date: 5 p.m. eastern time on January 18, 2005.
12. PJM Interconnection, L.L.C.
[Docket No. ER05-387-000]
Take notice that on December 28, 2004, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interim interconnection service
agreement among PJM, Conectiv Delmarva Generation, Inc., and Delmarva
Power & Light Company d/b/a Conectiv Power Delivery. PJM requests an
effective date of November 30, 2004.
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on January 18, 2005.
13. PJM Interconnection, L.L.C.
[Docket No. ER05-388-000]
Take notice that on December 28, 2004, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interim interconnection service
agreement (Interim ISA) among PJM, Conectiv Delmarva Generation, Inc.,
and Delmarva Power & Light Company d/b/a Conectiv Power Delivery. PJM
requests an effective date of November 30, 2004.
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on January 18, 2005.
14. PJM Interconnection, L.L.C.
[Docket No. ER05-389-000]
Take notice that on December 28, 2004, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interim interconnection service
agreement among PJM, Exelon Generation Company L.L.C., and PECO Energy
Company, designated as Original Service Agreement No. 1198 under PJM's
FERC Electric Tariff, Sixth Revised Volume No. 1. PJM requests an
effective date of November 29, 2004.
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on January 18, 2005.
15. Pacific Gas and Electric Company
[Docket No. ER05-390-000]
Take notice that on December 29, 2004, Pacific Gas and Electric
Company (PG&E) submitted a Revised Interconnection Agreement between
PG&E and the Turlock Irrigation District (TID) designated as Pacific
Gas and Electric Company, Second Revised Rate Schedule FERC No. 213.
PG&E requests an effective date of March 1, 2005.
PG&E states that copies of the filing were served upon the TID, the
California Public Utilities Commission and the California Independent
System Operator Corporation.
Comment Date: 5 p.m. eastern time on January 19, 2005.
16. Progress Ventures, Inc.
[Docket No. ER05-391-000]
Take notice that on December 29, 2004, Progress Ventures, Inc.
(Progress Ventures) submitted a Cost-based Sales Tariff for Short-term
Sales of Capacity and Energy, designated as Progress Ventures, Inc.,
FERC Electric Tariff, Original Volume No. 2. Progress Ventures requests
an effective date of June 14, 2004.
Progress Ventures states that copies of the filing were served upon
the Florida Public Service Commission, the North Carolina Utilities
Commission and affected customers.
Comment Date: 5 p.m. eastern time on January 19, 2005.
[[Page 1886]]
17. American Electric Power Service Corporation
[Docket No. ER05-392-000]
Take notice that on December 29, 2004, the American Electric Power
Service Corporation (AEPSC), tendered for filing an Interconnection and
Local Delivery Service Agreement designated as Original Service
Agreement No. 621, under the Operating Companies of the American
Electric Power System's FERC Electric Tariff, Third Revised Volume No.
6. AEPSC requests an effective date of December 1, 2004.
Comment Date: 5 p.m. eastern time on January 19, 2005.
18. El Paso Electric Company Public Service, Company of New Mexico and
Texas-New Mexico Power Company
[Docket No. ER05-393-000]
Take notice that on December 29, 2004, El Paso Electric Company,
Public Service Company of New Mexico, and Texas-New Mexico Power
Company (collectively, the Parties) submitted the New Mexico
Transmission Operating Procedures and First Revised Restated Letter of
Understanding. The Parties request an effective date of January 1,
2005.
The Parties state that copies of the agreement were served on Tri-
State Generation and Transmission Association, Inc., the only other
party to the agreements.
Comment Date: 5 p.m. eastern time on January 19, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-55 Filed 1-10-05; 8:45 am]
BILLING CODE 6717-01-P