Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 1237-1238 [E5-15]

Download as PDF Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. s. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. t. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. u. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–14 Filed 1–5–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments December 30, 2004. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary permit. b. Project No.: 12562–000. c. Date Filed: November 29, 2004. d. Applicant: Warmsprings Irrigation District. e. Name of Project: Warmsprings Dam Project. f. Location: On the Malheur River, in Malheur County, Oregon. Would utilize the existing U.S. Bureau of Reclamation’s Warmsprings Dam. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Dave Castleberry, Manager, Warmsprings Irrigation District, 334 Main Street North, Vale, OR 97918, (541) 473–3951 and Mr. Brent L. Smith, President, Northwest Power Services, Inc., P.O. Box 535, Rigby, ID 83442, (208) 745– 0834. i. FERC Contact: Robert Bell, (202) 502–6062. j. Deadline for Filing Comments, Protests, and Motions to Intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The project proposes to use the U.S. Bureau of Reclamation’s Warmsprings Dam and would consist of: (1) A proposed intake structure; (2) a proposed 100-foot-long, 60-inch-diameter steel penstock; (3) a proposed powerhouse containing a PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 1237 generating unit having an installed capacity of 2.2 MW; (4) a proposed 6mile-long, 15-kV transmission line; and (5) appurtenant facilities. The project would have an annual generation of 6.6 GWh that would be sold to a local utility. l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE., Room 2A, Washington DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h. above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. p. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include E:\FR\FM\06JAN1.SGM 06JAN1 1238 Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 k. Description of Project: The proposed project would consist of (1) two existing intake canals: (a) the 3,100foot long, north Channel 200 feet wide at intake narrowing to 80 feet wide where it becomes the north headrace at intersection with Main Street, (b) the south channel 110 feet wide at the intake narrowing to 50 feet as it Magalie R. Salas, becomes the south headrace, (2) a Secretary. proposed powerhouse containing two [FR Doc. E5–15 Filed 1–5–05; 8:45 am] generating units having a total installed BILLING CODE 6717–01–P capacity of 6.4 megawatts, (3) a proposed 400-foot-long, 34 kilovolt transmission line, and (4) appurtenant DEPARTMENT OF ENERGY facilities. The project would have an annual generation of 28.2 gigawattFederal Energy Regulatory hours that would be sold to a local Commission utility. l. Locations of Applications: A copy of Notice of Application Accepted for the application is available for Filing and Soliciting Motions To inspection and reproduction at the Intervene, Protests, and Comments Commission in the Public Reference Room, located at 888 First Street, NE., December 30, 2004. Room 2A, Washington DC 20426, or by Take notice that the following hydroelectric application has been filed calling (202) 502–8371. This filing may also be viewed on the Commission’s with the Commission and is available Web site at https://www.ferc.gov using for public inspection: the ‘‘eLibrary’’ link. Enter the docket a. Type of Application: Preliminary number excluding the last three digits in permit. the docket number field to access the b. Project No.: 12552–000. document. For assistance, please contact c. Date Filed: October 12, 2004. FERC Online Support at d. Applicant: Marseilles Land and FERCOnlineSupport@ferc.gov or toll Water Company. free at 1–866–208–3676, or TTY, contact e. Name of Project: MLWC Project. (202) 502–8659. A copy is also available f. Location: On the Illinois River, in La for inspection and reproduction at the Salle County, Illinois. The Marseilles address in item h. above. Lock and Dam is administered by the m. Individuals desiring to be included U.S. Army Corps of Engineers. This on the Commission’s mailing list should project is for additional capacity to the so indicate by writing to the Secretary already licensed Marseilles Project of the Commission. FERC No. 12020 to the Marseilles Hydro n. Competing Preliminary Permit— Power, LLC. Anyone desiring to file a competing g. Filed Pursuant to: Federal Power application for preliminary permit for a Act, 16 U.S.C. 791(a)–825(r). proposed project must submit the h. Applicant Contact: Mr. Lee W. competing application itself, or a notice Mueller, President, Marseilles Land and of intent to file such an application, to Water Company, 4132 S. Rainbow Blvd., the Commission on or before the #247, Las Vegas, NV 89103, (702) 367– specified comment date for the 7302. particular application (see 18 CFR 4.36). i. FERC Contact: Robert Bell, (202) Submission of a timely notice of intent 502–6062. allows an interested person to file the j. Deadline for Filing Comments, competing preliminary permit Protests, and Motions To Intervene: 60 application no later than 30 days after days from the issuance date of this the specified comment date for the notice. particular application. A competing The Commission’s Rules of Practice preliminary permit application must and Procedure require all intervenors conform with 18 CFR 4.30(b) and 4.36. o. Competing Development filing documents with the Commission Application—Any qualified to serve a copy of that document on development applicant desiring to file a each person in the official service list competing development application for the project. Further, if an intervenor must submit to the Commission, on or files comments or documents with the before a specified comment date for the Commission relating to the merits of an issue that may affect the responsibilities particular application, either a competing development application or a of a particular resource agency, they notice of intent to file such an must also serve a copy of the document application. Submission of a timely on that resource agency. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1

Agencies

[Federal Register Volume 70, Number 4 (Thursday, January 6, 2005)]
[Notices]
[Pages 1237-1238]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-15]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene, Protests, and Comments

December 30, 2004.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary permit.
    b. Project No.: 12562-000.
    c. Date Filed: November 29, 2004.
    d. Applicant: Warmsprings Irrigation District.
    e. Name of Project: Warmsprings Dam Project.
    f. Location: On the Malheur River, in Malheur County, Oregon. Would 
utilize the existing U.S. Bureau of Reclamation's Warmsprings Dam.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Dave Castleberry, Manager, Warmsprings 
Irrigation District, 334 Main Street North, Vale, OR 97918, (541) 473-
3951 and Mr. Brent L. Smith, President, Northwest Power Services, Inc., 
P.O. Box 535, Rigby, ID 83442, (208) 745-0834.
    i. FERC Contact: Robert Bell, (202) 502-6062.
    j. Deadline for Filing Comments, Protests, and Motions to 
Intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Project: The project proposes to use the U.S. 
Bureau of Reclamation's Warmsprings Dam and would consist of: (1) A 
proposed intake structure; (2) a proposed 100-foot-long, 60-inch-
diameter steel penstock; (3) a proposed powerhouse containing a 
generating unit having an installed capacity of 2.2 MW; (4) a proposed 
6-mile-long, 15-kV transmission line; and (5) appurtenant facilities. 
The project would have an annual generation of 6.6 GWh that would be 
sold to a local utility.
    l. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street NE., Room 2A, 
Washington DC 20426, or by calling (202) 502-8371. This filing may also 
be viewed on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or TTY, 
contact (202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item h. above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    o. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include

[[Page 1238]]

an unequivocal statement of intent to submit, if such an application 
may be filed, either a preliminary permit application or a development 
application (specify which type of application). A notice of intent 
must be served on the applicant(s) named in this public notice.
    q. Proposed Scope of Studies Under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions To Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001 (a)(1)(iii) and 
the instructions on the Commission's Web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    t. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-15 Filed 1-5-05; 8:45 am]
BILLING CODE 6717-01-P