Idaho: Filing of Plats of Survey, 1738-1739 [05-408]

Download as PDF 1738 Federal Register / Vol. 70, No. 6 / Monday, January 10, 2005 / Notices summer tanager (Piranga rubra cooperi), yellow-breasted chat (Icteria virens), yellow warbler (Dendroica petechia brewstri), burrowing owl (Athene cunicularia), gray vireo (Vireo vicinior), Le Conte’s thrasher (Toxostoma lecontei), crissal thrasher (Toxostoma crissali), California red-legged frog (Rana aurora draytonii), mountain yellow-legged frog (Rana muscosa), desert tortoise (Gopherus agassizii), Coachella Valley fringe-toed lizard (Uma inornata), flat-tailed horned lizard (Phyrnosoma mcalli), Coachella Valley grasshopper (Spaniacris deserticola), Coachella giant sand-treader cricket (Macrobaenetes valgum), Coachella Valley Jerusalem cricket (Stenopelmatus cahuilaensis), Coachella Valley milk vetch (Astragalus lentiginosus var. coachellae), triple-ribbed milk vetch (Astragalus tricarinatus), and little San Bernardino Mountains gilia (Linanthus maculatus). The Tribe intends for the HCP to serve four main purposes: (1) To set forth a program for protecting natural resources while managing economic development objectives for the Reservation; (2) to streamline compliance with the Act into a comprehensive Reservation-wide approach; and (3) to recognize the Tribe’s traditional sovereign land and resource management policies and practices; and (4) to provide a feasible and practicable means for the Tribe to conserve the 24 species, and for the Service to meet the responsibilities of the Act under Secretarial Order 3206 and Executive Order 13175. The proposed HCP would be a comprehensive plan that seeks to address the 24 covered species within a reserve system. Specifically, the proposed HCP would establish: (1) A Mountains and Canyons Conservation Area in which certain lands are proposed to be dedicated to the reserve system and general and species-specific conservation measures would be imposed on covered projects and/or implemented by the Tribe, and (2) a Valley Floor Conservation Area from which funding would generally be required for acquisition and management of additional reserve lands, certain lands would be dedicated to the reserve system, and additional conservation measures would be required to protect certain covered species. The proposed HCP includes avoidance and minimization measures, the establishment of the reserve system, and adaptive management and monitoring pursuant to the Act. The activities proposed to be covered by the HCP include construction and development activities and covered conservation and maintenance activities VerDate jul<14>2003 18:09 Jan 07, 2005 Jkt 205001 (including operation and maintenance of public facilities and conservation management). Public Comments With the publication of this notice, the public is encouraged to submit written comments. Comments received shall be used to identify issues and draft alternatives. All comments received from individuals on Environmental Impact Statements become part of the official public record. Requests for such comments will be handled in accordance with the Freedom of Information Act, the Council on Environmental Quality’s NEPA regulations [40 CFR 1506.6(f)], and other Service and Departmental policy and procedures. Environmental Impact Statement The Tribe and the Service have selected Helix Environmental Planning, Inc., to prepare the EIS. The document will be prepared in compliance with the National Environmental Policy Act (42 U.S.C. 4321, et seq.). Helix Environmental Planning, Inc., will prepare the EIS under the supervision of the Service, who is responsible for the scope and content of the document. The EIS will identify potentially significant direct, indirect, and cumulative impacts on biological resources, land use, air quality, water quality, water resources, economics, and other environmental issues that could occur with the implementation of the Service’s proposed actions and alternatives. The EIS will consider the proposed action, the issuance of a section 10(a)(1)(B) permit under the Act, and a reasonable range of alternatives. A detailed description of the impacts of the proposed action and each alternative will be included in the EIS. Several alternatives, including a No Action alternative will be considered and analyzed, representing varying levels of conservation, impacts, and permit area configurations. The No Action alternative means that the Service would not issue a section 10(a)(1)(B) permit. Review of this project will be conducted in accordance with the National Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 et seq.), associated regulations (40 CFR parts 1500–1508) found at (https:// www.legal.gsa.gov), other appropriate Federal laws, and Service policies and procedures for compliance with those regulations. This notice is being furnished in accordance with 40 CFR 1501.7 of the National Environmental Policy Act to obtain suggestions and information from other agencies and the PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 public on the scope of issues and alternatives to be addressed in the EIS. The primary purpose of the scoping process is to identify important issues raised by the public, related to the proposed action. Written comments from interested parties are welcome to ensure that the full range of issues related to the permit request is identified. All comments received, including names and addresses, will become part of the official administrative record and may be made available to the public. Dated: January 4, 2005. David G. Paullin, Acting Deputy Manager, California/Nevada Operations Office, Sacramento, California. [FR Doc. 05–406 Filed 1–7–05; 8:45 am] BILLING CODE 4310–55–P DEPARTMENT OF THE INTERIOR Bureau of Land Management [ID–957–1420–BJ] Idaho: Filing of Plats of Survey Bureau of Land Management, Interior. ACTION: Notice of filing of plats of surveys. AGENCY: SUMMARY: The Bureau of Land Management (BLM) has officially filed the plats of survey of the lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho, 83709–1657. SUPPLEMENTARY INFORMATION: These surveys were executed at the request of the Bureau of Land Management to meet certain administrative and management purposes: The plat constituting the entire survey record of the corrective dependent resurvey of a portion of the subdivisional lines, and the subdivision of section 3, in T. 7 N., R. 39 E., Boise Meridian, Idaho, was accepted October 1, 2004. The plat representing the dependent resurvey of a portion of the subdivisional lines, and the subdivision of sections 2 and 3, in T. 13 N., R. 28 E., Boise Meridian, Idaho, was accepted October 13, 2004. The plat representing the dependent resurvey of a portion of the south boundary, and a portion of the subdivisional lines, and the subdivision of sections 35, in T. 14 N., R. 28 E., Boise Meridian, Idaho, was accepted October 13, 2004. E:\FR\FM\10JAN1.SGM 10JAN1 Federal Register / Vol. 70, No. 6 / Monday, January 10, 2005 / Notices The plat