Nuclear Regulatory Commission 2009 – Federal Register Recent Federal Regulation Documents

Sunshine Federal Register Notice
Document Number: E9-30974
Type: Notice
Date: 2009-12-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
NUREG-1934, Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Draft Report for Comment
Document Number: E9-30823
Type: Notice
Date: 2009-12-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission has issued for public comment a document entitled: ``NUREG-1934 (EPRI 1019195), Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Draft Report for Comment.''
Domestic Licensing of Production and Utilization Facilities
Document Number: E9-30739
Type: Rule
Date: 2009-12-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Southern California Edison: San Onofre Nuclear Generating Station, Unit 2 and Unit 3 Temporary Exemption
Document Number: E9-30674
Type: Notice
Date: 2009-12-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Advisory Committee on the Medical Uses of Isotopes: Call for Nominations
Document Number: E9-30497
Type: Notice
Date: 2009-12-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is advertising for nominations for the diagnostic radiologist position on the Advisory Committee on the Medical Uses of Isotopes (ACMUI). Nominees should currently be practicing diagnostic radiology in a clinical setting.
License Renewal Interim Staff Guidance LR-ISG-2007-02: Changes to Generic Aging Lessons Learned Report Aging Management Program XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements”; Notice of Availability
Document Number: E9-30483
Type: Notice
Date: 2009-12-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is issuing the final License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2007-02, ``Changes to Generic Aging Lessons Learned (GALL) Report Aging Management Program (AMP) XI.E6, ``Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.'' LR-ISG-2007-02 revises current NRC guidance in Section XI.E6 of NUREG-1801, Revision 1, ``Generic Aging Lessons Learned (GALL) Report,'' Volume 2, dated September 2005 (GALL Report). Volume 2 of the GALL Report is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML052780376. The revised GALL Report Section XI.E6 recommends an AMP with a one-time inspection for electrical cable connections not subject to 10 CFR 50.49 environmental qualification requirements, instead of the periodic inspection as currently recommended in the GALL Report. The NRC staff has determined that a one-time inspection, on a representative sample basis, is adequate to ensure that either aging of metallic cable connections is not occurring and/or that an existing preventive maintenance program is effective such that a periodic inspection is not required. The final LR-ISG-2007- 02 is available under Accession No. ML091940093.
South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, Unit 1; Exemption
Document Number: E9-30482
Type: Notice
Date: 2009-12-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Florida Power and Light Company; Receipt of Request for Action Under 10 CFR 2.206; Correction Notice
Document Number: E9-30383
Type: Notice
Date: 2009-12-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Office of New Reactors; Notice of Availability Standard Review Plan Section 9.5.1.2 on Risk-Informed, Performance-Based Fire Protection Program
Document Number: E9-30382
Type: Notice
Date: 2009-12-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is issuing its Final Guidance on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 9.5.1.2 on staff guidance on Risk- Informed (RI), Performance-Based (PB) Fire Protection Program (FPP) for Operating Nuclear Power Plants (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092590527). This guidance is being issued as an alternate to the existing guidance currently provided under Standard Review Plan (SRP) Section 9.5.1.1. This is stand alone guidance and is provided for the benefit of licensees of existing plants who choose to adopt RI/PB FPP that meets the requirements of National Fire Protection Association (NFPA) Standard 805.
Sunshine Federal Register Notice
Document Number: E9-30381
Type: Notice
Date: 2009-12-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Final Regulatory Guide: Issuance, Availability
Document Number: E9-30103
Type: Notice
Date: 2009-12-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Federal Register Notice
Document Number: E9-30012
Type: Notice
Date: 2009-12-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Draft Technical Basis for Rulemaking Revising Security Requirements for Facilities Storing SNF and HLW; Notice of Availability and Solicitation of Public Comments
Document Number: E9-29872
Type: Proposed Rule
Date: 2009-12-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (Commission or NRC) is seeking input from the public, licensees, certificate holders, and other stakeholders on a draft technical basis for a proposed rulemaking that would revise the NRC's security requirements for the storage of spent nuclear fuel (SNF) at an Independent Spent Fuel Storage Installation (ISFSI) and the storage of SNF and/or high-level radioactive waste (HLW) at a Monitored Retrievable Storage Installation (MRS). This contemplated rulemaking would also make conforming changes to the ISFSI and MRS licensing requirements for security plans and programs. The NRC has developed a draft technical basis for this proposed rulemaking that describes the agency's overall objectives, conceptual approaches, potential solutions, integration with agency strategic goals, and related technical and regulatory clarity issues. The NRC is soliciting comments on this draft technical basis document from the public, licensees, and other stakeholders to confirm that an adequate technical basis exists to proceed with rulemaking to issue new risk-informed and performance-based security regulations for SNF and HLW storage facilities.
