Idaho: Filing of Plats of Survey, 1738-1739 [05-408]
Download as PDF
1738
Federal Register / Vol. 70, No. 6 / Monday, January 10, 2005 / Notices
summer tanager (Piranga rubra cooperi),
yellow-breasted chat (Icteria virens),
yellow warbler (Dendroica petechia
brewstri), burrowing owl (Athene
cunicularia), gray vireo (Vireo vicinior),
Le Conte’s thrasher (Toxostoma
lecontei), crissal thrasher (Toxostoma
crissali), California red-legged frog
(Rana aurora draytonii), mountain
yellow-legged frog (Rana muscosa),
desert tortoise (Gopherus agassizii),
Coachella Valley fringe-toed lizard
(Uma inornata), flat-tailed horned lizard
(Phyrnosoma mcalli), Coachella Valley
grasshopper (Spaniacris deserticola),
Coachella giant sand-treader cricket
(Macrobaenetes valgum), Coachella
Valley Jerusalem cricket (Stenopelmatus
cahuilaensis), Coachella Valley milk
vetch (Astragalus lentiginosus var.
coachellae), triple-ribbed milk vetch
(Astragalus tricarinatus), and little San
Bernardino Mountains gilia (Linanthus
maculatus).
The Tribe intends for the HCP to serve
four main purposes: (1) To set forth a
program for protecting natural resources
while managing economic development
objectives for the Reservation; (2) to
streamline compliance with the Act into
a comprehensive Reservation-wide
approach; and (3) to recognize the
Tribe’s traditional sovereign land and
resource management policies and
practices; and (4) to provide a feasible
and practicable means for the Tribe to
conserve the 24 species, and for the
Service to meet the responsibilities of
the Act under Secretarial Order 3206
and Executive Order 13175.
The proposed HCP would be a
comprehensive plan that seeks to
address the 24 covered species within a
reserve system. Specifically, the
proposed HCP would establish: (1) A
Mountains and Canyons Conservation
Area in which certain lands are
proposed to be dedicated to the reserve
system and general and species-specific
conservation measures would be
imposed on covered projects and/or
implemented by the Tribe, and (2) a
Valley Floor Conservation Area from
which funding would generally be
required for acquisition and
management of additional reserve lands,
certain lands would be dedicated to the
reserve system, and additional
conservation measures would be
required to protect certain covered
species. The proposed HCP includes
avoidance and minimization measures,
the establishment of the reserve system,
and adaptive management and
monitoring pursuant to the Act. The
activities proposed to be covered by the
HCP include construction and
development activities and covered
conservation and maintenance activities
VerDate jul<14>2003
18:09 Jan 07, 2005
Jkt 205001
(including operation and maintenance
of public facilities and conservation
management).
Public Comments
With the publication of this notice,
the public is encouraged to submit
written comments. Comments received
shall be used to identify issues and draft
alternatives. All comments received
from individuals on Environmental
Impact Statements become part of the
official public record. Requests for such
comments will be handled in
accordance with the Freedom of
Information Act, the Council on
Environmental Quality’s NEPA
regulations [40 CFR 1506.6(f)], and other
Service and Departmental policy and
procedures.
Environmental Impact Statement
The Tribe and the Service have
selected Helix Environmental Planning,
Inc., to prepare the EIS. The document
will be prepared in compliance with the
National Environmental Policy Act (42
U.S.C. 4321, et seq.). Helix
Environmental Planning, Inc., will
prepare the EIS under the supervision of
the Service, who is responsible for the
scope and content of the document.
The EIS will identify potentially
significant direct, indirect, and
cumulative impacts on biological
resources, land use, air quality, water
quality, water resources, economics, and
other environmental issues that could
occur with the implementation of the
Service’s proposed actions and
alternatives. The EIS will consider the
proposed action, the issuance of a
section 10(a)(1)(B) permit under the Act,
and a reasonable range of alternatives. A
detailed description of the impacts of
the proposed action and each alternative
will be included in the EIS. Several
alternatives, including a No Action
alternative will be considered and
analyzed, representing varying levels of
conservation, impacts, and permit area
configurations. The No Action
alternative means that the Service
would not issue a section 10(a)(1)(B)
permit.
