FirstLight Hydro Generating Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 38699-38700 [2016-13977]

Download as PDF Federal Register / Vol. 81, No. 114 / Tuesday, June 14, 2016 / Notices 38699 1028TH—MEETING, REGULAR MEETING—Continued [June 16, 2016, 10:00 a.m.] Item No. Docket No. Company CERTIFICATES C–1 ........ C–2 ........ C–3 ........ C–4 ........ CP15–552–000 ............................................ CP16–70–000 .............................................. CP15–29–001 .............................................. CP15–482–001 ............................................ CP14–509–003 ............................................ RP16–212–001. Dated: June 9, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. Docket No. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. BILLING CODE 6717–01–P Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status srobinson on DSK5SPTVN1PROD with NOTICES Docket No. 19:36 Jun 13, 2016 EG16–71–000 EG16–72–000 EG16–74–000 EG16–75–000 EG16–76–000 EG16–77–000 EG16–78–000 Take notice that during the month of May 2016, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: June 8, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–13981 Filed 6–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Northampton Generating Company, L.P.; Notice of Institution of Section 206 Proceeding and Refund Effective Date DEPARTMENT OF ENERGY VerDate Sep<11>2014 Hidalog Wind Farm LLC ...... Jericho Rise Wind Farm LLC Ninnescah Wind Energy, LLC. Antelope Big Sky Ranch LLC Copper Mountain Solar 4, LLC. MS Solar 3, LLC .................. MS Solar 2, LLC .................. [Docket No. EL16–65–000] [FR Doc. 2016–14145 Filed 6–10–16; 4:15 pm] Golden Fields Solar I, LLC .. Live Oak Solar, LLC ............. White Pine Solar, LLC ......... White Oak Solar, LLC .......... Brady Wind, LLC .................. Brady Wind II, LLC ............... Alta Windpower Development, LLC. Roswell Solar, LLC .............. Chaves Country Solar, LLC Northern Natural Gas Company. Impulsora Pipeline, LLC. Transcontinental Gas Pipe Line Company, LLC. Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P. Paiute Pipeline Company. EG16–62–000 EG16–63–000 EG16–64–000 EG16–65–000 EG16–66–000 EG16–67–000 EG16–68–000 EG16–69–000 EG16–70–000 Jkt 238001 On June 3, 2016, the Commission issued an order in Docket No. EL16–65– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of Northampton Generating Company, L.P.’s reactive power rates. Northampton Generating Co., 155 FERC 61,242 (2016). The refund effective date in Docket No. EL16–65–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 Dated: June 3, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–13960 Filed 6–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2576–168] FirstLight Hydro Generating Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No: 2576–168. c. Date Filed: March 4, 2016. d. Applicant: FirstLight Hydro Generating Company. e. Name of Project: Housatonic River Hydroelectric Project. f. Location: The Shepaug Development (Lake Lillinonah) in Litchfield County, Connecticut. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Howard Person, Plant Manager, 143 West Street, Suite E, New Milford, CT 06776, (860) 350– 3617. i. FERC Contact: Mark Carter, (678) 245–3083, mark.carter@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: July 8, 2016. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ E:\FR\FM\14JNN1.SGM 14JNN1 srobinson on DSK5SPTVN1PROD with NOTICES 38700 Federal Register / Vol. 81, No. 114 / Tuesday, June 14, 2016 / Notices ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2576–168. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: FirstLight Hydro Generating Company proposes to permit the expansion of West Cove Marina from the existing 25 boat slips to a total of 136 boat slips distributed across 8 docks, as well as construction of a new gasoline dock to replace the existing gasoline dock. Although the majority of the site has been previously developed, minor earthwork would be performed to install the 8 concrete pads for connecting the docks to shore. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to VerDate Sep<11>2014 19:36 Jun 13, 2016 Jkt 238001 intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: June 8, 2016. Kimberly D. Bose, Secretary. reorganization. The transferor will be merged into newly created transferee. Applicants Contact: Mr. Andrew Locke, Messalonskee Stream Hydro, LLC, c/o Essex Hydro Assets, 55 Union Street, 4th Floor, Boston, MA 02108, Phone: 617–367–0032, Email: alocke@essexhydro.com. FERC Contact: Patricia W. Gillis, (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–5073–095. Dated: June 8, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–13973 Filed 6–13–16; 8:45 am] [FR Doc. 2016–13977 Filed 6–13–16; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2474–051] [Project No. 5073–095] Benton Falls Associates, New York LP; Benton Falls Associates, Maine LP; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On May 25, 2016, Benton Falls Associates, New York LP (transferor) and Benton Falls Associates, Maine LP (transferee) filed an application for the transfer of license of the Benton Falls Project No. 5073. The project is located on the Sebasticook River in Kennebec County, Maine. The applicants seek Commission approval to transfer the license for the Benton Falls Project from the transferor to the transferee. This transfer of license reflects an internal corporate PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Erie Boulevard Hydropower, L.P.; Notice of Application for Amendment of License Modifying Flashboard System and Flow Discharge Location under Article 405, and Soliciting Comments, Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No: 2474–051. c. Date Filed: May 18, 2016. d. Applicant: Erie Boulevard Hydropower, L.P. (licensee). e. Name of Project: Oswego River Project. E:\FR\FM\14JNN1.SGM 14JNN1

Agencies

[Federal Register Volume 81, Number 114 (Tuesday, June 14, 2016)]
[Notices]
[Pages 38699-38700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13977]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2576-168]


FirstLight Hydro Generating Company; Notice of Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-project use of project lands and waters.
    b. Project No: 2576-168.
    c. Date Filed: March 4, 2016.
    d. Applicant: FirstLight Hydro Generating Company.
    e. Name of Project: Housatonic River Hydroelectric Project.
    f. Location: The Shepaug Development (Lake Lillinonah) in 
Litchfield County, Connecticut.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Howard Person, Plant Manager, 143 West 
Street, Suite E, New Milford, CT 06776, (860) 350-3617.
    i. FERC Contact: Mark Carter, (678) 245-3083, mark.carter@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: July 8, 2016.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/

[[Page 38700]]

ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2576-168.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: FirstLight Hydro Generating Company 
proposes to permit the expansion of West Cove Marina from the existing 
25 boat slips to a total of 136 boat slips distributed across 8 docks, 
as well as construction of a new gasoline dock to replace the existing 
gasoline dock. Although the majority of the site has been previously 
developed, minor earthwork would be performed to install the 8 concrete 
pads for connecting the docks to shore.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13977 Filed 6-13-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.