Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 26217-26218 [2016-10095]

Download as PDF 26217 Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices consultation with the FTC staff, in accordance with 10 CFR 430.27, it is ORDERED that: (1) The petition for waiver submitted by the Whirlpool Corporation (Case No. CW–026) is hereby granted as set forth in the paragraphs below. (2) Whirlpool must test and rate the Whirlpool basic models specified in paragraph (3) on the basis of the current test procedure contained in 10 CFR part 430, subpart B, appendix J2, except that Table 5.1 of appendix J2 is supplemented by the following additional rows: TABLE 5.1—TEST LOAD SIZES—SUPPLEMENT Container volume cu. ft. ≥< 6.00–6.10 6.10–6.20 6.20–6.30 6.30–6.40 6.40–6.50 6.50–6.60 6.60–6.70 6.70–6.80 6.80–6.90 6.90–7.00 7.00–7.10 7.10–7.20 7.20–7.30 7.30–7.40 7.40–7.50 7.50–7.60 7.60–7.70 7.70–7.80 7.80–7.90 7.90–8.00 Minimum load liter ≥< .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. .............. 169.9–172.7 172.7–175.6 175.6–178.4 178.4–181.2 181.2–184.1 184.1–186.9 186.9–189.7 189.7–192.6 192.6–195.4 195.4–198.2 198.2–201.0 201.0–203.9 203.9–206.7 206.7–209.5 209.5–212.4 212.4–215.2 215.2–218.0 218.0–220.9 220.9–223.7 223.7–226.5 lb .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... Issued in Washington, DC, on April 26, 2016. Kathleen B. Hogan, Deputy Assistant Secretary for Energy Efficiency, Energy Efficiency and Renewable Energy. [FR Doc. 2016–10209 Filed 4–29–16; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK5SPTVN1PROD with NOTICES Notice of Attendance at PJM Interconnection, L.L.C. Meetings VerDate Sep<11>2014 20:30 Apr 29, 2016 Jkt 238001 lb 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 24.80 25.20 25.60 26.00 26.40 26.90 27.30 27.70 28.10 28.50 28.90 29.30 29.70 30.10 30.60 31.00 31.40 31.80 32.20 32.60 The Commission and Commission staff may attend the following meetings: PJM Members Committee • • • • • • • April 28, 2016—(Wilmington, DE) May 17–19, 2016—(Cambridge, MD) June 30, 2016—(Wilmington, DE) July 28, 2016—(TBD) September 29, 2016—(TBD) October 27, 2016—(TBD) November 17, 2016—(TBD) PJM Markets and Reliability Committee • • • • • • • • • • • • • • • April 28, 2016—(Wilmington, DE) May 26, 2016—(Wilmington, DE) June 30, 2016—(Wilmington, DE) July 28, 2016—(TBD) August 25, 2016—(TBD) September 29, 2016—(TBD) October 27, 2016—(TBD) November 17, 2016—(TBD) December 22, 2016—(TBD) May 11, 2016—(Audubon, PA) June 8, 2016—(Audubon, PA) July 13, 2016—(Audubon, PA) August 10, 2016—(Audubon, PA) September 14, 2016—(Audubon, PA) October 5, 2016—(Audubon, PA) Planning and Market Implementation) and senior standing committees (Members and Markets and Reliability) meet on a variety of different topics; they convene and dissolve on an as-needed basis. Therefore, the Commission and Commission staff may monitor the various meetings posted on the PJM Web site. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Average load kg PJM Market Implementation Committee The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and Markets and Reliability Committee meetings, as well as other PJM committee, subcommittee or task force meetings.1 1 For example, PJM subcommittees and task forces of the standing committees (Operating, kg 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (3) This order applies only to the following three basic models: V15EAg50(3B); V15EBg50(3B); and V15ECg50(3B). (5) This waiver shall remain in effect consistent with the provisions of 10 CFR 430.27. Maximum load lb 11.25 11.43 11.61 11.79 11.97 12.20 12.38 12.56 12.75 12.93 13.11 13.29 13.47 13.65 13.88 14.06 14.24 14.42 14.61 14.79 Kg 13.90 14.10 14.30 14.50 14.70 14.95 15.15 15.35 15.55 15.75 15.95 16.15 16.35 16.55 16.80 17.00 17.20 17.40 17.60 17.80 6.30 6.40 6.49 6.58 6.67 6.78 6.87 6.96 7.05 7.14 7.23 7.33 7.42 7.51 7.62 7.71 7.80 7.89 7.98 8.07 • November 2, 2016—(Audubon, PA) • December 14, 2016—(Audubon, PA) The discussions at each of the meetings described above may address matters at issue in pending proceedings before the Commission, including the following currently pending proceedings: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL08–14, Black Oak Energy LLC, et al., v. FERC Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket Nos. AD12–1 and ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. EL12–54, Viridity