South Sutter Water District; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 31933 [2016-11906]

Download as PDF Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: May 12, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–11896 Filed 5–19–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2997–031] mstockstill on DSK3G9T082PROD with NOTICES South Sutter Water District; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 2997–031. c. Date Filed: March 14, 2016. d. Submitted by: South Sutter Water District. e. Name of Project: Camp Far West Hydroelectric Project. f. Location: On the Bear River, in Yuba, Nevada, and Placer Counties, California. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Bradley J. Arnold, General Manager/ Secretary, South Sutter Water District, 2464 Pacific Avenue, Trowbridge, CA 95659; (530) 656–2242; email—sswd@ hughes.net. i. FERC Contact: Quinn Emmering at (202) 502–6382; or email at quinn.emmering@ferc.gov. j. South Sutter Water District filed its request to use the Traditional Licensing Process on March 11, 2016. South Sutter Water District provided public notice of its request on April 14, 2016. In a letter dated May 13, 2016, the Director of the Division of Hydropower Licensing approved South Sutter Water District’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are VerDate Sep<11>2014 17:40 May 19, 2016 Jkt 238001 also initiating consultation with the California State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating South Sutter Water District as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. South Sutter Water District filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 2997–031. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by June 30, 2019. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: May 13, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–11906 Filed 5–19–16; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 31933 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. AD16–15–000; ER16–1085– 000; ER16–1649–000] Reliability Technical Conference; California Independent System Operator Corporation; California Independent System Operator Corporation; Supplemental Notice With Agenda As announced in the Notice of Technical Conference issued on February 3, 2016, the Commission will hold a technical conference on Wednesday, June 1, 2016 from 9:30 a.m. to 5:00 p.m. to discuss policy issues related to the reliability of the BulkPower System. The agenda for this conference is attached. Commission members will participate in this conference. Advanced registration is not required, but is encouraged. Attendees may register at: https://www.ferc.gov/whatsnew/registration/06-01-16-form.asp. After the close of the conference, the Commission will accept written comments regarding the matters discussed at the technical conference. Any person or entity wishing to submit written comments regarding the matters discussed at the conference should submit such comments in Docket No. AD16–15–000 on or before July 8, 2016. Information on this event will be posted on the Calendar of Events on the Commission’s Web site, www.ferc.gov, prior to the event. The conference will be transcribed. Transcripts will be available for a fee from Ace Reporting Company (202–347–3700). A free webcast of this event is also available through www.ferc.gov. Anyone with Internet access who desires to listen to this event can do so by navigating to www.ferc.gov Calendar of Events and locating this event in the Calendar. The event will contain a link to the webcast. The Capitol Connection provides technical support for webcasts and offers the option of listening to the meeting via phone-bridge for a fee. If you have any questions, visit www.CapitolConnection.org or call 703– 993–3100. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–502–8659 (TTY), or send a FAX to 202–208–2106 with the required accommodations. E:\FR\FM\20MYN1.SGM 20MYN1

Agencies

[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Page 31933]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11906]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2997-031]


South Sutter Water District; Notice of Intent To File License 
Application, Filing of Pre-Application Document, Approving Use of the 
Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 2997-031.
    c. Date Filed: March 14, 2016.
    d. Submitted by: South Sutter Water District.
    e. Name of Project: Camp Far West Hydroelectric Project.
    f. Location: On the Bear River, in Yuba, Nevada, and Placer 
Counties, California. No federal lands are occupied by the project 
works or located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Bradley J. Arnold, General Manager/
Secretary, South Sutter Water District, 2464 Pacific Avenue, 
Trowbridge, CA 95659; (530) 656-2242; email_sswd@hughes.net.
    i. FERC Contact: Quinn Emmering at (202) 502-6382; or email at 
quinn.emmering@ferc.gov.
    j. South Sutter Water District filed its request to use the 
Traditional Licensing Process on March 11, 2016. South Sutter Water 
District provided public notice of its request on April 14, 2016. In a 
letter dated May 13, 2016, the Director of the Division of Hydropower 
Licensing approved South Sutter Water District's request to use the 
Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 
of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the California State Historic Preservation Officer, 
as required by section 106, National Historic Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating South Sutter Water District 
as the Commission's non-federal representative for carrying out 
informal consultation pursuant to section 7 of the Endangered Species 
Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    m. South Sutter Water District filed a Pre-Application Document 
(PAD; including a proposed process plan and schedule) with the 
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 2997-031. Pursuant to 18 
CFR 16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by June 30, 
2019.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: May 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11906 Filed 5-19-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.