Review of this project will be
conducted in accordance with the
National Environmental Policy Act of
1969, as amended (42 U.S.C. 4321 et
seq.), associated regulations (40 CFR
parts 1500–1508) found at (https://
www.legal.gsa.gov), other appropriate
Federal laws, and Service policies and
procedures for compliance with those
regulations. This notice is being
furnished in accordance with 40 CFR
1501.7 of the National Environmental
Policy Act to obtain suggestions and
information from other agencies and the
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
public on the scope of issues and
alternatives to be addressed in the EIS.
The primary purpose of the scoping
process is to identify important issues
raised by the public, related to the
proposed action. Written comments
from interested parties are welcome to
ensure that the full range of issues
related to the permit request is
identified. All comments received,
including names and addresses, will
become part of the official
administrative record and may be made
available to the public.
Dated: January 4, 2005.
David G. Paullin,
Acting Deputy Manager, California/Nevada
Operations Office, Sacramento, California.
[FR Doc. 05–406 Filed 1–7–05; 8:45 am]
BILLING CODE 4310–55–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[ID–957–1420–BJ]
Idaho: Filing of Plats of Survey
Bureau of Land Management,
Interior.
ACTION: Notice of filing of plats of
surveys.
AGENCY:
SUMMARY: The Bureau of Land
Management (BLM) has officially filed
the plats of survey of the lands
described below in the BLM Idaho State
Office, Boise, Idaho, effective 9 a.m., on
the dates specified.
FOR FURTHER INFORMATION CONTACT:
Bureau of Land Management, 1387
South Vinnell Way, Boise, Idaho,
83709–1657.
SUPPLEMENTARY INFORMATION: These
surveys were executed at the request of
the Bureau of Land Management to meet
certain administrative and management
purposes:
The plat constituting the entire survey
record of the corrective dependent
resurvey of a portion of the
subdivisional lines, and the subdivision
of section 3, in T. 7 N., R. 39 E., Boise
Meridian, Idaho, was accepted October
1, 2004.
The plat representing the dependent
resurvey of a portion of the
subdivisional lines, and the subdivision
of sections 2 and 3, in T. 13 N., R. 28
E., Boise Meridian, Idaho, was accepted
October 13, 2004.
The plat representing the dependent
resurvey of a portion of the south
boundary, and a portion of the
subdivisional lines, and the subdivision
of sections 35, in T. 14 N., R. 28 E.,
Boise Meridian, Idaho, was accepted
October 13, 2004.
E:\FR\FM\10JAN1.SGM
10JAN1
Federal Register / Vol. 70, No. 6 / Monday, January 10, 2005 / Notices
The plat representing the dependent
resurvey of a portion of the
subdivisional lines, the boundaries of
certain mineral surveys, and the survey
of lot 7, section 11, in T. 6 S., R. 4 W.,
Boise Meridian, Idaho, was accepted
October 21, 2004.
The plat, in two sheets, constitutes
the entire survey record of the
dependent resurvey of a portion of the
south boundary and a portion of the
subdivisional lines and a metes-andbounds survey of a portion of the
Craters of the Moon National Monument
in sections 23 and 33, in T. 3 N., R. 25
E., Boise Meridian, Idaho, was accepted
October 21, 2004.
The plat representing the dependent
resurvey of a portion of the
subdivisional lines, and the subdivision
of sections 13, 14, and 23, in T. 16 S.,
R. 21 E., Boise Meridian, Idaho, was
accepted November 4, 2004.
The plat, in 3 sheets, constitutes the
entire survey record of the dependent
resurvey of portions of the north and
south boundaries, and a portion of the
subdivisional lines, and a metes-andbounds survey of a portion of the
Craters of the Moon National Monument
in sections 2, 11, 14, 22, 23, 25, 26, 27,
and 36, in T. 2 N., R. 26 E., Boise
Meridian, Idaho, was accepted
November 5, 2004.