representing the dependent resurvey of a portion of the subdivisional lines, the boundaries of certain mineral surveys, and the survey of lot 7, section 11, in T. 6 S., R. 4 W., Boise Meridian, Idaho, was accepted October 21, 2004. The plat, in two sheets, constitutes the entire survey record of the dependent resurvey of a portion of the south boundary and a portion of the subdivisional lines and a metes-andbounds survey of a portion of the Craters of the Moon National Monument in sections 23 and 33, in T. 3 N., R. 25 E., Boise Meridian, Idaho, was accepted October 21, 2004. The plat representing the dependent resurvey of a portion of the subdivisional lines, and the subdivision of sections 13, 14, and 23, in T. 16 S., R. 21 E., Boise Meridian, Idaho, was accepted November 4, 2004. The plat, in 3 sheets, constitutes the entire survey record of the dependent resurvey of portions of the north and south boundaries, and a portion of the subdivisional lines, and a metes-andbounds survey of a portion of the Craters of the Moon National Monument in sections 2, 11, 14, 22, 23, 25, 26, 27, and 36, in T. 2 N., R. 26 E., Boise Meridian, Idaho, was accepted November 5, 2004. The plat representing the dependent resurvey of a portion of the north boundary and subdivisional lines, and the subdivision of section 2, in T. 12 N., R. 7 W., Boise Meridian, Idaho, was accepted November 29, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of portions of the south boundary and subdivisional lines, and a metes-and-bounds survey of a portion of the Craters of the Moon National Monument in sections 19, 20, 21, 22, 26, 27, 35, and 36, in T. 3 S., R. 23 E., Boise Meridian, Idaho, was accepted December 3, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of portions of the east, west, and north boundaries and a portion of the subdivisional lines, and a metesand-bounds survey of a portion of the Craters of the Moon National Monument in sections 1, 5, 6, 7, 12, and 13, in T. 3 S., R. 22 E., Boise Meridian, Idaho, was accepted December 7, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of portions of the south boundary and subdivisional lines, and a metes-and-bounds survey of a portion of the Craters of the Moon National Monument in sections 32, 33, 34, 35, and 36, in T. 2 S., R. 22 E., Boise VerDate jul<14>2003 18:09 Jan 07, 2005 Jkt 205001 Meridian, Idaho, was accepted December 9, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of a portion of the subdivisional lines, and a metes-andbounds survey of a portion of the Craters of the Moon National Monument in sections 11, 12, 14, 15, 16, and 17, in T. 3 S., R. 21 E., Boise Meridian, Idaho, was accepted December 10, 2004. The plat representing the dependent resurvey of a portion of the east boundary, a portion of the subdivisional lines, and a portion of Mineral Survey Numbers 1827, 1936, 1946 and 3368, in T. 14 N., R. 23 E., Boise Meridian, Idaho, was accepted December 14, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of portions of the north boundary and subdivisional lines, and a metes-and-bounds survey of a portion of the Craters of the Moon National Monument in sections 4, 9, 16, 21, and 28, in T. 1 N., R. 27 E., Boise Meridian, Idaho, was accepted December 14, 2004. The plat, in 2 sheets, constitutes the entire survey record of the dependent resurvey of a portion of the Boise Base Line (north boundary), a portion of the south boundary, and a portion of the subdivisional lines, and the subdivision of section 13 and a metes-and-bounds survey of a portion of the Craters of the Moon National Monument in sections 2, 11, 12, 13, and 35, in T. 1 S., R. 27 E., Boise Meridian, Idaho, was accepted December 15, 2004. The plat constitutes the entire survey record of the dependent resurvey of a portion of the subdivisional lines, and a metes-and-bounds survey of a portion of the Craters of the Moon National Monument in sections 2, 11, and 14, in T. 2 S., R. 27 E., Boise Meridian, Idaho, was accepted December 16, 2004. SUMMARY: The Bureau of Land Management (BLM) will file the plat of survey of the lands described below in the BLM Idaho State Office, Boise, Idaho, 30 days from the date of publication in the Federal Register. This survey was executed at the request of the U.S. Forest Service to meet certain administrative and management purposes: The plat representing the survey of portions of the Atlanta Correction Line (south bdy.), north boundary and subdivisional lines, in T. 7 N., R. 13 E., Boise Meridian, Idaho, was accepted December 16, 2004. Dated: January 4, 2005. Stanley G. French, Chief Cadastral Surveyor for Idaho. [FR Doc. 05–408 Filed 1–7–05; 8:45 am] BILLING CODE 4310–GG–P PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 1739 INTERNATIONAL TRADE COMMISSION [Investigation No. 731–TA–1069 (Final)] Outboard Engines from Japan United States International Trade Commission. ACTION: Revised schedule for the subject investigation. AGENCY: EFFECTIVE DATE: January 5, 2005. FOR FURTHER INFORMATION CONTACT: Olympia Hand (202–205–3182), Office of Investigations, U.S. International Trade Commission, 500 E Street SW., Washington, DC 20436. Hearingimpaired persons can obtain information on this matter by contacting the Commission’s TDD terminal on 202– 205–1810. Persons with mobility impairments who will need special assistance in gaining access to the Commission should contact the Office of the Secretary at 202–205–2000. General information concerning the Commission may also be obtained by accessing its Internet server (https:// www.usitc.gov). The public record for this investigation may be viewed on the Commission’s electronic docket (EDIS) at https://edis.usitc.gov. SUPPLEMENTARY INFORMATION: On August 12, 2004, the Commission established a schedule for the conduct of the final phase of the subject investigation (69 FR 51859, August 23, 2004). Under section 735(b)(2)(B) of the Tariff Act of 1930 (19 U.S.C. 1673d(b)(2)(B)) (the Act), the Commission’s final injury determination is to be made by the 45th day after the day on which the administering authority makes its final affirmative antidumping determination. Commerce’s final determination was published in the Federal Register on January 4, 2005 (70 FR 326). Accordingly, the Commission hereby gives notice that it is revising the schedule for its final determination. The Commission’s new schedule for the remainder of the investigation is as follows: the final staff report will be placed in the nonpublic record and released to the parties on January 19, 2005; the Commission will make its final release of information on January 25, 2005; and final party comments are due on January 27, 2005. For further information concerning this investigation see the Commission’s notice cited above and the Commission’s Rules of Practice and Procedure, part 201, subparts A through E (19 CFR part 201), and part 207, subparts A and C (19 CFR part 207). Authority: This investigation is being conducted under authority of title VII of the E:\FR\FM\10JAN1.SGM 10JAN1

