City of Escondido, California, & Vista Irrigation District; Notice of Effective Date for Exemption From Licensing (Conduit), Surrender of License, and Dismissal of Relicense Application, 23562-23563 [2017-10514]
Download as PDF
23562
Federal Register / Vol. 82, No. 98 / Tuesday, May 23, 2017 / Notices
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10512 Filed 5–22–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 6168–024 & 7057–009]
sradovich on DSK3GMQ082PROD with NOTICES
B C Hydro, Inc., Highland Hydro
Constructors of California, Inc.,
Shamrock Utilities, LLC; Notice of
Transfer of Exemption
1. By letter filed January 23, 2017,
Shamrock Utilities, LLC informed the
Commission that the exemption from
licensing for the Cedar Flat Project No.
6168, originally issued September 28,
1982 1 located on Mill Creek in Trinity
County, California and occupies lands
within Shasta-Trinity National Forest;
and the Clover Leaf Ranch Project No.
7057, originally issued July 12, 1983 2
located on Clover Creek in Shasta
County, California have been transferred
to Shamrock Utilities, LLC. The transfer
of an exemption does not require
Commission approval.
2. Shamrock Utilities, LLC is now the
exemptee of the Cedar Flat Project No.
6168 and the Clover Leaf Ranch Project
1 Order Granting Exemption from Licensing of a
Small Hydroelectric Project of 5 MW or Less.
Richard Bean and Fred Castagna, 20 FERC 62,550
(1982).
2 Order Granting Exemption from Licensing of a
Small Hydroelectric Project of 5 Megawatts or Less.
Mega Hydro, Inc., 24 FERC 62,041.
VerDate Sep<11>2014
21:15 May 22, 2017
Jkt 241001
No. 7057. All correspondence should be
forwarded to: Theresa A. Ungaro,
President/Owner, Shamrock Utilities,
LLC, P. O. Box 859, Palo Cedro, CA
96073.
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10516 Filed 5–22–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: May 16, 2017.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2017–10523 Filed 5–22–17; 8:45 am]
Combined Notice of Filings
BILLING CODE 6717–01–P
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP17–743–000.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: Ozark Gas Transmission,
L.L.C. submits tariff filing per 154.204:
BP Energy K820104 Negotiated Rate eff
5–1–2021 to be effective 5/1/2021.
Filed Date: 05/12/2017.
Accession Number: 20170512–5030.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, May 24, 2017.
Docket Numbers: RP17–744–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: East Tennessee Natural
Gas, LLC submits tariff filing per
154.204: Duke Energy Progress K410135
Neg Rate eff. 11–1–2017 to be effective
11/1/2017.
Filed Date: 05/12/2017.
Accession Number: 20170512–5058.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, May 24, 2017.
Docket Numbers: RP17–745–000.
Applicants: Kern River Gas
Transmission Company.
Description: Kern River Gas
Transmission Company submits tariff
filing per 154.204: 2017 Nonconforming
Alt P2 and P2 Insulated TSAs to be
effective 5/1/2017.
Filed Date: 05/12/2017.
Accession Number: 20170512–5195.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, May 24, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 176–018; 176–035]
City of Escondido, California, & Vista
Irrigation District; Notice of Effective
Date for Exemption From Licensing
(Conduit), Surrender of License, and
Dismissal of Relicense Application
On September 25, 2012, the
Commission issued a Conditional Order
Granting Exemption from Licensing
(Conduit), Accepting Surrender of
License, and Dismissing Relicense
Application for the Escondido Project
No. 176 (the 2012 Order).1 The
Escondido Project is located on the San
Luis Rey River and Escondido Creek,
near the city of Escondido, in San Diego
County, California.
The 2012 Order approved a conduit
exemption for the Bear Valley
Powerhouse Project No. 176 (part of the
existing Escondido Project) and
accepted surrender of the license for the
remaining project facilities. Both the
conduit exemption and the license
surrender were contingent on certain
conditions being met including the
protection of historic properties,
approval of a water rights settlement
agreement, dismissal of pending court
proceedings, and obtaining a rights-ofway agreement for parts of the project
that would continue to occupy federal
land after the surrender. The 2012 order
also dismissed the relicense application
for the Escondido Project, effective as of
the effective date of the conduit
exemption and license surrender.
On May 3, 2017, the City of
Escondido and Vista Irrigation District
filed documentation that all conditions
1 City of Escondido and Vista Irrigation District,
140 FERC 62,226 (2012).
E:\FR\FM\23MYN1.SGM
23MYN1
Federal Register / Vol. 82, No. 98 / Tuesday, May 23, 2017 / Notices
in the 2012 Order have been satisfied.
Therefore, the new Bear Valley
Powerhouse Project No. 176 conduit
exemption, the license surrender for the
Escondido Project No. 176, and our
dismissal of the relicensing application
are all effective as of the date of this
notice.
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10514 Filed 5–22–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1504–003;
ER10–2861–002; ER10–2866–002.
Applicants: SWG Arapahoe, LLC,
SWG Colorado, LLC, Fountain Valley
Power, L.L.C.
Description: Supplement to December
28, 2016 Triennial Market Power
Analysis for the Northwest Region of the
Southwest Generation Operating
Company Sellers.
Filed Date: 5/16/17.
Accession Number: 20170516–5113.
Comments Due: 5 p.m. ET 6/6/17.