The plat representing the dependent
resurvey of a portion of the north
boundary and subdivisional lines, and
the subdivision of section 2, in T. 12 N.,
R. 7 W., Boise Meridian, Idaho, was
accepted November 29, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of portions of the south
boundary and subdivisional lines, and a
metes-and-bounds survey of a portion of
the Craters of the Moon National
Monument in sections 19, 20, 21, 22, 26,
27, 35, and 36, in T. 3 S., R. 23 E., Boise
Meridian, Idaho, was accepted
December 3, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of portions of the east, west,
and north boundaries and a portion of
the subdivisional lines, and a metesand-bounds survey of a portion of the
Craters of the Moon National Monument
in sections 1, 5, 6, 7, 12, and 13, in T.
3 S., R. 22 E., Boise Meridian, Idaho,
was accepted December 7, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of portions of the south
boundary and subdivisional lines, and a
metes-and-bounds survey of a portion of
the Craters of the Moon National
Monument in sections 32, 33, 34, 35,
and 36, in T. 2 S., R. 22 E., Boise
VerDate jul<14>2003
18:09 Jan 07, 2005
Jkt 205001
Meridian, Idaho, was accepted
December 9, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of a portion of the
subdivisional lines, and a metes-andbounds survey of a portion of the
Craters of the Moon National Monument
in sections 11, 12, 14, 15, 16, and 17, in
T. 3 S., R. 21 E., Boise Meridian, Idaho,
was accepted December 10, 2004.
The plat representing the dependent
resurvey of a portion of the east
boundary, a portion of the subdivisional
lines, and a portion of Mineral Survey
Numbers 1827, 1936, 1946 and 3368, in
T. 14 N., R. 23 E., Boise Meridian,
Idaho, was accepted December 14, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of portions of the north
boundary and subdivisional lines, and a
metes-and-bounds survey of a portion of
the Craters of the Moon National
Monument in sections 4, 9, 16, 21, and
28, in T. 1 N., R. 27 E., Boise Meridian,
Idaho, was accepted December 14, 2004.
The plat, in 2 sheets, constitutes the
entire survey record of the dependent
resurvey of a portion of the Boise Base
Line (north boundary), a portion of the
south boundary, and a portion of the
subdivisional lines, and the subdivision
of section 13 and a metes-and-bounds
survey of a portion of the Craters of the
Moon National Monument in sections 2,
11, 12, 13, and 35, in T. 1 S., R. 27 E.,
Boise Meridian, Idaho, was accepted
December 15, 2004.
The plat constitutes the entire survey
record of the dependent resurvey of a
portion of the subdivisional lines, and a
metes-and-bounds survey of a portion of
the Craters of the Moon National
Monument in sections 2, 11, and 14, in
T. 2 S., R. 27 E., Boise Meridian, Idaho,
was accepted December 16, 2004.
SUMMARY: The Bureau of Land
Management (BLM) will file the plat of
survey of the lands described below in
the BLM Idaho State Office, Boise,
Idaho, 30 days from the date of
publication in the Federal Register.
This survey was executed at the request
of the U.S. Forest Service to meet
certain administrative and management
purposes:
The plat representing the survey of
portions of the Atlanta Correction Line
(south bdy.), north boundary and
subdivisional lines, in T. 7 N., R. 13 E.,
Boise Meridian, Idaho, was accepted
December 16, 2004.
Dated: January 4, 2005.
Stanley G. French,
Chief Cadastral Surveyor for Idaho.
[FR Doc. 05–408 Filed 1–7–05; 8:45 am]
BILLING CODE 4310–GG–P
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
1739
INTERNATIONAL TRADE
COMMISSION
[Investigation No. 731–TA–1069 (Final)]
Outboard Engines from Japan
United States International
Trade Commission.
ACTION: Revised schedule for the subject
investigation.