Agencies

[Federal Register Volume 70, Number 6 (Monday, January 10, 2005)]
[Notices]
[Pages 1738-1739]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-408]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[ID-957-1420-BJ]


Idaho: Filing of Plats of Survey

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of filing of plats of surveys.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) has officially filed the 
plats of survey of the lands described below in the BLM Idaho State 
Office, Boise, Idaho, effective 9 a.m., on the dates specified.

FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South 
Vinnell Way, Boise, Idaho, 83709-1657.

SUPPLEMENTARY INFORMATION: These surveys were executed at the request 
of the Bureau of Land Management to meet certain administrative and 
management purposes:
    The plat constituting the entire survey record of the corrective 
dependent resurvey of a portion of the subdivisional lines, and the 
subdivision of section 3, in T. 7 N., R. 39 E., Boise Meridian, Idaho, 
was accepted October 1, 2004.
    The plat representing the dependent resurvey of a portion of the 
subdivisional lines, and the subdivision of sections 2 and 3, in T. 13 
N., R. 28 E., Boise Meridian, Idaho, was accepted October 13, 2004.
    The plat representing the dependent resurvey of a portion of the 
south boundary, and a portion of the subdivisional lines, and the 
subdivision of sections 35, in T. 14 N., R. 28 E., Boise Meridian, 
Idaho, was accepted October 13, 2004.

