Public Hearing, 44407-44408 [2016-15994]
Download as PDF
Federal Register / Vol. 81, No. 130 / Thursday, July 7, 2016 / Notices
Projects Scheduled for Action
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
AGENCY:
ACTION:
Notice.
The Susquehanna River Basin
Commission will hold a public hearing
on August 4, 2016, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice. The
Commission will also hear testimony on
a proposal to rescind its Information
Technology Services Fee Policy. Such
projects and the proposal are intended
to be scheduled for Commission action
at its next business meeting, tentatively
scheduled for September 8, 2016, which
will be noticed separately. The public
should take note that this public hearing
will be the only opportunity to offer oral
comment to the Commission for the
listed projects and proposal. The
deadline for the submission of written
comments is August 15, 2016.
SUMMARY:
The public hearing will convene
on August 4, 2016, at 2:30 p.m. The
public hearing will end at 5:00 p.m. or
at the conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
August 15, 2016.
DATES:
The public hearing will be
conducted at the Pennsylvania State
Capitol, Room 8E–B, East Wing,
Commonwealth Avenue, Harrisburg,
PA.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436. Information
concerning the applications for these
projects is available at the SRBC Water
Resource Portal at www.srbc.net/wrp.
Additional supporting documents are
available to inspect and copy in
accordance with the Commission’s
Access to Records Policy at
www.srbc.net/pubinfo/docs/2009-02_
Access_to_Records_Policy_
20140115.pdf.
The
public hearing will cover a proposed
rescission to the Commission’s
Information Technology Services Fee
Policy, as posted on the SRBC Public
Participation Center Web page at
www.srbc.net/pubinfo/
publicparticipation.htm. The public
hearing will also cover the following
projects:
srobinson on DSK5SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:23 Jul 06, 2016
Jkt 238001
1. Project Sponsor and Facility:
Bloomfield Borough Water Authority,
Centre Township, Perry County, PA.
Application for groundwater
withdrawal of up to 0.302 mgd (30-day
average) from Well 3.
2. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Great Bend Township,
Susquehanna County, PA. Application
for renewal of surface water withdrawal
of up to 2.000 mgd (peak day) (Docket
No. 20120904).
3. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Elizabethtown Borough, Lancaster
County, PA. Application for
groundwater withdrawal of up to 0.201
mgd (30-day average) from Well 1.
4. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
PA. Application for groundwater
withdrawal of up to 0.106 mgd (30-day
average) from Well 3.
5. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Elizabethtown Borough, Lancaster
County, PA. Application for
groundwater withdrawal of up to 0.130
mgd (30-day average) from Well 4.
6. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
PA. Application for groundwater
withdrawal of up to 0.187 mgd (30-day
average) from Well 8.
7. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
PA. Application for groundwater
withdrawal of up to 0.216 mgd (30-day
average) from Well 9.
8. Project Sponsor: Exelon Generation
Company, LLC. Project Facility: Muddy
Run Pumped Storage Project, Drumore
and Martic Townships, Lancaster
County, PA. Application for an existing
hydroelectric facility.
9. Project Sponsor and Facility:
Geisinger Health System, Mahoning
Township, Montour County, PA.
Modification to increase consumptive
water use by an additional 0.319 mgd
(peak day), for a total consumptive
water use of up to 0.499 mgd (peak day)
(Docket No. 19910103).
10. Project Sponsor and Facility:
Gilberton Power Company, West
Mahanoy Township, Schuylkill County,
PA. Application for renewal of
consumptive water use of up to 1.510
mgd (peak day) (Docket No. 19851202).
11. Project Sponsor and Facility:
Gilberton Power Company, West
Mahanoy Township, Schuylkill County,
PA. Application for groundwater
PO 00000
Frm 00150
Fmt 4703
Sfmt 4703
44407
withdrawal of up to 1.870 mgd (30-day
average) from the Gilberton Mine Pool.
12. Project Sponsor and Facility:
Manbel Devco I, LP, Manheim
Township, Lancaster County, PA.
Application for groundwater
withdrawal of up to 4.320 mgd (30-day
average) from the Belmont Quarry.
13. Project Sponsor: Pennsylvania
American Water Company. Project
Facility: Nittany Water System, Walker
Township, Centre County, PA.
Application for groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Nittany Well 1.
14. Project Sponsor and Facility:
Republic Services of Pennsylvania, LLC,
Windsor and Lower Windsor
Townships, York County, PA.
Application for renewal of groundwater
withdrawal of up to 0.350 mgd (30-day
average) from groundwater remediation
wells (Docket No. 19860903).
15. Project Sponsor and Facility: SWN
Production Company, LLC, Herrick
Township, Bradford County, PA.