AGENCY:
EFFECTIVE DATE:
January 5, 2005.
FOR FURTHER INFORMATION CONTACT:
Olympia Hand (202–205–3182), Office
of Investigations, U.S. International
Trade Commission, 500 E Street SW.,
Washington, DC 20436. Hearingimpaired persons can obtain
information on this matter by contacting
the Commission’s TDD terminal on 202–
205–1810. Persons with mobility
impairments who will need special
assistance in gaining access to the
Commission should contact the Office
of the Secretary at 202–205–2000.
General information concerning the
Commission may also be obtained by
accessing its Internet server (https://
www.usitc.gov). The public record for
this investigation may be viewed on the
Commission’s electronic docket (EDIS)
at https://edis.usitc.gov.
SUPPLEMENTARY INFORMATION: On August
12, 2004, the Commission established a
schedule for the conduct of the final
phase of the subject investigation (69 FR
51859, August 23, 2004). Under section
735(b)(2)(B) of the Tariff Act of 1930 (19
U.S.C. 1673d(b)(2)(B)) (the Act), the
Commission’s final injury determination
is to be made by the 45th day after the
day on which the administering
authority makes its final affirmative
antidumping determination.
Commerce’s final determination was
published in the Federal Register on
January 4, 2005 (70 FR 326).
Accordingly, the Commission hereby
gives notice that it is revising the
schedule for its final determination.
The Commission’s new schedule for
the remainder of the investigation is as
follows: the final staff report will be
placed in the nonpublic record and
released to the parties on January 19,
2005; the Commission will make its
final release of information on January
25, 2005; and final party comments are
due on January 27, 2005.
For further information concerning
this investigation see the Commission’s
notice cited above and the
Commission’s Rules of Practice and
Procedure, part 201, subparts A through
E (19 CFR part 201), and part 207,
subparts A and C (19 CFR part 207).
Authority: This investigation is being
conducted under authority of title VII of the
E:\FR\FM\10JAN1.SGM
10JAN1
Agencies
[Federal Register Volume 70, Number 6 (Monday, January 10, 2005)]
[Notices]
[Pages 1738-1739]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-408]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[ID-957-1420-BJ]
Idaho: Filing of Plats of Survey
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of filing of plats of surveys.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) has officially filed the
plats of survey of the lands described below in the BLM Idaho State
Office, Boise, Idaho, effective 9 a.m., on the dates specified.
FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South
Vinnell Way, Boise, Idaho, 83709-1657.
SUPPLEMENTARY INFORMATION: These surveys were executed at the request
of the Bureau of Land Management to meet certain administrative and
management purposes:
The plat constituting the entire survey record of the corrective
dependent resurvey of a portion of the subdivisional lines, and the
subdivision of section 3, in T. 7 N., R. 39 E., Boise Meridian, Idaho,
was accepted October 1, 2004.
The plat representing the dependent resurvey of a portion of the
subdivisional lines, and the subdivision of sections 2 and 3, in T. 13
N., R. 28 E., Boise Meridian, Idaho, was accepted October 13, 2004.
The plat representing the dependent resurvey of a portion of the
south boundary, and a portion of the subdivisional lines, and the
subdivision of sections 35, in T. 14 N., R. 28 E., Boise Meridian,
Idaho, was accepted October 13, 2004.
[[Page 1739]]
The plat representing the dependent resurvey of a portion of the
subdivisional lines, the boundaries of certain mineral surveys, and the
survey of lot 7, section 11, in T. 6 S., R. 4 W., Boise Meridian,
Idaho, was accepted October 21, 2004.
The plat, in two sheets, constitutes the entire survey record of
the dependent resurvey of a portion of the south boundary and a portion
of the subdivisional lines and a metes-and-bounds survey of a portion
of the Craters of the Moon National Monument in sections 23 and 33, in
T. 3 N., R. 25 E., Boise Meridian, Idaho, was accepted October 21,
2004.
