Reclamation Bureau – Federal Register Recent Federal Regulation Documents

Crooked River Valley Rehabilitation Project
Document Number: 2015-20603
Type: Notice
Date: 2015-08-20
Agency: Rural Housing Service, Reclamation Bureau
This notice announces the availability of the ROD to fund implementation of Crooked River Valley Rehabilitation Project in Idaho County, Idaho. BPA has decided to fund implementation of Alternative 2 identified in the Crooked River Valley Rehabilitation Project Final Environmental Impact Statement (DOE/EIS-0506, June 2015). Alternative 2 consists of: (1) Constructing a 6,000 foot temporary bypass channel and temporary access road/levee and, following construction of the channel, removing and decommissioning these structures; (2) regrading approximately 115 acres of floodplain by moving dredge tailings; (3) filling in approximately 10,960 feet of the current channel, reconstructing approximately 7,400 feet of new channel, and constructing more than 2,700 feet of side channels; (4) replanting the valley bottom with native and approved non-native plant species; (5) staging materials and equipment at campgrounds; and (6) monitoring project activities and effectiveness. All mitigation measures identified in the environmental impact statement (EIS) are adopted.
Final Environmental Impact Report/Environmental Impact Statement for Upper Truckee River Restoration and Golf Course Reconfiguration Project
Document Number: 2011-25845
Type: Notice
Date: 2011-10-07
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The final Environmental Impact Report/Environmental Impact Statement for the Upper Truckee River Restoration and Golf Course Reconfiguration Project is available for public review and comment. The Bureau of Reclamation, the California Department of Parks and Recreation, and the Tahoe Regional Planning Agency have evaluated comments and are recommending a preferred alternative for approval. The preferred alternative includes river ecosystem restoration with a reconfigured 18-hole golf course.
Colorado River Basin Salinity Control Advisory Council
Document Number: 2011-25620
Type: Notice
Date: 2011-10-04
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below. The meeting of the Council is open to the public.
Status Report of Water Service, Repayment, and Other Water-Related Contract Actions
Document Number: 2011-25002
Type: Notice
Date: 2011-09-29
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation and are new, modified, discontinued, or completed since the last publication of this notice on July 27, 2011. From the date of this publication, future notices during this calendar year will be limited to new, modified, discontinued, or completed contract actions. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
Central Valley Project Improvement Act; Refuge Water Management Plans
Document Number: 2011-24338
Type: Notice
Date: 2011-09-22
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent Department of the Interior administrative review process, the Bureau of Reclamation developed and published the Criteria for Developing Refuge Water Management Plans (Refuge Criteria). Several entities have each developed a Refuge Water Management Plan (Refuge Plan), which Reclamation has evaluated and preliminarily determined to meet the requirements of these Refuge Criteria (see list in Supplementary Information below). Willow Creek Mutual Water Company Refuge Plan was developed in accordance with the Refuge Criteria applicable to the conservation easements that have been acquired by the United States Fish and Wildlife Service. Reclamation is publishing this notice in order to allow the public to review the plans and comment on the preliminary determinations. Public comment on Reclamation's preliminary (i.e., draft) determination is invited at this time.
Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico
Document Number: 2011-24335
Type: Notice
Date: 2011-09-22
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Current Federal policy encourages non-Federal development of environmentally sustainable hydropower potential on Federal water resource projects. The Bureau of Reclamation (Reclamation), in consultation with the Department of Energy, Western Area Power Administration (Western), will consider proposals for non-Federal development of hydroelectric power at Caballo Dam, a feature of the Rio Grande Project. Reclamation is considering such hydroelectric power development under a lease of power privilege. No Federal funds will be available for such hydroelectric power development. Western would have the first opportunity to purchase and/or market the power that would be generated by such development under a lease of power privilege. The Rio Grande Project is a Federal Reclamation project. This notice presents background information, proposal content guidelines, and information concerning selection of a non-Federal entity to develop hydroelectric power at Caballo Dam.
Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings for the Joint Operations Center Relocation Project, Sacramento County, CA
Document Number: 2011-22787
Type: Notice
Date: 2011-09-08
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation) and the California Department of Water Resources (DWR) have made available for public review and comment the joint draft environmental impact statement/ environmental impact report (Draft EIS/EIR) for the Joint Operations Center (JOC) Relocation Project. The proposed new JOC would provide the special needs, essential services, and requisite office space for the combined occupancy of Reclamation, DWR, and the National Weather Service (NWS) that are lacking at the existing Interim JOC on El Camino. Special needs are defined as two control centers, a flood operations center, backup power supplies, primary and backup communication systems, intense computer infrastructure, and physical and cyber security systems. The new JOC also must meet State essential service criteria, described further below.
Buy American Exception Under the American Recovery and Reinvestment Act of 2009
Document Number: 2011-22385
Type: Notice
Date: 2011-09-01
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
This notice provides information regarding the Bureau of Reclamation (Reclamation) approval of the Buy American waiver requested by the Sunnyside Division Board of Control (SDBOC) to purchase foreign- produced ductile iron flanges also known as bolt rings used to connect high-density polyethylene (HDPE) and polyvinyl chloride (PVC) pipe as part of the American Recovery and Reinvestment Act of 2009 (ARRA) grant for the Enclosed Lateral Improvement Project (ELIPS) located in Sunnyside, Washington.
Charter Renewal, Glen Canyon Dam Adaptive Management Work Group
Document Number: 2011-22382
Type: Notice
Date: 2011-09-01
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Following consultation with the General Services Administration, notice is hereby given that the Secretary of the Interior (Secretary) is renewing the charter for the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide recommendations to the Secretary with respect to the operation of Glen Canyon Dam and the exercise of other authorities pursuant to applicable Federal law.
Central Valley Project Improvement Act, Water Management Plans
Document Number: 2011-22259
Type: Notice
Date: 2011-08-31
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The following Water Management Plans are available for review: Del Puerto Water District. Chowchilla Water District. Orange Cove Irrigation District. James Irrigation District. Tranquility Irrigation District. Kaweah Delta Water Conservation District. To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau of Reclamation developed and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above entities have each developed a Plan, which Reclamation has evaluated and preliminarily determined to meet the requirements of these Criteria. Reclamation is publishing this notice in order to allow the public to review the plans and comment on the preliminary determinations. Public comment on Reclamation's preliminary (i.e., draft) determination is invited at this time.
Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Nimbus Hatchery Fish Passage Project, Lower American River, California
Document Number: 2011-20393
Type: Notice
Date: 2011-08-11
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation), the lead Federal agency, and the California Department of Fish and Game (CDFG), the lead State agency, have prepared a joint Final EIS/EIR for the proposed Nimbus Fish Hatchery Weir Replacement Project (Project). The purpose of the Project is to create and maintain a reliable system of collecting adult fish for use in the Nimbus Fish Hatchery (Hatchery).
Rural Water Supply Program Approved Appraisal Reports; Availability
Document Number: 2011-20392
Type: Notice
Date: 2011-08-11
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Reclamation provides assistance for appraisal investigations and feasibility studies for rural water supply projects intended to serve a community or group of communities with domestic, industrial, and municipal water. This assistance helps rural communities assess their potable water needs and identify options to address those needs. Three appraisal reports were approved in Fiscal Year 2010 and two were approved in Fiscal Year 2011. The initial appraisal investigations were submitted by the participants for review to assess technical adequacy and completeness. Once reviewed, Reclamation prepared these reports to document the findings and conclusions of the appraisal investigations that identified the water supply problems, needs, and opportunities in the planning study areas. The approval of an appraisal report indicates that there is a viable alternative that warrants a more detailed investigation through a feasibility study.
Notice of Public Meeting for the Glen Canyon Dam Adaptive Management Work Group Federal Advisory Committee
Document Number: 2011-19759
Type: Notice
Date: 2011-08-04
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam, consistent with the Grand Canyon Protection Act. The AMWG meets two to three times a year.
Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the Fryingpan-Arkansas Project (Fry-Ark Project), Colorado
Document Number: 2011-19617
Type: Notice
Date: 2011-08-03
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation is extending the time period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the Fry-Ark Project, Colorado. This notice was originally published in the Federal Register on April 20, 2011 (76 FR 22143). The due date was originally to end on August 19, 2011.
