Western Area Power Administration August 2023 – Federal Register Recent Federal Regulation Documents

Boulder Canyon Project
Document Number: 2023-18849
Type: Notice
Date: 2023-08-31
Agency: Department of Energy, Western Area Power Administration
The Deputy Secretary confirms, approves, and places into effect on a final basis the Boulder Canyon Project base charge and rates for fiscal year 2024 under Rate Schedule BCP-F11. The base charge increased 11.3 percent from $66.8 million in FY 2023 to $74.3 million in FY 2024. The change is primarily the result of an increase in the Bureau of Reclamation's (Reclamation) replacement costs, an increase in WAPA's operations and maintenance (O&M) expenses and replacement costs, and a decrease in prior year carryover funds from FY 2023.
Pacific Northwest-Pacific Southwest Intertie Project and Parker-Davis Project-Rate Order No. WAPA-210
Document Number: 2023-18737
Type: Notice
Date: 2023-08-30
Agency: Department of Energy, Western Area Power Administration
The extension of the Desert Southwest Region's (DSW) existing transmission service rates for the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) and the existing transmission and firm electric service formula rates for the Parker-Davis Project (PDP) have been confirmed, approved, and placed into effect on an interim basis. The existing rates under Rate Schedules INT-FT5, INT-NFT4, PD-F7, PD- FT7, PD-FCT7, and PD-NFT7 are set to expire on September 30, 2023. This rate extension makes no changes to the existing rates and extends them through September 30, 2024.
Formula Rates for Central Valley Project Power, Transmission, and Ancillary Services; and California-Oregon Transmission Project Transmission Service-Rate Order No. WAPA-207
Document Number: 2023-18748
Type: Notice
Date: 2023-08-30
Agency: Department of Energy, Western Area Power Administration
The Sierra Nevada Region (SN) of the Western Area Power Administration (WAPA) proposes new formula rates for the Central Valley Project (CVP) power, transmission, and ancillary services; and California-Oregon Transmission Project (COTP) transmission service. The existing formula rates for these services expire on September 24, 2024, and December 31, 2024. SN proposes to keep the same formula rates, without adjustments, for these services. SN proposes no material changes aside from updating the effective dates.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.