Application for groundwater
withdrawal of up to 0.101 mgd (30-day
average) from the Fields Supply Well.
16. Project Sponsor and Facility:
Talisman Energy USA Inc.
(Susquehanna River), Sheshequin
Township, Bradford County, PA.
Application for renewal of surface water
withdrawal of up to 1.500 mgd (peak
day) (Docket No. 20120912).
17. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Chiques Creek), West Hempfield
Township, Lancaster County, PA.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
18. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-1), Conestoga
Township, Lancaster County, PA.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
19. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-1), Conestoga
Township, Lancaster County, PA.
Application for consumptive water use
of up to 0.100 mgd (peak day).
20. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-2), Conestoga
Township, Lancaster County, PA.
Application for surface water
withdrawal of up to 2.592 mgd (peak
day).
21. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
E:\FR\FM\07JYN1.SGM
07JYN1
srobinson on DSK5SPTVN1PROD with NOTICES
44408
Federal Register / Vol. 81, No. 130 / Thursday, July 7, 2016 / Notices
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-2), Conestoga
Township, Lancaster County, PA.
Application for consumptive water use
of up to 0.100 mgd (peak day).
22. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Deep Creek), Hegins Township,
Schuylkill County, PA. Application for
surface water withdrawal of up to 2.880
mgd (peak day).
23. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Fishing Creek), Sugarloaf Township,
Columbia County, PA. Application for
surface water withdrawal of up to 2.592
mgd (peak day).
24. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Little Fishing Creek), Mount Pleasant
Township, Columbia County, PA.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
25. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Pequea Creek), Martic Township,
Lancaster County, PA. Application for
surface water withdrawal of up to 2.880
mgd (peak day).
26. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Roaring Creek), Franklin Township,
Columbia County, PA. Application for
surface water withdrawal of up to 2.880
mgd (peak day).
27. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River), Eaton Township,
Wyoming County, PA. Application for
surface water withdrawal of up to 2.592
mgd (peak day).
28. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River), Eaton Township,
Wyoming County, PA. Application for
consumptive water use of up to 0.100
mgd (peak day).
29. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-1), Montour
Township and Catawissa Borough,
Columbia County, PA. Application for
surface water withdrawal of up to 2.880
mgd (peak day).
30. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-1), Montour
Township and Catawissa Borough,
Columbia County, PA. Application for
VerDate Sep<11>2014
17:23 Jul 06, 2016
Jkt 238001
consumptive water use of up to 0.100
mgd (peak day).
31. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-2), Montour
Township, Columbia County, PA.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
32. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-2), Montour
Township, Columbia County, PA.
Application for consumptive water use
of up to 0.100 mgd (peak day).
33. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Swatara Creek), East Hanover
Township, Lebanon County, PA.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
34. Project Sponsor and Facility:
Village of Windsor, Broome County, NY.
Application for groundwater
withdrawal of up to 0.380 mgd (30-day
average) from Well 2.
35. Project Sponsor and Facility: West
Manchester Township Authority, West
Manchester Township, York County,
PA. Application for groundwater
withdrawal of up to 0.216 mgd (30-day
average) from Well 7.
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any project or proposal
listed above. The presiding officer
reserves the right to limit oral
statements in the interest of time and to
otherwise control the course of the
hearing. Rules of conduct will be posted
on the Commission’s Web site,
www.srbc.net, prior to the hearing for
review. The presiding officer reserves
the right to modify or supplement such
rules at the hearing. Written comments
on any project listed above may also be
mailed to Mr. Jason Oyler, General
Counsel, Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA. 17110–1788, or
submitted electronically through
www.srbc.net/pubinfo/
publicparticipation.htm. Comments
mailed or electronically submitted must
be received by the Commission on or
before August 15, 2016, to be
considered.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
PO 00000
Frm 00151
Fmt 4703
Sfmt 4703
Dated: June 30, 2016.
Andrew D. Dehoff,
Executive Director.
[FR Doc. 2016–15994 Filed 7–6–16; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
GPS Adjacent Band Compatibility
Assessment Testing
Office of the Assistant
Secretary for Research and Technology,
Department of Transportation.
ACTION: Notice.
AGENCY:
The Department of
Transportation, through the Office of the
Assistant Secretary for Research and
Technology (OST–R), is providing
notice to the public that it will conduct
additional testing of Global Positioning
System/Global Navigation Satellite
System (‘‘GPS/GNSS’’) receivers this
July as part of the DOT Adjacent Band
Compatibility Study (‘‘the Study’’). The
goal of the Study is to evaluate the
adjacent radio frequency band power
levels that can be tolerated by GPS/
GNSS receivers, and advance the
Department’s understanding of the
extent to which such power levels
impact devices used for transportation
safety purposes, among other GPS/
GNSS applications. In April 2016,
radiated testing of GNSS devices took
place in an anechoic chamber at the
U.S. Army Research Laboratory at the
White Sands Missile Range (WSMR)
facility in New Mexico.