Docket Numbers: ER17–1612–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 3637, Queue No. Y1–084
to be effective 3/27/2017.
Filed Date: 5/16/17.
Accession Number: 20170516–5082.
Comments Due: 5 p.m. ET 6/6/17.
Docket Numbers: ER17–1613–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Wholesale Market Participation
Agreement No. 4700; Queue No. AC1–
030 to be effective 4/25/2017.
Filed Date: 5/16/17.
Accession Number: 20170516–5087.
Comments Due: 5 p.m. ET 6/6/17.
Docket Numbers: ER17–1614–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: DECDue West RS No. 329 Revised PPA to be
effective 1/1/2016.
Filed Date: 5/17/17.
Accession Number: 20170517–5007.
Comments Due: 5 p.m. ET 6/7/17.
Docket Numbers: ER17–1615–000.
VerDate Sep<11>2014
21:15 May 22, 2017
Jkt 241001
Applicants: McCallum Enterprises I
Limited Partnership.
Description: Request for Waiver of
McCallum Enterprises I Limited
Partnership.
Filed Date: 5/11/17.
Accession Number: 20170511–5080.
Comments Due: 5 p.m. ET 6/1/17.
Docket Numbers: ER17–1616–000.
Applicants: Solios Power Trading
LLC.
Description: Tariff Cancellation:
Cancellation of Market Based Rate Tariff
to be effective 5/22/2017.
Filed Date: 5/17/17.
Accession Number: 20170517–5044.
Comments Due: 5 p.m. ET 6/7/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2017–10511 Filed 5–22–17; 8:45 am]
BILLING CODE 6717–01–P
Environmental Protection
Agency (EPA).
ACTION: Notice.
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP17–746–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits tariff filing per
154.204: Housekeeping Filing 5–16–
2017 to be effective 6/6/2016.
Filed Date: 05/16/2017.
Accession Number: 20170516–5067.
Comment Date: 5:00 p.m. Eastern
Time on Tuesday, May 30, 2017.
Sfmt 4703
[FRL–9961–62–OA]
AGENCY:
Federal Energy Regulatory
Commission
Fmt 4703
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
Notification of a Public Teleconference
of the Chartered Clean Air Scientific
Advisory Committee (CASAC) and the
CASAC Sulfur Oxides Panel
BILLING CODE 6717–01–P
Frm 00043
Docket Numbers: RP17–747–000.
Applicants: Empire Pipeline, Inc.
Description: Empire Pipeline, Inc.
submits tariff filing per 154.403(d)(2):
Fuel Tracker (Empire tracking Supply)
to be effective 6/1/2017.
Filed Date: 05/16/2017.
Accession Number: 20170516–5097.
Comment Date: 5:00 p.m. Eastern
Time on Tuesday, May 30, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
ENVIRONMENTAL PROTECTION
AGENCY
[FR Doc. 2017–10510 Filed 5–22–17; 8:45 am]
PO 00000
23563
The EPA Science Advisory
Board (SAB) Staff Office announces a
public teleconference of the Chartered
Clean Air Scientific Advisory
Committee (CASAC) and CASAC Sulfur
Oxides Panel to discuss the CASAC
draft review of the EPA’s Integrated
Science Assessment (ISA) for Sulfur
Oxides—Health Criteria (Second
External Review Draft—December
2016).
DATES: The teleconference will be held
on Tuesday, June 20, 2017, from 1:00
p.m. to 4:00 p.m. (Eastern Time).
Location: The public teleconference
will be held by telephone only.
SUMMARY:
E:\FR\FM\23MYN1.SGM
23MYN1
Agencies
[Federal Register Volume 82, Number 98 (Tuesday, May 23, 2017)]
[Notices]
[Pages 23562-23563]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-10514]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 176-018; 176-035]
City of Escondido, California, & Vista Irrigation District;
Notice of Effective Date for Exemption From Licensing (Conduit),
Surrender of License, and Dismissal of Relicense Application
On September 25, 2012, the Commission issued a Conditional Order
Granting Exemption from Licensing (Conduit), Accepting Surrender of
License, and Dismissing Relicense Application for the Escondido Project
No. 176 (the 2012 Order).\1\ The Escondido Project is located on the
San Luis Rey River and Escondido Creek, near the city of Escondido, in
San Diego County, California.
---------------------------------------------------------------------------
\1\ City of Escondido and Vista Irrigation District, 140 FERC
62,226 (2012).
---------------------------------------------------------------------------
The 2012 Order approved a conduit exemption for the Bear Valley
Powerhouse Project No. 176 (part of the existing Escondido Project) and
accepted surrender of the license for the remaining project facilities.
Both the conduit exemption and the license surrender were contingent on
certain conditions being met including the protection of historic
properties, approval of a water rights settlement agreement, dismissal
of pending court proceedings, and obtaining a rights-of-way agreement
for parts of the project that would continue to occupy federal land
after the surrender. The 2012 order also dismissed the relicense
application for the Escondido Project, effective as of the effective
date of the conduit exemption and license surrender.
On May 3, 2017, the City of Escondido and Vista Irrigation District
filed documentation that all conditions
[[Page 23563]]
in the 2012 Order have been satisfied. Therefore, the new Bear Valley
Powerhouse Project No. 176 conduit exemption, the license surrender for
the Escondido Project No. 176, and our dismissal of the relicensing
application are all effective as of the date of this notice.
Dated: May 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-10514 Filed 5-22-17; 8:45 am]