Energy, Inc. v. PJM Interconnection, L.L.C. Docket No. EL13–88, Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, L.L.C. Docket No. ER13–90, Public Service Electric and Gas Company and PJM Interconnection, L.L.C. Docket No. ER13–195, Indicated PJM Transmission Owners Docket No. ER13–349, PJM Interconnection, L.L.C. Docket No. ER13–535, PJM Interconnection, L.L.C. Docket No. ER13–1654, PJM Interconnection, L.L.C. E:\FR\FM\02MYN1.SGM 02MYN1 srobinson on DSK5SPTVN1PROD with NOTICES 26218 Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices Docket No. ER13–1924, PJM Interconnection, L.L.C. and Duquesne Light Company Docket No. ER13–1926, PJM Interconnection, L.L.C. Docket No. ER13–1942, New York Independent System Operator, Inc. Docket No. ER13–1943, Midcontinent Independent System Operator, Inc. Docket No. ER13–1944, PJM Interconnection, L.L.C. Docket No. ER13–1945, Midcontinent Independent System Operator, Inc. Docket No. ER13–1955, Entergy Services, Inc. Docket No. ER13–1956, Cleco Power LLC Docket No. ER13–2108, PJM Interconnection, L.L.C. Docket No. EL14–20, Independent Market Monitor v. PJM Interconnection, L.L.C. Docket No. EL14–37, PJM Interconnection, L.L.C. Docket Nos. EL14–94, EL14–36, FirstEnergy Solutions Corporation and PJM Interconnection, L.L.C. Docket No. ER14–504, PJM Interconnection, L.L.C. Docket No. ER14–822, PJM Interconnection, L.L.C. Docket No. ER14–972, PJM Interconnection, L.L.C. Docket No. ER14–1144, PJM Interconnection, L.L.C. Docket No. ER14–1145, PJM Interconnection, L.L.C. Docket Nos. ER14–1461, EL14–48, PJM Interconnection, L.L.C. Docket No. ER14–1485, PJM Interconnection, L.L.C. Docket No. ER14–2242, Old Dominion Electric Cooperative Docket No. ER14–2940, PJM Interconnection, L.L.C. Docket Nos. EL15–15, ER15–696, PJM Interconnection, L.L.C. Docket No. EL15–18, Consolidated Edison Company of New York, Inc. v. PJM Interconnection, L.L.C. Docket No. EL15–38, RTO Energy Trading, LLC Docket No. EL15–41, Essential Power Rock Springs, LLC, et al., v. PJM Interconnection, L.L.C. Docket No. EL15–67, Linden VFT, LLC v. PJM Interconnection, L.L.C. Docket No. EL15–79, TranSource, LLC v. PJM Interconnection, L.L.C. Docket No. EL15–80, Advanced Energy Management Alliance Coalition v. PJM Interconnection, L.L.C. Docket No. EL15–95, Maryland and Delaware State Commissions v. PJM Interconnection, L.L.C. Docket No. ER15–532, PJM Interconnection, L.L.C. Docket Nos. ER15–623, EL15–29, PJM Interconnection, L.L.C. VerDate Sep<11>2014 20:30 Apr 29, 2016 Jkt 238001 Docket No. ER15–746, RC Cape May Holdings, LLC Docket No. ER15–834, Illinois Municipal Electric Agency Docket No. ER15–952, New Jersey Energy Associates, A Limited Partnership Docket No. ER15–994, PJM Interconnection, L.L.C. Docket Nos. ER15–1344, ER15–1387, PJM Interconnection, L.L.C. Docket Nos. ER15–2562, ER15–2563, PJM Interconnection, L.L.C. Docket No. ER15–2613, PJM Interconnection, L.L.C., and Midcontinent Independent System Operator, Inc. Docket Nos. EL16–6, ER16–121, PJM Interconnection, L.L.C. Docket No. EL16–9, Big Sandy Peaker Plant, LLC et al. v. PJM Interconnection, L.L.C. Docket Nos. EL15–73, ER16–372, PJM Interconnection, L.L.C. Docket No. ER16–453, PJM Interconnection, L.L.C., and Northeast Transmission Development, LLC Docket Nos. ER16–535, ER16–536, PJM Interconnection, L.L.C. and Midcontinent Independent System Operator, Inc. Docket No. ER16–736, PJM Interconnection, L.L.C. Docket No. ER16–1004, PJM Interconnection, L.L.C. Docket No. ER16–1150, PJM Interconnection, L.L.C. Docket No. ER16–1232, PJM Interconnection, L.L.C. Docket No. ER16–1335, PJM Interconnection, L.L.C. Docket No. ER16–1336, PJM Interconnection, L.L.C. For additional meeting information, see: https://www.pjm.com/committeesand-groups.aspx and https:// www.pjm.com/Calendar.aspx. The meetings are open to stakeholders. For more information, contact Valerie Martin, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6139 or Valerie.Martin@ferc.gov. Dated: April 25, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10095 Filed 4–29–16; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–1466–000] Palmco Power NH LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Palmco Power NH LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 11, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email E:\FR\FM\02MYN1.SGM 02MYN1

