Shenango Dam Hydroelectric Company, LLC; Notice of Surrender of Preliminary Permit, 31768 [2017-14336]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
31768
Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices
Filed Date: 6/30/17.
Accession Number: 20170630–5207.
Comments Due: 5 p.m. ET 7/21/17.
Docket Numbers: ER17–1983–000.
Applicants: EverPower Commercial
Services LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Updates to be
effective 8/28/2017.
Filed Date: 6/30/17.
Accession Number: 20170630–5209.
Comments Due: 5 p.m. ET 7/21/17.
Docket Numbers: ER17–1984–000.
Applicants: Highland North LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Updates to be
effective 8/28/2017.
Filed Date: 6/30/17.
Accession Number: 20170630–5210.
Comments Due: 5 p.m. ET 7/21/17.
Docket Numbers: ER17–1985–000.
Applicants: Howard Wind LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Updates to be
effective 8/28/2017.
Filed Date: 6/30/17.
Accession Number: 20170630–5211.
Comments Due: 5 p.m. ET 7/21/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–35–000.
Applicants: Northern Indiana Public
Service Company.
Description: Supplement to June 9,
2017 Application for Authorization to
Issue Short-Term Debt of Northern
Indiana Public Service Company.
Filed Date: 6/29/17.
Accession Number: 20170629–5252.
Comments Due: 5 p.m. ET 7/6/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 30, 2017.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14698–001]
Shenango Dam Hydroelectric
Company, LLC; Notice of Surrender of
Preliminary Permit
Take notice that Shenango Dam
Hydroelectric Company, LLC, permittee
for the proposed Shenango
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on December 2,
2015, and would have expired on
November 30, 2018.1 The project would
have been located at the U.S. Army
Corps of Engineers’ Shenango dam on
the Shenango River, near the Borough of
Sharpsburg, Mercer County,
Pennsylvania.
The preliminary permit for Project
No. 14698 will remain in effect until the
close of business, July 30, 2017. But, if
the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: June 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–14336 Filed 7–7–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13102–003]
Birch Power Company; Notice of
Availability of Draft Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 Code of Federal
Regulations Part 380, Office of Energy
Projects staff has reviewed the
application for original license for the
Demopolis Lock and Dam Hydroelectric
Project (FERC No. 13102–003) on the
Tombigbee River.
The Demopolis Lock and Dam
Hydroelectric Project would be located
at an existing lock and dam owned by
the U.S. Army Corps of Engineers on the
Tombigbee River, west of the city of
[FR Doc. 2017–14330 Filed 7–7–17; 8:45 am]
2 18
Dated: June 29, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–14335 Filed 7–7–17; 8:45 am]
BILLING CODE 6717–01–P
1 153
BILLING CODE 6717–01–P
Demopolis in Marengo and Sumter
Counties, Alabama. The project would
occupy 23 acres of federal land.
Staff has prepared this draft
environmental assessment (draft EA)
that analyzes the potential
environmental effects of the project and
concludes that constructing and
operating the project, with appropriate
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659. In lieu of electronic
filing, please send a paper copy to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. The first page of
any filing should include: ‘‘Demopolis
Lock and Dam Hydroelectric Project No.
13102–003.’’
For further information, contact Adam
Peer at (202) 502–8449 or by email at
adam.peer@ferc.gov.
VerDate Sep<11>2014
16:08 Jul 07, 2017
Jkt 241001
PO 00000
FERC ¶ 62,155 (2015).
CFR 385.2007(a)(2) (2016).
Frm 00019
Fmt 4703
Sfmt 9990
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 82, Number 130 (Monday, July 10, 2017)]
[Notices]
[Page 31768]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14336]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14698-001]
Shenango Dam Hydroelectric Company, LLC; Notice of Surrender of
Preliminary Permit
Take notice that Shenango Dam Hydroelectric Company, LLC, permittee
for the proposed Shenango Hydroelectric Project, has requested that its
preliminary permit be terminated. The permit was issued on December 2,
2015, and would have expired on November 30, 2018.\1\ The project would
have been located at the U.S. Army Corps of Engineers' Shenango dam on
the Shenango River, near the Borough of Sharpsburg, Mercer County,
Pennsylvania.
---------------------------------------------------------------------------
\1\ 153 FERC ] 62,155 (2015).
---------------------------------------------------------------------------
The preliminary permit for Project No. 14698 will remain in effect
until the close of business, July 30, 2017. But, if the Commission is
closed on this day, then the permit remains in effect until the close
of business on the next day in which the Commission is open.\2\ New
applications for this site may not be submitted until after the permit
surrender is effective.
---------------------------------------------------------------------------
\2\ 18 CFR 385.2007(a)(2) (2016).
Dated: June 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-14336 Filed 7-7-17; 8:45 am]
BILLING CODE 6717-01-P