Agency Information Collection Activities Under OMB Review; Renewal of a Currently Approved Collection (OMB Control Number 1006-0028)
Document Number: 2011-19514
Type: Notice
Date: 2011-08-02
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Recreation Visitor Use Surveys. The ICR describes the nature of the information collection and its expected cost burden.
Notice of Availability of the Final Environmental Impact Statement for the Madera Irrigation District Water Supply Enhancement Project located in Madera County, California
Document Number: 2011-14210
Type: Notice
Date: 2011-06-08
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation) has prepared a Final Environmental Impact Statement (EIS) for the Madera Irrigation District Water Supply Enhancement Project (MID WSEP). Reclamation proposes to approve the banking of up to 55,000 acre-feet per year of Central Valley Project (CVP) water outside the MID service area and the alteration of Reclamation-owned facilities. The total banking capacity of the MID WSEP is 250,000 acre-feet. Portions of the 24.2 Canal, Section 8 Canal, Main Number 1 Canal, Cottonwood Creek, and Gravelly Ford Canal would be enlarged, extended, or improved. The MID WSEP would be completed in two phases. Phase 1 would involve recharge-related facilities only. Phase 2 would involve supplemental recharge facilities and facilities for recovery of banked water. The Final EIS addresses both phases.
Request for Interest in Lease Arrangement on Federal Lands, San Luis Project, Los Banos, California
Document Number: 2011-14209
Type: Notice
Date: 2011-06-08
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation), a water management agency within the Department of the Interior (Interior), announces the availability of a Request for Interest (RFI). Reclamation is seeking interest from any entity or entities interested in developing a renewable energy project(s) in a lease arrangement on existing Reclamation lands in the vicinity of the San Luis Project near Los Banos, California.
Glen Canyon Dam Adaptive Management Program Work Group (AMWG)
Document Number: 2010-33338
Type: Notice
Date: 2011-01-05
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a Federal advisory committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report
Document Number: 2010-32660
Type: Notice
Date: 2010-12-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation is reopening the review period for the HRA for another 30 days from the date of publication of this Notice. The notice of availability of the HRA was published in the Federal Register on November 4, 2010 (75 FR 67993). The public review period was originally to end on December 6, 2010.
Long-Term North to South Water Transfer Program, Sacramento County, CA
Document Number: 2010-32583
Type: Notice
Date: 2010-12-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Department of the Interior, Bureau of Reclamation (Reclamation) and the San Luis & Delta-Mendota Water Authority propose to prepare a joint EIS/EIR to analyze the effects of water transfers from water agencies in northern California to water agencies south of the Sacramento-San Joaquin Delta (Delta) and in the San Francisco Bay Area. The EIS/EIR will address transfers of Central Valley Project (CVP) and non-CVP water supplies that require use of CVP or State Water Project (SWP) facilities to convey the transferred water. Water transfers would occur through various methods, including, but not limited to, groundwater substitution and cropland idling, and would include individual and multiyear transfers from 2012 through 2022.
Odessa Subarea Special Study; Adams, Franklin, Grant, and Lincoln Counties, WA
Document Number: 2010-32525
Type: Notice
Date: 2010-12-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation is extending the comment period for the Odessa Subarea Special Study DEIS to January 31, 2011. The original notice of availability for the DEIS was published in the Federal Register on October 25, 2010. The public review period was originally scheduled to end on December 31, 2010 (75 FR 65503).
South Coast Conduit/Upper Reach Reliability Project, Santa Barbara County, CA
Document Number: 2010-31039
Type: Notice
Date: 2010-12-10
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the Federal lead agency, and the Cachuma Operation and Maintenance Board (COMB), the State lead agency, have prepared a Final EIS/EIR for the South Coast Conduit/Upper Reach Reliability Project (SCC/URRP). The SCC/URRP involves installation of a second water pipeline for improving water supply reliability to Cachuma Project (CP) and State Water Project (SWP) customers on the South Coast of Santa Barbara County. A Notice of Availability of the joint Draft EIS/EIR was published in the Federal Register on Wednesday, August 20, 2008 (73 FR 49218). The written comment period on the Draft EIS/EIR ended October 3, 2008. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.