Agencies

[Federal Register Volume 81, Number 84 (Monday, May 2, 2016)]
[Notices]
[Pages 26217-26218]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10095]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission and Commission staff may attend 
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and 
Markets and Reliability Committee meetings, as well as other PJM 
committee, subcommittee or task force meetings.\1\ The Commission and 
Commission staff may attend the following meetings:
---------------------------------------------------------------------------

    \1\ For example, PJM subcommittees and task forces of the 
standing committees (Operating, Planning and Market Implementation) 
and senior standing committees (Members and Markets and Reliability) 
meet on a variety of different topics; they convene and dissolve on 
an as-needed basis. Therefore, the Commission and Commission staff 
may monitor the various meetings posted on the PJM Web site.
---------------------------------------------------------------------------

PJM Members Committee

 April 28, 2016--(Wilmington, DE)
 May 17-19, 2016--(Cambridge, MD)
 June 30, 2016--(Wilmington, DE)
 July 28, 2016--(TBD)
 September 29, 2016--(TBD)
 October 27, 2016--(TBD)
 November 17, 2016--(TBD)

PJM Markets and Reliability Committee

 April 28, 2016--(Wilmington, DE)
 May 26, 2016--(Wilmington, DE)
 June 30, 2016--(Wilmington, DE)
 July 28, 2016--(TBD)
 August 25, 2016--(TBD)
 September 29, 2016--(TBD)
 October 27, 2016--(TBD)
 November 17, 2016--(TBD)
 December 22, 2016--(TBD)

PJM Market Implementation Committee

 May 11, 2016--(Audubon, PA)
 June 8, 2016--(Audubon, PA)
 July 13, 2016--(Audubon, PA)
 August 10, 2016--(Audubon, PA)
 September 14, 2016--(Audubon, PA)
 October 5, 2016--(Audubon, PA)
 November 2, 2016--(Audubon, PA)
 December 14, 2016--(Audubon, PA)
    The discussions at each of the meetings described above may address 
matters at issue in pending proceedings before the Commission, 
including the following currently pending proceedings:

Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL08-14, Black Oak Energy LLC, et al., v. FERC
Docket No. ER11-1844, Midwest Independent Transmission System Operator, 
Inc.
Docket Nos. AD12-1 and ER11-4081, Midwest Independent Transmission 
System Operator, Inc.
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection, 
L.L.C.
Docket No. EL13-88, Northern Indiana Public Service Company v. 
Midcontinent Independent System Operator, Inc. and PJM Interconnection, 
L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM 
Interconnection, L.L.C.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-349, PJM Interconnection, L.L.C.
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. ER13-1654, PJM Interconnection, L.L.C.

