[Federal Register: November 2, 2009 (Volume 74, Number 210)]
[Notices]               
[Page 56598]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02no09-23]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12683-002]

 
Three Guys Hydroelectric Company, LLC; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

October 23, 2009.
    On September 1, 2009, Three Guys Hydroelectric Company, LLC filed 
an application for a successive preliminary permit, pursuant to section 
4(f) of the Federal Power Act, proposing to study the feasibility of 
the R. D. Bailey Dam Hydroelectric Project No. 12683, to be located at 
the existing R. D. Bailey Dam, on the Guyandotte River, in Mingo 
County, West Virginia. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The existing R. D. Bailey Dam is owned and operated by the U.S. 
Corps of Engineers, and includes the existing reservoir, dam, outlet 
works, and tailrace. The proposed project would consist of: (1) A new 
60-foot-long by 40-foot-wide powerhouse to be located on the downstream 
side of R. D. Bailey dam below the outlet works; (2) a new bifurcating 
steel structure consisting of a 100-foot-long gated bypassed outlet and 
a 150-foot-long, 11-foot-diameter penstock; (3) two new turbine 
generator units for a total installed capacity of 7.8 megawatts; (4) a 
new 6.5-mile-long, 14.7-kilovolt transmission line; and (5) appurtenant 
facilities. The proposed project would operate in run-of-river mode and 
generate an estimated average annual generation of 30,000 megawatt-
hours.
    Applicant Contact: Mr. M. Clifford Phillips, Advanced Hydro 
Solutions LLC, 150 North Miller Road, Suite 450C, Fairlawn, OH 44333.
    FERC Contact: Michael Watts, (202) 502-6123.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``eFiling'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at http://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at http://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
12683) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-26240 Filed 10-30-09; 8:45 am]

BILLING CODE 6717-01-P