San Joaquin River Restoration Program: Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project, Merced County, CA
Document Number: 2010-29330
Type: Notice
Date: 2010-11-22
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation and the California Department of Water Resources are revising our proposal to prepare a joint EIS/EIR on the effects of the proposed Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project under the San Joaquin River Restoration Program. The original notice of intent was published in the Federal Register on September 9, 2009 (74 FR 46453). This revised proposal would include measures for the conveyance of Interim and Restoration flows and incorporation of fish habitat through Reach 4B and/or the bypasses. When evaluating comments on this proposal, we will also consider comments that we received on the previous proposal.
Central Valley Project Improvement Act, Water Management Plans
Document Number: 2010-28784
Type: Notice
Date: 2010-11-16
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The following Water Management Plans are available for review: Orland-Artois Water District Kern Tulare Water District To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau of Reclamation developed and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above entities have developed a Plan, which Reclamation has evaluated and preliminarily determined to meet the requirements of these Criteria. Reclamation is publishing this notice in order to allow the public to review the plans and comment on the preliminary determinations. Public comment on Reclamation's preliminary (i.e., draft) determination is invited at this time.
Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans
Document Number: 2010-28603
Type: Notice
Date: 2010-11-15
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The ``Criteria for Developing Refuge Water Management Plans'' (Refuge Criteria) are now available for public comment. The Refuge Criteria provide a common methodology, or standard, for efficient use of water by Federal Wildlife Refuges, State Wildlife Management Areas and Resource Conservation Districts that receive water under provisions of the Central Valley Project Improvement Act (CVPIA). They document the process and format by which Refuge Water Management Plans (Plans) should be prepared and submitted to Reclamation as part of the Refuge/ District Water Supply Contracts and Memoranda of Agreement. The Refuge Criteria refer to Refuges, Wildlife Areas, and Resource Conservation Districts as Refuges. Those Refuges that entered into water supply contracts with Reclamation as a result of the CVPIA and subsequent Department of the Interior administrative review processes are required to prepare Plans using the Refuge Criteria.
Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report
Document Number: 2010-27908
Type: Notice
Date: 2010-11-04
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation has made available for public review and comment the ``Hydropower Resource Assessment at Existing Reclamation Facilities'' (HRA) Draft Report. The HRA is an assessment of the economic and technical potential for hydropower development at existing Bureau of Reclamation (Reclamation) owned non-powered dams and structures.
Colorado River Basin Salinity Control Advisory Council
Document Number: 2010-27217
Type: Notice
Date: 2010-10-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below. The meeting of the Council is open to the public.
Odessa Subarea Special Study; Adams, Franklin, Grant, and Lincoln Counties, Washington INT-DES 10-54
Document Number: 2010-26865
Type: Notice
Date: 2010-10-25
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA), the Bureau of Reclamation (Reclamation) is notifying the public that Reclamation and the State of Washington have prepared a Draft EIS for the Odessa Subarea Special Study. The Washington Department of Ecology (Ecology) is a joint lead with Reclamation in the preparation of this Draft EIS, which will also be used to comply with requirements of the Washington State Environmental Policy Act (SEPA). The purpose of Reclamation's Odessa Subarea Special Study is to evaluate alternatives to replace groundwater supply with surface water to irrigate existing, groundwater-irrigated acres in the Odessa Ground Water Management Subarea. Measurements of groundwater levels in wells have shown a substantial decline in much of the Odessa Subarea since the 1980s, which are the earliest available measurements. This has prompted public concern about the declining aquifers and associated economic and other effects, which resulted in a directive by the U.S. Congress and the Washington State legislature to investigate the problem.
Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection; Comment Request
Document Number: 2010-24264
Type: Notice
Date: 2010-09-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), the Bureau of Reclamation (we, our, or us) intends to submit a request for renewal (with revisions) of an existing approved information collection to the Office of Management and Budget (OMB): Certification Summary Form, Reporting Summary Form for Acreage Limitation, 43 CFR part 426 and 43 CFR part 428, OMB Control Number: 1006-0006. We request your comments on the revised RRA forms and specific aspects of the information collection.
Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection; Comment Request
Document Number: 2010-24263
Type: Notice
Date: 2010-09-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), the Bureau of Reclamation (we, our, or us) intends to submit a request for renewal (with revisions) of an existing approved information collection to the Office of Management and Budget (OMB): Individual Landholder's and Farm Operator's Certification and Reporting Forms for Acreage Limitation, 43 CFR part 426 and 43 CFR part 428, OMB Control Number: 1006-0005. We request your comments on the revised RRA forms and specific aspects of the information collection.
Agency Information Collection Activities; Proposed Revisions to a Currently Approved Information Collection; Comment Request
Document Number: 2010-24262
Type: Notice
Date: 2010-09-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), the Bureau of Reclamation (we, our, or us) intends to submit a request for renewal (with revisions) of an existing approved information collection to the Office of Management and Budget (OMB): Forms to Determine Compliance by Certain Landholders, 43 CFR part 426, OMB Control Number: 1006-0023. We request your comments on the proposed Reclamation Reform Act of 1982 (RRA) forms and specific aspects of the information collection.
San Carlos Irrigation Project, Arizona
Document Number: 2010-21642
Type: Notice
Date: 2010-08-31
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Department of the Interior, Bureau of Reclamation, announces its intent to prepare an EIS pursuant to the National Environmental Policy Act of 1969, as amended, on the rehabilitation of San Carlos Irrigation Project (SCIP) water delivery facilities near the communities of Casa Grande, Coolidge, and Florence in Pinal County, Arizona. SCIP canals convey irrigation water from the Gila River and Central Arizona Project (CAP) to agricultural lands in the San Carlos Irrigation and Drainage District (SCIDD) and Gila River Indian Community.
Upper Truckee River Restoration and Golf Course Reconfiguration Project, El Dorado County, CA
Document Number: 2010-21141
Type: Notice
Date: 2010-08-25
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act (NEPA), the California Environmental Quality Act (CEQA), and Article VII of the Tahoe Regional Planning Compact and Chapter 5 of the Tahoe Regional Planning Agency (TRPA) Code of Ordinances, the Bureau of Reclamation (Reclamation), California Department of Parks and Recreation (State Parks), and TRPA have made available for public review and comment the draft EIR/EIS for the Upper Truckee River Restoration and Golf Course Reconfiguration Project (Project). Depending on which alternative is selected, the proposed restoration project may include continuing existing golf course use, removal of the entire Lake Tahoe Golf Course, or reconfiguration of the golf course to allow for restoration of the river, to reduce the area of Stream Environment Zone occupied by the golf course, and to allow for establishment of a buffer area between the golf course and the river.
Minidoka Dam Spillway Replacement, Minidoka County, ID
Document Number: 2010-20284
Type: Notice
Date: 2010-08-17
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, the Bureau of Reclamation (Reclamation) is notifying the public that it has prepared a FEIS on the proposed Minidoka Dam Spillway Replacement. The U.S. Fish and Wildlife Service (Department of Interior) and Rural Development (Department of Agriculture) are cooperating agencies under NEPA. Alternatives considered in the FEIS are the No Action, as required under NEPA; total replacement of the spillway and headgate structures; and replacement of just the spillway. Total replacement of the spillway and headgate structures is the preferred alternative. Proposed changes in operations following construction are also evaluated, as is designation of special use areas. Reclamation published a Draft EIS in the Federal Register on December 11, 2009 (74 FR 65783) with a public comment period ending on February 5, 2010. The Final EIS includes written responses to all public comments on the Draft EIS. Revisions were made in the FEIS to incorporate responses to comments. In response to comments an adaptive management approach, which includes monitoring of effects resulting from changes in operations, has been added and proposed changes to operations will be made over a 4-year period. These revisions do not significantly change the analysis or results presented in the Draft EIS. However, if monitoring under the adaptive management approach shows different impacts than are documented in this FEIS, and changes to proposed operations (as discussed in this FEIS) are made as a result of monitoring, additional NEPA compliance will be conducted to document those changes and/or impacts.
