Rugraw, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 26221-26222 [2016-10096]

Download as PDF Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Additional information about the projects is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search,’’ and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP15–18 or CP15–498). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Dated: April 25, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10097 Filed 4–29–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–1440–000] srobinson on DSK5SPTVN1PROD with NOTICES Roswell Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Roswell Solar, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and VerDate Sep<11>2014 20:30 Apr 29, 2016 Jkt 238001 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 11, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 21, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10135 Filed 4–29–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12496–002] Rugraw, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 26221 a. Type of Application: Major Original License. b. Project No.: P–12496–002. c. Date filed: April 21, 2014. d. Applicant: Rugraw, LLC. e. Name of Project: Lassen Lodge Hydroelectric Project. f. Location: On the South Fork Battle Creek near the Town of Mineral in Tehama County, California. The project would be located on private lands. No federal lands or Indian reservations are located within the proposed project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Charlie Kuffner, 70 Paseo Mirasol, Tiburon, CA 94920; (415) 652–8553 i. FERC Contact: Kenneth Hogan at (202) 502–8434; or via email at kenneth.hogan@ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–12496–002. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The proposed Lassen Lodge Project would consist of: (1) A 6-foot-high and 94-foot-long diversion dam; (2) an impoundment of approximately 0.5 E:\FR\FM\02MYN1.SGM 02MYN1 srobinson on DSK5SPTVN1PROD with NOTICES 26222 Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices acre; (3) a 20-foot by 10-foot enclosed concrete intake structure; (4) a 7,258foot-long pipeline and a 5,230-foot-long penstock with a net head of 791 feet; (5) a 50-foot by 50-foot powerhouse containing one generating unit with a 5,000-kilowatt capacity; (6) a 50-foot by 50-foot substation area; (7) a 40-foot by 35-foot switchyard; (8) 100-foot by 100foot multipurpose area; and (9) a new 12-mile-long, 60-kilovolt transmission line. The project is estimated to produce approximately 25,000,000 kilowatt hours annually. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No VerDate Sep<11>2014 20:30 Apr 29, 2016 Jkt 238001 competing applications or notices of intent may be filed in response to this notice. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target Notice that application is ready for environmental analysis. Filing of comments, recommendations, terms and conditions, and prescriptions. Filing of reply comments ... Notice of the availability of the draft EIS. Initiate 10(j) process .......... Notice of the availability of the final EIS. April 2016. June 2016. July 2016. October 2016. December 2016. May 2017. p. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: April 25, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10096 Filed 4–29–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission dbroatch@earthlink.net and Ms. Katie McGinnes, Day Pitney LLP, 242 Trumbull Street, Hartford, CT 06103– 1212. For transferee: Mr. Mark Boumansour, Aspinook Hydro, LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220, Boulder, CO 80302, telephone: 303–440–3378, email: mark@gravityrenewables.com and copies to: Mr. Karl F. Kumli, III, Dietze and Davis, P.C., 2060 Broadway, Suite 400, Boulder, CO 80302 and Mr. Robert A. Panasci, Esq., Young/Sommer, LLC Executive Woods, 5 Palisades Drive, Albany, NY 12205. FERC Contact: Patricia W. Gillis, (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–3472–022. Dated: April 21, 2016. Kimberly D. Bose, Secretary. [Project No. 3472–022] Summit Hydropower, Inc.; Aspinook Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests [FR Doc. 2016–10141 Filed 4–29–16; 8:45 am] On April 12, 2016, Summit Hydropower, Inc. (transferor) and Aspinook Hydro, LLC (transferee) filed an application for transfer of license of the Wyre Wynd Project No. 3472. The project is located on the Quinebaug River in New London County, Connecticut. The project does not occupy Federal lands. The applicants seek Commission approval to transfer the license for the Wyre Wynd Project from the transferor to the transferee. Applicant Contact: For transferor: Mr. Duncan Broatch, Summit Hydropower, Inc., 6 Far Hills Drive, Avon, CT 06001, telephone: 860–255–7744, email: Federal Energy Regulatory Commission PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [Docket No. ER16–1406–000] Peak View Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Peak View Wind Energy LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR E:\FR\FM\02MYN1.SGM 02MYN1

Agencies

[Federal Register Volume 81, Number 84 (Monday, May 2, 2016)]
[Notices]
[Pages 26221-26222]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10096]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12496-002]


Rugraw, LLC; Notice of Application Ready for Environmental 
Analysis and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Original License.
    b. Project No.: P-12496-002.
    c. Date filed: April 21, 2014.
    d. Applicant: Rugraw, LLC.
    e. Name of Project: Lassen Lodge Hydroelectric Project.
    f. Location: On the South Fork Battle Creek near the Town of 
Mineral in Tehama County, California. The project would be located on 
private lands. No federal lands or Indian reservations are located 
within the proposed project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Charlie Kuffner, 70 Paseo Mirasol, Tiburon, 
CA 94920; (415) 652-8553
    i. FERC Contact: Kenneth Hogan at (202) 502-8434; or via email at 
kenneth.hogan@ferc.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-12496-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed Lassen Lodge Project would consist of: (1) A 6-
foot-high and 94-foot-long diversion dam; (2) an impoundment of 
approximately 0.5

[[Page 26222]]

acre; (3) a 20-foot by 10-foot enclosed concrete intake structure; (4) 
a 7,258-foot-long pipeline and a 5,230-foot-long penstock with a net 
head of 791 feet; (5) a 50-foot by 50-foot powerhouse containing one 
generating unit with a 5,000-kilowatt capacity; (6) a 50-foot by 50-
foot substation area; (7) a 40-foot by 35-foot switchyard; (8) 100-foot 
by 100-foot multipurpose area; and (9) a new 12-mile-long, 60-kilovolt 
transmission line. The project is estimated to produce approximately 
25,000,000 kilowatt hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
               Milestone                              Target
------------------------------------------------------------------------
Notice that application is ready for     April 2016.
 environmental analysis.
Filing of comments, recommendations,     June 2016.
 terms and conditions, and
 prescriptions.
Filing of reply comments...............  July 2016.
Notice of the availability of the draft  October 2016.
 EIS.
Initiate 10(j) process.................  December 2016.
Notice of the availability of the final  May 2017.
 EIS.
------------------------------------------------------------------------

    p. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: April 25, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-10096 Filed 4-29-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.