Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 28309 [2017-12927]

Download as PDF Federal Register / Vol. 82, No. 118 / Wednesday, June 21, 2017 / Notices evaluation to determine whether a text messaging intervention can improve student attendance in a cost effective manner is warranted. To our knowledge, this project is the first multidistrict random assignment study of the impact of a text messaging intervention for parents on student attendance and achievement. In addition, consistent with the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113– 235), which provides the legislative authority to conduct this study, this study will focus on low-performing schools with high levels of poverty and student absenteeism. Dated: June 16, 2017. Kate Mullan, Acting Director Information Collection Clearance Division, Office of the Chief Privacy Officer, Office of Management. [FR Doc. 2017–12945 Filed 6–20–17; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–462–000] asabaliauskas on DSKBBXCHB2PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on June 8, 2017, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, filed a prior notice application pursuant to sections 157.205, and 157.216(b) of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA), and Columbia’s blanket certificate issued in Docket No. CP83–76–000. Columbia requests authorization to construct and operate one new storage well and related appurtenances at Columbia’s Pavonia Storage Field located in Ashland and Richland Counties, Ohio, all as more fully set forth in the application which is open to the public for inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Robert D. Jackson, Manager, Certificates & Regulatory Administration, Columbia VerDate Sep<11>2014 19:12 Jun 20, 2017 Jkt 241001 Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, at (832) 320–5487 or FAX (832) 320–6487, or robert_jackson@ transcanada.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenter will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 28309 environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Daylight Savings Time on August 14, 2017. Dated: June 15, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12927 Filed 6–20–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–461–000] 1057533 Alberta Ltd. and 1978740 Alberta Ltd.; Notice of Application for Section 3 Authorization and Presidential Permit Take notice that on June 5, 2017, 1057533 Alberta Ltd. (Alberta Ltd.), 1500, 700 2nd Street SW., Calgary, Alberta, T2P 2W1 Canada, and 1978740 Alberta Ltd. (Spartan US), 500, 850 2nd Street SW., Calgary, Alberta, T2P 0R8 Canada, filed the above referenced docket an application, pursuant to section 3 of the Natural Gas Act (NGA) and Section 153 of the Commission’s regulations, for the importation of natural gas and a Presidential Permit to operate and maintain the import facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (202) 502–8222 or TTY, (202) 208–1659. Any questions regarding this application should be directed to Gregory Junge, Esq., Van Ness Feldman LLP, 1050 Thomas Jefferson Street NW., Washington, DC 20007 or call (202) 298–1945 or Jon Lowes, Vice President, Land, Harvest Operations Corp., 1500, 700 2nd Street SW., Calgary, AB Canada T2P 2W1 or call (403) 231–5253. E:\FR\FM\21JNN1.SGM 21JNN1

Agencies

[Federal Register Volume 82, Number 118 (Wednesday, June 21, 2017)]
[Notices]
[Page 28309]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12927]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-462-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on June 8, 2017, Columbia Gas Transmission, LLC 
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700, 
filed a prior notice application pursuant to sections 157.205, and 
157.216(b) of the Federal Energy Regulatory Commission's (Commission) 
regulations under the Natural Gas Act (NGA), and Columbia's blanket 
certificate issued in Docket No. CP83-76-000. Columbia requests 
authorization to construct and operate one new storage well and related 
appurtenances at Columbia's Pavonia Storage Field located in Ashland 
and Richland Counties, Ohio, all as more fully set forth in the 
application which is open to the public for inspection. The filing may 
also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Robert D. Jackson, Manager, Certificates & Regulatory Administration, 
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, 
Houston, Texas 77002-2700, at (832) 320-5487 or FAX (832) 320-6487, or 
robert_jackson@transcanada.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenter will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Daylight Savings Time on August 14, 
2017.

    Dated: June 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12927 Filed 6-20-17; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.