Northwest Area Water Supply Project, North Dakota
Document Number: 2010-19922
Type: Notice
Date: 2010-08-13
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation) is commencing work under the National Environmental Policy Act of 1969 (NEPA) on a Supplemental Environmental Impact Statement (EIS) for the Northwest Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A Final EIS and Record of Decision (ROD) for the NAWS Project were previously completed in December 2008 and January 2009, respectively. The Final EIS and ROD were challenged in U.S. District Court. A subsequent court order found the Final EIS to be insufficient in two areas. Therefore a supplement is being prepared
Arkansas Valley Conduit (AVC) and Long-Term Excess Capacity Master Contract, Fryingpan-Arkansas Project (Fry-Ark Project) Colorado
Document Number: 2010-18779
Type: Notice
Date: 2010-07-30
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA, the Bureau of Reclamation (Reclamation) proposes to prepare a draft EIS that analyzes effects associated with construction of the AVC, a proposed feature of the Fryingpan-Arkansas (Fry-Ark) Project, and the issuance of an Excess Capacity Master Contract to Southeastern Colorado Water Conservancy District (Southeastern). The proposed Federal action is to construct the pipeline to provide treated water to the service area in southeastern Colorado. Towns in the service area need to construct new or improved water treatment systems, supplement their current water supply, and/or purchase other water supplies to replace poor quality water. Some also need more water to meet demands of a growing population. The proposed Federal action associated with the Excess Capacity Master Contract is to issue a long-term contract to Southeastern for storage of non-Fry-Ark Project water in Pueblo Reservoir, a feature of the Fry-Ark Project. The water would be used by several water providers within Southeastern's boundaries.
Glen Canyon Dam Adaptive Management Work Group (AMWG)
Document Number: 2010-18643
Type: Notice
Date: 2010-07-29
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a Federal advisory committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Status Report of Water Service, Repayment, and Other Water-Related Contract Actions
Document Number: 2010-17933
Type: Notice
Date: 2010-07-22
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation (Reclamation) and were pending through December 31, 2009, and contract actions that have been completed or discontinued since the last publication of this notice on November 6, 2009. From the date of this publication, future notices during this calendar year will be limited to new, modified, discontinued, or completed contract actions. This annual notice should be used as a point of reference to identify changes in future notices. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
Walker River Basin Acquisition Program
Document Number: 2010-16300
Type: Notice
Date: 2010-07-06
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation (Reclamation) is canceling work on the Environmental Impact Statement (EIS) for the Walker River Basin Acquisition Program (Acquisition Program). Reclamation has determined that the action of providing funds for the Acquisition Program as authorized in Public Laws 109-103 and 111-85 is not a Federal discretionary action. In addition, Reclamation does not have control over the expenditure of the funds by the Acquisition Program recipient and has therefore determined National Environmental Policy Act (NEPA) compliance is not necessary per 2008 Department of Interior regulations for implementing NEPA (43 Code of Federal Regulations [CFR] Part 46 Implementation of the NEPA of 1969). Reclamation included its decision that NEPA compliance is not required in the July 2009 Draft EIS and shared the decision at the August 2009 public hearings. In February 2010, Reclamation issued a Revised Draft EIS with incorporation of public comment for informational purposes only rather than a NEPA analysis. Additional comments were not solicited on this February 2010 Revised Draft EIS, and a Final EIS and Record of Decision (ROD) will not be prepared.
Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To Remove Four Dams on the Klamath River in California and Oregon
Document Number: 2010-16134
Type: Notice
Date: 2010-07-02
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Department of the Interior (Department) through the Bureau of Reclamation published a notice of intent and notice of public scoping meetings for an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) in the Federal Register on June 14, 2010. The notice contained an incorrect date for when the Department will accept scoping comments for this EIS/EIR.
Central Valley Project Improvement Act, Water Management Plans
Document Number: 2010-16126
Type: Notice
Date: 2010-07-02
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The following Water Management Plans are available for review:
Glen Canyon Dam Adaptive Management Work Group
Document Number: 2010-14627
Type: Notice
Date: 2010-06-17
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
This notice is published in accordance with Section 9(a)(2) of the Federal Advisory Committee Act of 1972 (Pub. L. 92-463, as amended). Following consultation with the General Services Administration, notice is hereby given that the Secretary of the Interior (Secretary) is renewing the charter for the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide recommendations to the Secretary with respect to the operation of Glen Canyon Dam and the exercise of other authorities pursuant to applicable Federal law.
Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether to Remove Four Dams on the Klamath River in California and Oregon
Document Number: 2010-14174
Type: Notice
Date: 2010-06-14
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended, and the California Environmental Quality Act (CEQA), the Department of the Interior (Department), through the Bureau of Reclamation (Reclamation), and the California Department of Fish and Game (CDFG) intend to prepare an EIS/EIR. The Department and CDFG will conduct public scoping meetings to solicit comments concerning the issues, alternatives, and analyses to be considered in the evaluation of whether to remove four dams on the Klamath River pursuant to the terms of the Klamath Hydroelectric Settlement Agreement (KHSA). Section 3.3.1 of the KHSA states: ``Based upon the record, environmental compliance and other actions described in Section 3.2, and in cooperation with the Secretary of Commerce and other Federal agencies as appropriate, the Secretary shall determine whether, in his judgment, the conditions of Section 3.3.4 have been satisfied, and whether, in his judgment, Facilities Removal (i) will advance restoration of the salmonid fisheries of the Klamath Basin, and (ii) is in the public interest, which includes but is not limited to consideration of potential impacts on affected local communities and Tribes.''
North San Pablo Bay Restoration and Reuse Project
Document Number: 2010-13512
Type: Notice
Date: 2010-06-07
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the Federal lead agency, and Sonoma County Water Agency (SCWA), acting as project administrator of the North Bay Water Reuse Authority (NBWRA) and the State lead agency, have prepared a Final EIR/EIS for the implementation of the North San Pablo Bay Restoration and Reuse Project (Project), also referred to as the North Bay Water Recycling Program.
Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado
Document Number: 2010-13149
Type: Notice
Date: 2010-06-02
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Current Federal policy encourages non-Federal development of environmentally sustainable hydropower potential on Federal water resource projects. The Bureau of Reclamation (Reclamation), in consultation with the Department of Energy, Western Area Power Administration (Western), will consider proposals for non-Federal development of hydroelectric power at Ridgway Dam, a feature of the Dallas Creek Project. Reclamation is considering such hydroelectric power development under a lease of power privilege. No Federal funds will be available for such hydroelectric power development. Western would have the first opportunity to purchase and/or market the power that would be generated by such development under a lease of power privilege. The Dallas Creek Project is a Federal Reclamation project. This notice presents background information, proposal content guidelines, and information concerning selection of a non-Federal entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing considerations.
Cachuma Lake Resource Management Plan, Santa Barbara County, CA
Document Number: 2010-11994
Type: Notice
Date: 2010-05-19
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act, the Bureau of Reclamation (Reclamation) has made available the Final EIS for the Cachuma Lake Resource Management Plan (RMP). The RMP involves alternatives for future use of the project area for recreation and resource protection and management.
Colorado River Basin Salinity Control Advisory Council
Document Number: 2010-11100
Type: Notice
Date: 2010-05-14
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below. The meeting of the Council is open to the public.
Colorado River Basin Salinity Control Advisory Council
Document Number: 2010-11065
Type: Notice
Date: 2010-05-10
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below. The meeting of the Council is open to the public.
Mormon Island Auxiliary Dam (MIAD) Modification Project, Sacramento and El Dorado Counties, CA
Document Number: 2010-10716
Type: Notice
Date: 2010-05-06
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
Pursuant to the National Environmental Policy Act and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the lead Federal agency and the Sacramento Area Flood Control Agency (SAFCA), the CEQA lead agency, have prepared a Final Supplemental EIS/EIR for the MIAD Modification Project. The Final Supplemental EIS/EIR contains responses to comments received on the Draft Supplemental EIS/EIR.
Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate
Document Number: 2010-9805
Type: Notice
Date: 2010-04-28
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation is reopening the comment period for the Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate Adjustment for an additional 30 days from the date of publication of this Notice. The initial Notice proposing this adjustment was published in the Federal Register on January 11, 2010 (75 FR 1408). The public comment period ended on February 10, 2010.