Notice of Application Accepted For Filing and Soliciting Motions To Intervene, Protests, and Comments, 1225-1226 [E5-2]

Download as PDF Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–1 Filed 1–5–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted For Filing and Soliciting Motions To Intervene, Protests, and Comments December 30, 2004. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary permit. b. Project No.: 12519–000. c. Date Filed: July 12, 2004, and supplemented on November 1, 2004. d. Applicant: Florida Hydro, Inc. e. Name of Project: Gulf Stream Energy Project. f. Location: On Gulf Stream in the Atlantic Ocean, near Palm Beach County, Florida. No Federal land or facilities would be used. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Michael J. Hoover, Florida Hydro, Inc., 171 Comfort Road, Palatka, FL 33177, (386) 328–2368. i. FERC Contact: Robert Bell, (202) 502–6062. j. Deadline for Filing Comments, Protests, and Motions To Intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The proposed project would consist of: (1) A generation farm containing up to 8 submerged two-counter rotating fiberglass blades and integrated turbine generating units having a total installed capacity of 2 to 3 megawatts, (2) a proposed 3-mile-long, sub marine VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 transmission line, and (3) appurtenant facilities. The project would have an annual generation of 17.52 gigawatt-hours that would be sold to a local utility. l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h. above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit: Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application: Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. p. Notice of Intent: A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be PO 00000 Frm 00006 Fmt 4703 Sfmt 4703 1225 filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies Under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file E:\FR\FM\06JAN1.SGM 06JAN1 1226 Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–2 Filed 1–5–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests December 30, 2004. Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection: a. Type of Applications: Preliminary permit (competing). b. Applicants, Project Numbers, and Dates Filed: Birch Power Company filed the application for Project No. 12536– 000 on September 9, 2004. Hydrodynamics, LLC filed the application for Project No. 12547–000 on September 22, 2004. c. Name of the project is Mill Coulee Lower Project. The project would be located on the Mill Coulee Canal in Cascade County, Montana. It would use the U.S. Bureau of Reclamation’s existing Greenfield Irrigation District canal system. d. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. e. Applicants Contacts: For Birch Power Company: Mr. Ted Sorenson, Birch Power Company, 5203 South 11th Avenue E, Idaho Falls, ID 83404, (208) 522–8069. For Hydrodynamics, LLC: Mr. Roger Kirk, Hydrodynamics, LLC, P.O. Box 1136, Bozeman, MT 59771– 1136, (406) 587–5086. f. FERC Contact: Robert Bell, (202) 502–6062. g. Deadline for Filing Comments, Protests, and Motions to Intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 h. Description of Projects: The project proposed by Birch Power Company would use the irrigation Canal system owned by the Greenfield Irrigation District and operate in a run-of-river mode and would consist of: (1) A Diversion structure, crest elevation of 3,893 feet, on the Mill Coulee Canal, (2) a proposed 480-foot-long, 54-inchdiameter penstock, (3) a proposed powerhouse containing one generating unit with a total installed capacity of 370 kilowatts, (4) a proposed 1⁄4-milelong, 69-KV transmission line; and (5) appurtenant facilities. The Birch Power Company project would have an average annual generation of 1.6 gigawatt-hours. The project proposed by Hydrodynamics, LLC would use the irrigation Canal system owned by the Greenfield Irrigation District and operate in a run-of-river mode and would consist of (1) a Diversion structure, crest elevation of 3,893 feet, on the Mill Coulee Canal, (2) a proposed 480-foot-long, 54-inch-diameter penstock, (3) a proposed powerhouse containing one generating unit with a total installed capacity of 370 kilowatts, (4) a proposed 1⁄4-mile-long, 69-KV transmission line; and (5) appurtenant facilities. The Hydrodynamics, LLC project would have an average annual generation of 1.6 gigawatt-hours. i. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE., Room 2A, Washington DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h. above. j. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. k. Competing Preliminary Permit: Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. l. Competing Development Application: Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. m. Notice of Intent: A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. n. Proposed Scope of Studies Under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; See 18 CFR E:\FR\FM\06JAN1.SGM 06JAN1

Agencies

[Federal Register Volume 70, Number 4 (Thursday, January 6, 2005)]
[Notices]
[Pages 1225-1226]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted For Filing and Soliciting Motions 
To Intervene, Protests, and Comments

December 30, 2004.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary permit.
    b. Project No.: 12519-000.
    c. Date Filed: July 12, 2004, and supplemented on November 1, 2004.
    d. Applicant: Florida Hydro, Inc.
    e. Name of Project: Gulf Stream Energy Project.
    f. Location: On Gulf Stream in the Atlantic Ocean, near Palm Beach 
County, Florida. No Federal land or facilities would be used.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Michael J. Hoover, Florida Hydro, Inc., 
171 Comfort Road, Palatka, FL 33177, (386) 328-2368.
    i. FERC Contact: Robert Bell, (202) 502-6062.
    j. Deadline for Filing Comments, Protests, and Motions To 
Intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Project: The proposed project would consist of: 
(1) A generation farm containing up to 8 submerged two-counter rotating 
fiberglass blades and integrated turbine generating units having a 
total installed capacity of 2 to 3 megawatts, (2) a proposed 3-mile-
long, sub marine transmission line, and (3) appurtenant facilities.
    The project would have an annual generation of 17.52 gigawatt-hours 
that would be sold to a local utility.
    l. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street, NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or TTY, 
contact (202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item h. above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit: Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    o. Competing Development Application: Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent: A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    q. Proposed Scope of Studies Under Permit: A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    t. Agency Comments: Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file

[[Page 1226]]

comments within the time specified for filing comments, it will be 
presumed to have no comments. One copy of an agency's comments must 
also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-2 Filed 1-5-05; 8:45 am]
BILLING CODE 6717-01-P