[[Page 1739]]

    The plat representing the dependent resurvey of a portion of the 
subdivisional lines, the boundaries of certain mineral surveys, and the 
survey of lot 7, section 11, in T. 6 S., R. 4 W., Boise Meridian, 
Idaho, was accepted October 21, 2004.
    The plat, in two sheets, constitutes the entire survey record of 
the dependent resurvey of a portion of the south boundary and a portion 
of the subdivisional lines and a metes-and-bounds survey of a portion 
of the Craters of the Moon National Monument in sections 23 and 33, in 
T. 3 N., R. 25 E., Boise Meridian, Idaho, was accepted October 21, 
2004.
    The plat representing the dependent resurvey of a portion of the 
subdivisional lines, and the subdivision of sections 13, 14, and 23, in 
T. 16 S., R. 21 E., Boise Meridian, Idaho, was accepted November 4, 
2004.
    The plat, in 3 sheets, constitutes the entire survey record of the 
dependent resurvey of portions of the north and south boundaries, and a 
portion of the subdivisional lines, and a metes-and-bounds survey of a 
portion of the Craters of the Moon National Monument in sections 2, 11, 
14, 22, 23, 25, 26, 27, and 36, in T. 2 N., R. 26 E., Boise Meridian, 
Idaho, was accepted November 5, 2004.
    The plat representing the dependent resurvey of a portion of the 
north boundary and subdivisional lines, and the subdivision of section 
2, in T. 12 N., R. 7 W., Boise Meridian, Idaho, was accepted November 
29, 2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of portions of the south boundary and subdivisional 
lines, and a metes-and-bounds survey of a portion of the Craters of the 
Moon National Monument in sections 19, 20, 21, 22, 26, 27, 35, and 36, 
in T. 3 S., R. 23 E., Boise Meridian, Idaho, was accepted December 3, 
2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of portions of the east, west, and north boundaries 
and a portion of the subdivisional lines, and a metes-and-bounds survey 
of a portion of the Craters of the Moon National Monument in sections 
1, 5, 6, 7, 12, and 13, in T. 3 S., R. 22 E., Boise Meridian, Idaho, 
was accepted December 7, 2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of portions of the south boundary and subdivisional 
lines, and a metes-and-bounds survey of a portion of the Craters of the 
Moon National Monument in sections 32, 33, 34, 35, and 36, in T. 2 S., 
R. 22 E., Boise Meridian, Idaho, was accepted December 9, 2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of a portion of the subdivisional lines, and a 
metes-and-bounds survey of a portion of the Craters of the Moon 
National Monument in sections 11, 12, 14, 15, 16, and 17, in T. 3 S., 
R. 21 E., Boise Meridian, Idaho, was accepted December 10, 2004.
    The plat representing the dependent resurvey of a portion of the 
east boundary, a portion of the subdivisional lines, and a portion of 
Mineral Survey Numbers 1827, 1936, 1946 and 3368, in T. 14 N., R. 23 
E., Boise Meridian, Idaho, was accepted December 14, 2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of portions of the north boundary and subdivisional 
lines, and a metes-and-bounds survey of a portion of the Craters of the 
Moon National Monument in sections 4, 9, 16, 21, and 28, in T. 1 N., R. 
27 E., Boise Meridian, Idaho, was accepted December 14, 2004.
    The plat, in 2 sheets, constitutes the entire survey record of the 
dependent resurvey of a portion of the Boise Base Line (north 
boundary), a portion of the south boundary, and a portion of the 
subdivisional lines, and the subdivision of section 13 and a metes-and-
bounds survey of a portion of the Craters of the Moon National Monument 
in sections 2, 11, 12, 13, and 35, in T. 1 S., R. 27 E., Boise 
Meridian, Idaho, was accepted December 15, 2004.
    The plat constitutes the entire survey record of the dependent 
resurvey of a portion of the subdivisional lines, and a metes-and-
bounds survey of a portion of the Craters of the Moon National Monument 
in sections 2, 11, and 14, in T. 2 S., R. 27 E., Boise Meridian, Idaho, 
was accepted December 16, 2004.

SUMMARY: The Bureau of Land Management (BLM) will file the plat of 
survey of the lands described below in the BLM Idaho State Office, 
Boise, Idaho, 30 days from the date of publication in the Federal 
Register. This survey was executed at the request of the U.S. Forest 
Service to meet certain administrative and management purposes:
    The plat representing the survey of portions of the Atlanta 
Correction Line (south bdy.), north boundary and subdivisional lines, 
in T. 7 N., R. 13 E., Boise Meridian, Idaho, was accepted December 16, 
2004.

    Dated: January 4, 2005.
Stanley G. French,
Chief Cadastral Surveyor for Idaho.
[FR Doc. 05-408 Filed 1-7-05; 8:45 am]
BILLING CODE 4310-GG-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.