Sunshine Act; Meeting Notice
Document Number: E9-29871
Type: Notice
Date: 2009-12-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Development of NRC's Safety Culture Policy: Public Workshops; Request for Nomination of Participants in Round Table Discussions and Stakeholder Participation
Document Number: E9-29793
Type: Notice
Date: 2009-12-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has prepared a draft policy statement on safety culture to include the unique aspects of nuclear safety and security, and to note expectations that the policy applies to individuals and organizations performing or overseeing NRC-regulated activities. The NRC is conducting public workshops to solicit input relating to the development of the safety culture policy statement. These workshops will be composed of panel discussions. Attendees' participation and feedback on the discussions will also be solicited during the workshops. In addition to announcing the public workshops, the other purpose of this notice is to request the names of individuals desiring to participate in the panel discussion portion of the workshops. Nominations and requests to participate in the panel discussions are requested by January 15, 2010, to allow for their consideration.
In the Matter of: Duane Kuhn; Confirmatory Order Modifying License (Effective Immediately)
Document Number: E9-29661
Type: Notice
Date: 2009-12-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of Renewal of Special Nuclear Material License No. SNM-180 [University of Texas at Austin]
Document Number: E9-29656
Type: Notice
Date: 2009-12-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Draft Regulatory Guide: Issuance, Availability
Document Number: E9-29655
Type: Notice
Date: 2009-12-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
NUREG-1921, EPRI/NRC-RES Fire Human Reliability Analysis Guidelines, Draft Report for Comment
Document Number: E9-29555
Type: Notice
Date: 2009-12-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission has issued for public comment a document entitled: ``NUREG-1921 (EPRI 1019196), EPRI/NRC-RES Fire Human Reliability Analysis Guidelines, Draft Report for Comment.''
List of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision 7, Confirmation of Effective Date
Document Number: E9-29554
Type: Rule
Date: 2009-12-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is confirming the effective date of December 28, 2009, for the direct final rule that was published in the Federal Register on October 13, 2009. The direct final rule amended the NRC's spent fuel storage regulations in 10 CFR 72.214 to revise the HI-STORM 100 dry cask storage system listing to include Amendment No. 7 to Certificate of Compliance (CoC) Number 1014.
Notice of Availability of Draft Supplemental Environmental Impact Statement for the Moore Ranch ISR Project in Campbell County, WY, Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities
Document Number: E9-29553
Type: Notice
Date: 2009-12-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a Draft Supplemental Environmental Impact Statement (SEIS) for the Moore Ranch ISR Project in Campbell County, Wyoming, Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities. By letter dated October 2, 2007, Energy Metals Corporation, a wholly-owned subsidiary of Uranium One (Uranium One), submitted an application to the NRC for a new source material license for the proposed Moore Ranch ISR Project, located in the Power River Basin in Campbell County, Wyoming. Uranium One is proposing to recover uranium from the Moore Ranch site using the in-situ leach (also know as the in-situ recovery [ISR]) process.
Notice of Availability of Draft Environmental Impact Statement for the Nichols Ranch In-Situ Recovery (ISR) Project in Campbell and Johnson Counties, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities
Document Number: E9-29550
Type: Notice
Date: 2009-12-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a Draft Supplemental Environmental Impact Statement for the Nichols Ranch In-Situ Recovery (ISR) Project. By letter dated November 30, 2007, Uranerz Energy Corporation (Uranerz), submitted an application to the NRC for a new source material license for the Nichols Ranch ISR Project, which Uranerz proposes to be located in the Powder River Basin in Campbell and Johnson Counties, Wyoming. Uranerz is proposing to recover uranium from the Nichols Ranch ISR Project site using the in-situ leach (also know as the in-situ recovery (ISR)) process.
Notice of Availability of Draft Environmental Impact Statement for the Lost Creek In-Situ Recovery (ISR) Project in Sweetwater County, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities
Document Number: E9-29547
Type: Notice
Date: 2009-12-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Supplemental Environmental Impact Statement (SEIS) for the Lost Creek In-Situ Uranium Recovery (ISR) Project. By letter dated March 20, 2008, Lost Creek ISR, LLC (LCI), a wholly-owned subsidiary of UR-Energy USA, Inc. submitted an application to the NRC for a new source material license for the Lost Creek ISR Project, which LCI proposes to be located in the Great Divide Basin in Sweetwater County, Wyoming. LCI is proposing to recover uranium from the Lost Creek ISR Project site using the in-situ leach (also known as the in-situ recovery ISR) process.
Proposed Generic Communication; NRC Regulatory Issue Summary 2009-XX; Monitoring the Status of Regulated Activities During a Pandemic
Document Number: E9-29326
Type: Notice
Date: 2009-12-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to issue
In the Matter of Daniel Culver; Order Prohibiting Involvement in NRC-Licensed Activities
Document Number: E9-29325
Type: Notice
Date: 2009-12-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act; Meeting Notice
Document Number: E9-29311
Type: Notice
Date: 2009-12-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Cedric Fernando, M.D.; Confirmatory Order (Effective Immediately)
Document Number: E9-29201
Type: Notice
Date: 2009-12-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
In the Matter of Cedric Fernando, M.D.; Confirmatory Order (Effective Immediately)
Document Number: E9-29200
Type: Notice
Date: 2009-12-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.