The Study provides for testing
categories of receivers that include
aviation (non-certified), cellular, general
location/navigation, high precision and
networks, timing, and space-based
receivers. Approximately twelve
receivers, representing each of these
receiver categories, will be selected for
additional testing from those receivers
tested in April.
FOR FURTHER INFORMATION CONTACT:
Stephen Mackey at the DOT/OST–R
Volpe National Transportation Systems
Center at stephen.mackey@dot.gov or
617–494–2753.
SUPPLEMENTARY INFORMATION: The
Department obtained input from broad
public outreach over the past year that
included four public meetings with
stakeholders on September 18 and
December 4, 2014, and March 12 and
October 2, 2015, public issuance of a
draft test plan on September 9, 2015 (see
80 FR 54368), and comments received
regarding the test plan. The final test
plan was published March 9, 2016 (see
81 FR 12564) and requested voluntary
SUMMARY:
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 81, Number 130 (Thursday, July 7, 2016)]
[Notices]
[Pages 44407-44408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-15994]
[[Page 44407]]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on August 4, 2016, in Harrisburg, Pennsylvania. At this public
hearing, the Commission will hear testimony on the projects listed in
the Supplementary Information section of this notice. The Commission
will also hear testimony on a proposal to rescind its Information
Technology Services Fee Policy. Such projects and the proposal are
intended to be scheduled for Commission action at its next business
meeting, tentatively scheduled for September 8, 2016, which will be
noticed separately. The public should take note that this public
hearing will be the only opportunity to offer oral comment to the
Commission for the listed projects and proposal. The deadline for the
submission of written comments is August 15, 2016.
DATES: The public hearing will convene on August 4, 2016, at 2:30 p.m.
The public hearing will end at 5:00 p.m. or at the conclusion of public
testimony, whichever is sooner. The deadline for the submission of
written comments is August 15, 2016.
ADDRESSES: The public hearing will be conducted at the Pennsylvania
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg,
PA.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel,
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436. Information
concerning the applications for these projects is available at the SRBC
Water Resource Portal at www.srbc.net/wrp. Additional supporting
documents are available to inspect and copy in accordance with the
Commission's Access to Records Policy at www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover a proposed
rescission to the Commission's Information Technology Services Fee
Policy, as posted on the SRBC Public Participation Center Web page at
www.srbc.net/pubinfo/publicparticipation.htm. The public hearing will
also cover the following projects:
Projects Scheduled for Action
1. Project Sponsor and Facility: Bloomfield Borough Water
Authority, Centre Township, Perry County, PA. Application for
groundwater withdrawal of up to 0.302 mgd (30-day average) from Well 3.
2. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Great Bend Township, Susquehanna County, PA.
Application for renewal of surface water withdrawal of up to 2.000 mgd
(peak day) (Docket No. 20120904).
3. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Elizabethtown Borough, Lancaster County, PA. Application for
groundwater withdrawal of up to 0.201 mgd (30-day average) from Well 1.
4. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, PA. Application for
groundwater withdrawal of up to 0.106 mgd (30-day average) from Well 3.
5. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Elizabethtown Borough, Lancaster County, PA. Application for
groundwater withdrawal of up to 0.130 mgd (30-day average) from Well 4.
6. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, PA. Application for
groundwater withdrawal of up to 0.187 mgd (30-day average) from Well 8.
7. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, PA. Application for
groundwater withdrawal of up to 0.216 mgd (30-day average) from Well 9.
8. Project Sponsor: Exelon Generation Company, LLC. Project
Facility: Muddy Run Pumped Storage Project, Drumore and Martic
Townships, Lancaster County, PA. Application for an existing
hydroelectric facility.
9. Project Sponsor and Facility: Geisinger Health System, Mahoning
Township, Montour County, PA. Modification to increase consumptive
water use by an additional 0.319 mgd (peak day), for a total
consumptive water use of up to 0.499 mgd (peak day) (Docket No.
19910103).
10. Project Sponsor and Facility: Gilberton Power Company, West
Mahanoy Township, Schuylkill County, PA. Application for renewal of
consumptive water use of up to 1.510 mgd (peak day) (Docket No.
19851202).
11. Project Sponsor and Facility: Gilberton Power Company, West
Mahanoy Township, Schuylkill County, PA. Application for groundwater
withdrawal of up to 1.870 mgd (30-day average) from the Gilberton Mine
Pool.
