South Sutter Water District; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 31933 [2016-11906]
Download as PDF
Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 12, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–11896 Filed 5–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2997–031]
mstockstill on DSK3G9T082PROD with NOTICES
South Sutter Water District; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2997–031.
c. Date Filed: March 14, 2016.
d. Submitted by: South Sutter Water
District.
e. Name of Project: Camp Far West
Hydroelectric Project.
f. Location: On the Bear River, in
Yuba, Nevada, and Placer Counties,
California. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Bradley J. Arnold, General Manager/
Secretary, South Sutter Water District,
2464 Pacific Avenue, Trowbridge, CA
95659; (530) 656–2242; email—sswd@
hughes.net.
i. FERC Contact: Quinn Emmering at
(202) 502–6382; or email at
quinn.emmering@ferc.gov.
j. South Sutter Water District filed its
request to use the Traditional Licensing
Process on March 11, 2016. South Sutter
Water District provided public notice of
its request on April 14, 2016. In a letter
dated May 13, 2016, the Director of the
Division of Hydropower Licensing
approved South Sutter Water District’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
VerDate Sep<11>2014
17:40 May 19, 2016
Jkt 238001
also initiating consultation with the
California State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
South Sutter Water District as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. South Sutter Water District filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2997–031.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by June 30, 2019.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: May 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–11906 Filed 5–19–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
31933
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. AD16–15–000; ER16–1085–
000; ER16–1649–000]
Reliability Technical Conference;
California Independent System
Operator Corporation; California
Independent System Operator
Corporation; Supplemental Notice With
Agenda
As announced in the Notice of
Technical Conference issued on
February 3, 2016, the Commission will
hold a technical conference on
Wednesday, June 1, 2016 from 9:30 a.m.
to 5:00 p.m. to discuss policy issues
related to the reliability of the BulkPower System. The agenda for this
conference is attached. Commission
members will participate in this
conference.
Advanced registration is not required,
but is encouraged. Attendees may
register at: https://www.ferc.gov/whatsnew/registration/06-01-16-form.asp.
After the close of the conference, the
Commission will accept written
comments regarding the matters
discussed at the technical conference.
Any person or entity wishing to submit
written comments regarding the matters
discussed at the conference should
submit such comments in Docket No.
AD16–15–000 on or before July 8, 2016.
Information on this event will be
posted on the Calendar of Events on the
Commission’s Web site, www.ferc.gov,
prior to the event. The conference will
be transcribed. Transcripts will be
available for a fee from Ace Reporting
Company (202–347–3700). A free
webcast of this event is also available
through www.ferc.gov. Anyone with
Internet access who desires to listen to
this event can do so by navigating to
www.ferc.gov Calendar of Events and
locating this event in the Calendar. The
event will contain a link to the webcast.
The Capitol Connection provides
technical support for webcasts and
offers the option of listening to the
meeting via phone-bridge for a fee. If
you have any questions, visit
www.CapitolConnection.org or call 703–
993–3100.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
E:\FR\FM\20MYN1.SGM
20MYN1
Agencies
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Page 31933]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11906]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2997-031]
South Sutter Water District; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2997-031.
c. Date Filed: March 14, 2016.
d. Submitted by: South Sutter Water District.
e. Name of Project: Camp Far West Hydroelectric Project.
f. Location: On the Bear River, in Yuba, Nevada, and Placer
Counties, California. No federal lands are occupied by the project
works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Bradley J. Arnold, General Manager/
Secretary, South Sutter Water District, 2464 Pacific Avenue,
Trowbridge, CA 95659; (530) 656-2242; email_sswd@hughes.net.
i. FERC Contact: Quinn Emmering at (202) 502-6382; or email at
quinn.emmering@ferc.gov.
j. South Sutter Water District filed its request to use the
Traditional Licensing Process on March 11, 2016. South Sutter Water
District provided public notice of its request on April 14, 2016. In a
letter dated May 13, 2016, the Director of the Division of Hydropower
Licensing approved South Sutter Water District's request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the California State Historic Preservation Officer,
as required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating South Sutter Water District
as the Commission's non-federal representative for carrying out
informal consultation pursuant to section 7 of the Endangered Species
Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. South Sutter Water District filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2997-031. Pursuant to 18
CFR 16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by June 30,
2019.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: May 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11906 Filed 5-19-16; 8:45 am]
BILLING CODE 6717-01-P