Algonquin Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 23241 [2017-10384]
Download as PDF
Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14831–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14831) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10371 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–438–000]
mstockstill on DSK30JT082PROD with NOTICES
Algonquin Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on May 5, 2017,
Algonquin Gas Transmission, LLC
(Algonquin), P.O. Box 1642, Houston,
Texas 77251–1642, filed in Docket No.
CP17–438–000 a prior notice request
pursuant to sections 157.205 and
157.208 of the Commission’s regulations
under the Natural Gas Act (NGA), as
amended, requesting authorization to
replace a segment of 24-inch-diameter
pipeline at a crossing of the Mystic
River with an offset located adjacent to
the existing pipeline at the confluence
of the Mystic River and Alewife Brook
(Mystic River Project). Specifically,
Algonquin proposes to install a new,
approximate 1,300-foot section of 24inch-diameter pipeline on its J–1
VerDate Sep<11>2014
23:17 May 19, 2017
Jkt 241001
System underneath the channel of the
Mystic River and Alewife Brook in
Somerville, Medford, and Arlington,
Massachusetts. Algonquin states that the
Mystic River Project will have no
impact on the certificated capacity of
Algonquin system, and there will be no
abandonment or reduction in service to
any customer of Algonquin as a result
of the project. Algonquin estimates the
cost of the Mystic River Project to be
approximately $15 million, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, Director, Rates and
Certificates, Algonquin Gas
Transmission, LLC, P.O. Box 1642,
Houston, Texas 77251–1642, by
telephone at (713) 627–4102, by fax at
(713) 627–5947, or by email at
lisa.connolly@enbridge.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefor, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
23241
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
Dated: May 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10384 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1594–000]
Archer Energy, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Archer
Energy, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 82, Number 97 (Monday, May 22, 2017)]
[Notices]
[Page 23241]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-10384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-438-000]
Algonquin Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on May 5, 2017, Algonquin Gas Transmission, LLC
(Algonquin), P.O. Box 1642, Houston, Texas 77251-1642, filed in Docket
No. CP17-438-000 a prior notice request pursuant to sections 157.205
and 157.208 of the Commission's regulations under the Natural Gas Act
(NGA), as amended, requesting authorization to replace a segment of 24-
inch-diameter pipeline at a crossing of the Mystic River with an offset
located adjacent to the existing pipeline at the confluence of the
Mystic River and Alewife Brook (Mystic River Project). Specifically,
Algonquin proposes to install a new, approximate 1,300-foot section of
24-inch-diameter pipeline on its J-1 System underneath the channel of
the Mystic River and Alewife Brook in Somerville, Medford, and
Arlington, Massachusetts. Algonquin states that the Mystic River
Project will have no impact on the certificated capacity of Algonquin
system, and there will be no abandonment or reduction in service to any
customer of Algonquin as a result of the project. Algonquin estimates
the cost of the Mystic River Project to be approximately $15 million,
all as more fully set forth in the application which is on file with
the Commission and open to public inspection. The filing may also be
viewed on the Web at https://www.ferc.gov using the eLibrary link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
Any questions concerning this application may be directed to Lisa
A. Connolly, Director, Rates and Certificates, Algonquin Gas
Transmission, LLC, P.O. Box 1642, Houston, Texas 77251-1642, by
telephone at (713) 627-4102, by fax at (713) 627-5947, or by email at
lisa.connolly@enbridge.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 7 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: May 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-10384 Filed 5-19-17; 8:45 am]
BILLING CODE 6717-01-P