The plat representing the dependent resurvey of a portion of the
subdivisional lines, and the subdivision of sections 13, 14, and 23, in
T. 16 S., R. 21 E., Boise Meridian, Idaho, was accepted November 4,
2004.
The plat, in 3 sheets, constitutes the entire survey record of the
dependent resurvey of portions of the north and south boundaries, and a
portion of the subdivisional lines, and a metes-and-bounds survey of a
portion of the Craters of the Moon National Monument in sections 2, 11,
14, 22, 23, 25, 26, 27, and 36, in T. 2 N., R. 26 E., Boise Meridian,
Idaho, was accepted November 5, 2004.
The plat representing the dependent resurvey of a portion of the
north boundary and subdivisional lines, and the subdivision of section
2, in T. 12 N., R. 7 W., Boise Meridian, Idaho, was accepted November
29, 2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of portions of the south boundary and subdivisional
lines, and a metes-and-bounds survey of a portion of the Craters of the
Moon National Monument in sections 19, 20, 21, 22, 26, 27, 35, and 36,
in T. 3 S., R. 23 E., Boise Meridian, Idaho, was accepted December 3,
2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of portions of the east, west, and north boundaries
and a portion of the subdivisional lines, and a metes-and-bounds survey
of a portion of the Craters of the Moon National Monument in sections
1, 5, 6, 7, 12, and 13, in T. 3 S., R. 22 E., Boise Meridian, Idaho,
was accepted December 7, 2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of portions of the south boundary and subdivisional
lines, and a metes-and-bounds survey of a portion of the Craters of the
Moon National Monument in sections 32, 33, 34, 35, and 36, in T. 2 S.,
R. 22 E., Boise Meridian, Idaho, was accepted December 9, 2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of a portion of the subdivisional lines, and a
metes-and-bounds survey of a portion of the Craters of the Moon
National Monument in sections 11, 12, 14, 15, 16, and 17, in T. 3 S.,
R. 21 E., Boise Meridian, Idaho, was accepted December 10, 2004.
The plat representing the dependent resurvey of a portion of the
east boundary, a portion of the subdivisional lines, and a portion of
Mineral Survey Numbers 1827, 1936, 1946 and 3368, in T. 14 N., R. 23
E., Boise Meridian, Idaho, was accepted December 14, 2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of portions of the north boundary and subdivisional
lines, and a metes-and-bounds survey of a portion of the Craters of the
Moon National Monument in sections 4, 9, 16, 21, and 28, in T. 1 N., R.
27 E., Boise Meridian, Idaho, was accepted December 14, 2004.
The plat, in 2 sheets, constitutes the entire survey record of the
dependent resurvey of a portion of the Boise Base Line (north
boundary), a portion of the south boundary, and a portion of the
subdivisional lines, and the subdivision of section 13 and a metes-and-
bounds survey of a portion of the Craters of the Moon National Monument
in sections 2, 11, 12, 13, and 35, in T. 1 S., R. 27 E., Boise
Meridian, Idaho, was accepted December 15, 2004.
The plat constitutes the entire survey record of the dependent
resurvey of a portion of the subdivisional lines, and a metes-and-
bounds survey of a portion of the Craters of the Moon National Monument
in sections 2, 11, and 14, in T. 2 S., R. 27 E., Boise Meridian, Idaho,
was accepted December 16, 2004.
SUMMARY: The Bureau of Land Management (BLM) will file the plat of
survey of the lands described below in the BLM Idaho State Office,
Boise, Idaho, 30 days from the date of publication in the Federal
Register. This survey was executed at the request of the U.S. Forest
Service to meet certain administrative and management purposes:
The plat representing the survey of portions of the Atlanta
Correction Line (south bdy.), north boundary and subdivisional lines,
in T. 7 N., R. 13 E., Boise Meridian, Idaho, was accepted December 16,
2004.
Dated: January 4, 2005.
Stanley G. French,
Chief Cadastral Surveyor for Idaho.
[FR Doc. 05-408 Filed 1-7-05; 8:45 am]
BILLING CODE 4310-GG-P