[[Page 26218]]

Docket No. ER13-1924, PJM Interconnection, L.L.C. and Duquesne Light 
Company
Docket No. ER13-1926, PJM Interconnection, L.L.C.
Docket No. ER13-1942, New York Independent System Operator, Inc.
Docket No. ER13-1943, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1944, PJM Interconnection, L.L.C.
Docket No. ER13-1945, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1955, Entergy Services, Inc.
Docket No. ER13-1956, Cleco Power LLC
Docket No. ER13-2108, PJM Interconnection, L.L.C.
Docket No. EL14-20, Independent Market Monitor v. PJM Interconnection, 
L.L.C.
Docket No. EL14-37, PJM Interconnection, L.L.C.
Docket Nos. EL14-94, EL14-36, FirstEnergy Solutions Corporation and PJM 
Interconnection, L.L.C.
Docket No. ER14-504, PJM Interconnection, L.L.C.
Docket No. ER14-822, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-1144, PJM Interconnection, L.L.C.
Docket No. ER14-1145, PJM Interconnection, L.L.C.
Docket Nos. ER14-1461, EL14-48, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket No. ER14-2242, Old Dominion Electric Cooperative
Docket No. ER14-2940, PJM Interconnection, L.L.C.
Docket Nos. EL15-15, ER15-696, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v. 
PJM Interconnection, L.L.C.
Docket No. EL15-38, RTO Energy Trading, LLC
Docket No. EL15-41, Essential Power Rock Springs, LLC, et al., v. PJM 
Interconnection, L.L.C.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-79, TranSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-80, Advanced Energy Management Alliance Coalition v. 
PJM Interconnection, L.L.C.
Docket No. EL15-95, Maryland and Delaware State Commissions v. PJM 
Interconnection, L.L.C.
Docket No. ER15-532, PJM Interconnection, L.L.C.
Docket Nos. ER15-623, EL15-29, PJM Interconnection, L.L.C.
Docket No. ER15-746, RC Cape May Holdings, LLC
Docket No. ER15-834, Illinois Municipal Electric Agency
Docket No. ER15-952, New Jersey Energy Associates, A Limited 
Partnership
Docket No. ER15-994, PJM Interconnection, L.L.C.
Docket Nos. ER15-1344, ER15-1387, PJM Interconnection, L.L.C.
Docket Nos. ER15-2562, ER15-2563, PJM Interconnection, L.L.C.
Docket No. ER15-2613, PJM Interconnection, L.L.C., and Midcontinent 
Independent System Operator, Inc.
Docket Nos. EL16-6, ER16-121, PJM Interconnection, L.L.C.
Docket No. EL16-9, Big Sandy Peaker Plant, LLC et al. v. PJM 
Interconnection, L.L.C.
Docket Nos. EL15-73, ER16-372, PJM Interconnection, L.L.C.
Docket No. ER16-453, PJM Interconnection, L.L.C., and Northeast 
Transmission Development, LLC
Docket Nos. ER16-535, ER16-536, PJM Interconnection, L.L.C. and 
Midcontinent Independent System Operator, Inc.
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER16-1004, PJM Interconnection, L.L.C.
Docket No. ER16-1150, PJM Interconnection, L.L.C.
Docket No. ER16-1232, PJM Interconnection, L.L.C.
Docket No. ER16-1335, PJM Interconnection, L.L.C.
Docket No. ER16-1336, PJM Interconnection, L.L.C.

    For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
    The meetings are open to stakeholders. For more information, 
contact Valerie Martin, Office of Energy Market Regulation, Federal 
Energy Regulatory Commission at (202) 502-6139 or 
Valerie.Martin@ferc.gov.

    Dated: April 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10095 Filed 4-29-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.