Search and Track the Federal Register
Department or Agency:
Show:
Regulations Filed: All Dates
Between and
Full Text (optional):

[Federal Register: October 23, 2009 (Volume 74, Number 204)]
[
Rules and Regulations]               
[Page 54754]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr23oc09-4]                         

=======================================================================

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket Number USCG-2009-0913]

 
Drawbridge Operation Regulations; Upper Mississippi River, 

Clinton, IA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Eighth Coast Guard District has issued a 

temporary deviation from the regulation governing the operations of the 

Clinton Railroad Drawbridge across the Upper Mississippi River, Mile 

518.0, Clinton, Iowa. The deviation is necessary to allow time for 

performing needed maintenance and repairs to the bridge. This deviation 

allows the bridge to open on signal if at least 24 hours' advance 

notice is given from 12:01 a.m., December 15, 2009 until 9 a.m., March 

15, 2010.

DATES: This deviation is effective from 12:01 a.m., December 15, 2009 

until 9 a.m., March 15, 2010.

ADDRESSES: Documents mentioned in this preamble as being available in 

the docket are part of docket USCG-2009-0913 and are available online 

by going to http://www.regulations.gov, inserting USCG-2009-0913 in the 

``Keyword'' and then clicking ``Search''. They are also available for 

inspection or copying at the Docket Management Facility (M-30), U.S. 

Department of Transportation, West Building Ground Floor, Room W12-140, 

1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 

p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 

call or e-mail Roger K. Wiebusch, Bridge Administrator, Coast Guard; 

telephone (314) 269-2378, e-mail Roger.K.Wiebusch@uscg.mil. If you have 

questions on viewing the docket, call Renee V. Wright, Program Manager, 

Docket Operations, telephone (202) 366-9826.

SUPPLEMENTARY INFORMATION: The Union Pacific Railroad Company requested 

a temporary deviation for the Clinton Railroad Drawbridge, across the 

Upper Mississippi, mile 518.0, at Clinton, Iowa to open on signal if at 

least 24 hours' advance notice is given in order to facilitate needed 

bridge maintenance and repairs. The Clinton Railroad Drawbridge 

currently operates in accordance with 33 CFR 117.5, which states the 

general requirement that drawbridges shall open promptly and fully for 

the passage of vessels when a request to open is given in accordance 

with the subpart. In order to facilitate the needed bridge work, the 

drawbridge must be kept in the closed-to-navigation position. This 

deviation allows the bridge to open on signal if at least 24 hours' 

advance notice is given from 12:01 a.m. December 15, 2009 until 9 a.m., 

March 15, 2010.

    There are no alternate routes for vessels transiting this section 

of the Upper Mississippi River.

    The Clinton Railroad Drawbridge, in the closed-to-navigation 

position, provides a vertical clearance of 18.7 feet above normal pool. 

Navigation on the waterway consists primarily of commercial tows and 

recreational watercraft. This temporary deviation has been coordinated 

with waterway users. No objections were received.

    In accordance with 33 CFR 117.35(e), the drawbridge shall return to 

its regular operating schedule immediately at the end of the designated 

time period. This deviation from the operating regulations is 

authorized under 33 CFR 117.35.

    Dated: October 6, 2009.

Roger K. Wiebusch,

Bridge Administrator.

[FR Doc. E9-25598 Filed 10-22-09; 8:45 am]

BILLING CODE 4910-15-P