FirstLight Hydro Generating Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 38699-38700 [2016-13977]
Download as PDF
Federal Register / Vol. 81, No. 114 / Tuesday, June 14, 2016 / Notices
38699
1028TH—MEETING, REGULAR MEETING—Continued
[June 16, 2016, 10:00 a.m.]
Item No.
Docket No.
Company
CERTIFICATES
C–1 ........
C–2 ........
C–3 ........
C–4 ........
CP15–552–000 ............................................
CP16–70–000 ..............................................
CP15–29–001 ..............................................
CP15–482–001 ............................................
CP14–509–003 ............................................
RP16–212–001.
Dated: June 9, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Docket No.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar.
The event will contain a link to its
webcast. The Capitol Connection
provides technical support for the free
webcasts. It also offers access to this
event via television in the DC area and
via phone bridge for a fee. If you have
any questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
srobinson on DSK5SPTVN1PROD with NOTICES
Docket No.
19:36 Jun 13, 2016
EG16–71–000
EG16–72–000
EG16–74–000
EG16–75–000
EG16–76–000
EG16–77–000
EG16–78–000
Take notice that during the month of
May 2016, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: June 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–13981 Filed 6–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Northampton Generating Company,
L.P.; Notice of Institution of Section
206 Proceeding and Refund Effective
Date
DEPARTMENT OF ENERGY
VerDate Sep<11>2014
Hidalog Wind Farm LLC ......
Jericho Rise Wind Farm LLC
Ninnescah Wind Energy,
LLC.
Antelope Big Sky Ranch LLC
Copper Mountain Solar 4,
LLC.
MS Solar 3, LLC ..................
MS Solar 2, LLC ..................
[Docket No. EL16–65–000]
[FR Doc. 2016–14145 Filed 6–10–16; 4:15 pm]
Golden Fields Solar I, LLC ..
Live Oak Solar, LLC .............
White Pine Solar, LLC .........
White Oak Solar, LLC ..........
Brady Wind, LLC ..................
Brady Wind II, LLC ...............
Alta Windpower Development, LLC.
Roswell Solar, LLC ..............
Chaves Country Solar, LLC
Northern Natural Gas Company.
Impulsora Pipeline, LLC.
Transcontinental Gas Pipe Line Company, LLC.
Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P.
Paiute Pipeline Company.
EG16–62–000
EG16–63–000
EG16–64–000
EG16–65–000
EG16–66–000
EG16–67–000
EG16–68–000
EG16–69–000
EG16–70–000
Jkt 238001
On June 3, 2016, the Commission
issued an order in Docket No. EL16–65–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into the justness and reasonableness of
Northampton Generating Company,
L.P.’s reactive power rates.
Northampton Generating Co., 155 FERC
61,242 (2016).
The refund effective date in Docket
No. EL16–65–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Dated: June 3, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–13960 Filed 6–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2576–168]
FirstLight Hydro Generating Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 2576–168.
c. Date Filed: March 4, 2016.
d. Applicant: FirstLight Hydro
Generating Company.
e. Name of Project: Housatonic River
Hydroelectric Project.
f. Location: The Shepaug
Development (Lake Lillinonah) in
Litchfield County, Connecticut.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Howard Person,
Plant Manager, 143 West Street, Suite E,
New Milford, CT 06776, (860) 350–
3617.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: July
8, 2016.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
E:\FR\FM\14JNN1.SGM
14JNN1
srobinson on DSK5SPTVN1PROD with NOTICES
38700
Federal Register / Vol. 81, No. 114 / Tuesday, June 14, 2016 / Notices
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2576–168.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: FirstLight
Hydro Generating Company proposes to
permit the expansion of West Cove
Marina from the existing 25 boat slips
to a total of 136 boat slips distributed
across 8 docks, as well as construction
of a new gasoline dock to replace the
existing gasoline dock. Although the
majority of the site has been previously
developed, minor earthwork would be
performed to install the 8 concrete pads
for connecting the docks to shore.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
VerDate Sep<11>2014
19:36 Jun 13, 2016
Jkt 238001
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
reorganization. The transferor will be
merged into newly created transferee.
Applicants Contact: Mr. Andrew
Locke, Messalonskee Stream Hydro,
LLC, c/o Essex Hydro Assets, 55 Union
Street, 4th Floor, Boston, MA 02108,
Phone: 617–367–0032, Email:
alocke@essexhydro.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–5073–095.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13973 Filed 6–13–16; 8:45 am]
[FR Doc. 2016–13977 Filed 6–13–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2474–051]
[Project No. 5073–095]
Benton Falls Associates, New York LP;
Benton Falls Associates, Maine LP;
Notice of Application for Transfer of
License and Soliciting Comments,
Motions To Intervene, and Protests
On May 25, 2016, Benton Falls
Associates, New York LP (transferor)
and Benton Falls Associates, Maine LP
(transferee) filed an application for the
transfer of license of the Benton Falls
Project No. 5073. The project is located
on the Sebasticook River in Kennebec
County, Maine.
The applicants seek Commission
approval to transfer the license for the
Benton Falls Project from the transferor
to the transferee. This transfer of license
reflects an internal corporate
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Erie Boulevard Hydropower, L.P.;
Notice of Application for Amendment
of License Modifying Flashboard
System and Flow Discharge Location
under Article 405, and Soliciting
Comments, Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
License.
b. Project No: 2474–051.
c. Date Filed: May 18, 2016.
d. Applicant: Erie Boulevard
Hydropower, L.P. (licensee).
e. Name of Project: Oswego River
Project.
E:\FR\FM\14JNN1.SGM
14JNN1
Agencies
[Federal Register Volume 81, Number 114 (Tuesday, June 14, 2016)]
[Notices]
[Pages 38699-38700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13977]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2576-168]
FirstLight Hydro Generating Company; Notice of Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No: 2576-168.
c. Date Filed: March 4, 2016.
d. Applicant: FirstLight Hydro Generating Company.
e. Name of Project: Housatonic River Hydroelectric Project.
f. Location: The Shepaug Development (Lake Lillinonah) in
Litchfield County, Connecticut.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Howard Person, Plant Manager, 143 West
Street, Suite E, New Milford, CT 06776, (860) 350-3617.
i. FERC Contact: Mark Carter, (678) 245-3083, mark.carter@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: July 8, 2016.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/
[[Page 38700]]
ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-2576-168.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: FirstLight Hydro Generating Company
proposes to permit the expansion of West Cove Marina from the existing
25 boat slips to a total of 136 boat slips distributed across 8 docks,
as well as construction of a new gasoline dock to replace the existing
gasoline dock. Although the majority of the site has been previously
developed, minor earthwork would be performed to install the 8 concrete
pads for connecting the docks to shore.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13977 Filed 6-13-16; 8:45 am]
BILLING CODE 6717-01-P