12. Project Sponsor and Facility: Manbel Devco I, LP, Manheim
Township, Lancaster County, PA. Application for groundwater withdrawal
of up to 4.320 mgd (30-day average) from the Belmont Quarry.
13. Project Sponsor: Pennsylvania American Water Company. Project
Facility: Nittany Water System, Walker Township, Centre County, PA.
Application for groundwater withdrawal of up to 0.432 mgd (30-day
average) from Nittany Well 1.
14. Project Sponsor and Facility: Republic Services of
Pennsylvania, LLC, Windsor and Lower Windsor Townships, York County,
PA. Application for renewal of groundwater withdrawal of up to 0.350
mgd (30-day average) from groundwater remediation wells (Docket No.
19860903).
15. Project Sponsor and Facility: SWN Production Company, LLC,
Herrick Township, Bradford County, PA. Application for groundwater
withdrawal of up to 0.101 mgd (30-day average) from the Fields Supply
Well.
16. Project Sponsor and Facility: Talisman Energy USA Inc.
(Susquehanna River), Sheshequin Township, Bradford County, PA.
Application for renewal of surface water withdrawal of up to 1.500 mgd
(peak day) (Docket No. 20120912).
17. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Chiques Creek), West Hempfield
Township, Lancaster County, PA. Application for surface water
withdrawal of up to 2.880 mgd (peak day).
18. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga
Township, Lancaster County, PA. Application for surface water
withdrawal of up to 2.880 mgd (peak day).
19. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga
Township, Lancaster County, PA. Application for consumptive water use
of up to 0.100 mgd (peak day).
20. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga
Township, Lancaster County, PA. Application for surface water
withdrawal of up to 2.592 mgd (peak day).
21. Project Sponsor and Facility: Transcontinental Gas Pipe Line
[[Page 44408]]
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga
Township, Lancaster County, PA. Application for consumptive water use
of up to 0.100 mgd (peak day).
22. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Deep Creek), Hegins Township,
Schuylkill County, PA. Application for surface water withdrawal of up
to 2.880 mgd (peak day).
23. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Sugarloaf
Township, Columbia County, PA. Application for surface water withdrawal
of up to 2.592 mgd (peak day).
24. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Little Fishing Creek), Mount
Pleasant Township, Columbia County, PA. Application for surface water
withdrawal of up to 2.880 mgd (peak day).
25. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Pequea Creek), Martic
Township, Lancaster County, PA. Application for surface water
withdrawal of up to 2.880 mgd (peak day).
26. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Roaring Creek), Franklin
Township, Columbia County, PA. Application for surface water withdrawal
of up to 2.880 mgd (peak day).
27. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton
Township, Wyoming County, PA. Application for surface water withdrawal
of up to 2.592 mgd (peak day).
28. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton
Township, Wyoming County, PA. Application for consumptive water use of
up to 0.100 mgd (peak day).
29. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour
Township and Catawissa Borough, Columbia County, PA. Application for
surface water withdrawal of up to 2.880 mgd (peak day).
30. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour
Township and Catawissa Borough, Columbia County, PA. Application for
consumptive water use of up to 0.100 mgd (peak day).
31. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour
Township, Columbia County, PA. Application for surface water withdrawal
of up to 2.880 mgd (peak day).
32. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour
Township, Columbia County, PA. Application for consumptive water use of
up to 0.100 mgd (peak day).
33. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Swatara Creek), East Hanover
Township, Lebanon County, PA. Application for surface water withdrawal
of up to 2.880 mgd (peak day).
34. Project Sponsor and Facility: Village of Windsor, Broome
County, NY. Application for groundwater withdrawal of up to 0.380 mgd
(30-day average) from Well 2.
35. Project Sponsor and Facility: West Manchester Township
Authority, West Manchester Township, York County, PA. Application for
groundwater withdrawal of up to 0.216 mgd (30-day average) from Well 7.
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any project or proposal listed above. The presiding
officer reserves the right to limit oral statements in the interest of
time and to otherwise control the course of the hearing. Rules of
conduct will be posted on the Commission's Web site, www.srbc.net,
prior to the hearing for review. The presiding officer reserves the
right to modify or supplement such rules at the hearing. Written
comments on any project listed above may also be mailed to Mr. Jason
Oyler, General Counsel, Susquehanna River Basin Commission, 4423 North
Front Street, Harrisburg, PA. 17110-1788, or submitted electronically
through www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed
or electronically submitted must be received by the Commission on or
before August 15, 2016, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: June 30, 2016.
Andrew D. Dehoff,
Executive Director.
[FR Doc. 2016-15994 Filed 7-6-16; 8:45 am]
BILLING CODE 7040-01-P