Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 19168-19169 [2016-07531]
Download as PDF
19168
Federal Register / Vol. 81, No. 64 / Monday, April 4, 2016 / Notices
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP15–558), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07536 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12796–004]
mstockstill on DSK4VPTVN1PROD with NOTICES
City of Wadsworth, Ohio; Notice of
Teleconference
a. Project Name and Number: R.C.
Byrd Hydroelectric Project No. 12796.
b. Date and Time of Meeting:
Thursday, April 28, 2016 at 1:00 p.m.
(Eastern Daylight Time).
c. FERC Contact: Andy Bernick,
andrew.bernick@ferc.gov or (202) 502–
8660.
d. Purpose of Meeting: Commission
staff will hold a teleconference to
discuss: (1) The Indiana Bat and
Northern Long Eared Bat Conservation
Plan and Mussel Monitoring and
Conservation Plan for the R.C. Byrd
Hydroelectric Project, filed in draft form
on June 23, 2015, by American
Municipal Power, Inc. (or AMP, agent
for the City of Wadsworth, Ohio); (2) the
report entitled ‘‘Examining the Effect of
Potential Water Velocities on Mussel
Populations at R.C. Byrd Lock and Dam
on the Ohio River (ORM 279.2)’’
prepared for AMP and filed on February
10, 2016; and (3) the current status of
resolving the remaining information
needs noted in U.S. Fish and Wildlife
Service’s Ohio Ecological Services Field
Office and West Virginia Field Office
comments on the draft plans filed
August 26, 2015.
VerDate Sep<11>2014
19:03 Apr 01, 2016
Jkt 238001
e. All local, state, and federal
agencies, Indian tribes, and other
interested parties are invited to
participate by phone. Please call Andy
Bernick at (202) 502–8660 by Thursday,
April 21, 2016, to RSVP and to receive
specific instructions on how to
participate.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07533 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14744–000]
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On December 22, 2015, Energy
Resources USA, Inc. (Energy Resources)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Nolin Lake
Dam Hydroelectric Project (Nolin
Project or project) to be located at the
U.S. Army Corps of Engineers’ Nolin
Lake Dam on the Nolin River in
Edmonson County, Kentucky. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A control structure
with three 9.5-foot-wide, 25-foot-long
spill gates; (2) one 10-foot-diameter, 65foot-long penstock with a butterfly
valve; (3) a bifurcation structure; (4) two
6.5-foot-diameter, 32-foot-long
penstocks; (5) a powerhouse containing
two generating units with a total
capacity of 7 megawatts; (6) a 1000-footlong, 220-foot-wide tailrace; (7) a
substation; and (8) a 3-mile-long, 69 kV
transmission line. The proposed project
would have an estimated average annual
generation of 26,900 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; Email: agonzalez@
energyresources.es.
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
FERC Contact: Christiane Casey;
phone: (202) 502–8577.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14744–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14744) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07534 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14750–000]
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On December 22, 2015, Energy
Resources USA, Inc. (Energy Resources)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Lake
Tuscaloosa Dam Hydroelectric Project
(Lake Tuscaloosa Project or project) to
be located at the U.S. Army Corps of
Engineers’ Lake Tuscaloosa Dam on the
North River in Tuscaloosa County,
Alabama. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
E:\FR\FM\04APN1.SGM
04APN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 64 / Monday, April 4, 2016 / Notices
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A control structure
with three 9.5-foot-wide, 25-foot-long
spill gates; (2) one 6-foot-diameter, 98foot-long penstock with a butterfly
valve; (3) a bifurcation structure; (4) two
4-foot-diameter, 32-foot-long penstocks;
(5) a powerhouse containing two
generating units with a total capacity of
1.65 megawatts; (6) a 1000-foot-long,
220-foot-wide tailrace; (7) a substation;
and (8) a 2.5-mile-long, 69 kV
transmission line. The proposed project
would have an estimated average annual
generation of 5,200 megawatt-hours, and
operate as directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; Email: agonzalez@energy
resources.es.
FERC Contact: Christiane Casey;
phone: (202) 502–8577.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14750–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14750) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07531 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:27 Apr 01, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No., 14745–000]
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On December 22, 2015, Energy
Resources USA, Inc. (Energy Resources)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Rough River
Lake Dam Hydroelectric Project (Rough
River Project or project) to be located at
the U.S. Army Corps of Engineers’
Rough River Lake Dam on the Rough
River in Breckinridge and Grayson
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A control structure
with three 9.5-foot-wide, 25-foot-long
spill gates; (2) one 9.5-foot-diameter,
130-foot-long penstock with a butterfly
valve; (3) a bifurcation structure; (4) two
6.5-foot-diameter, 32-foot-long
penstocks; (5) a powerhouse containing
two generating units with a total
capacity of 10 megawatts; (6) a 1000foot-long, 220-foot-wide tailrace; (7) a
substation; and (8) a 0.3-mile-long, 69
kV transmission line. The proposed
project would have an estimated average
annual generation of 8,700 megawatthours, and operate as directed by the
Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; E-mail:
agonzalez@energyresources.es.
FERC Contact: Christiane Casey;
phone: (202) 502–8577.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
19169
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14745–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14745) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07528 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD16–2–000]
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
of Postponing Technical Conference
In a prior notice, the Commission
scheduled a technical conference to
review the submitted Other Federal
Agency costs in the above-captioned
docket. Due to the impact of the Nuclear
Security Summit on March 31, 2016 the
conference is postponed to April 7,
2016.
The technical conference will be held
on April 7, 2016, in Conference Room
3M–1 at the Commission’s headquarters,
888 First Street NE., Washington, DC.
The technical conference will begin at
2:00 p.m. (EST).
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07539 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project
Western Area Power
Administration, DOE.
AGENCY:
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 81, Number 64 (Monday, April 4, 2016)]
[Notices]
[Pages 19168-19169]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07531]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14750-000]
Energy Resources USA, Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments and Motions To
Intervene
On December 22, 2015, Energy Resources USA, Inc. (Energy Resources)
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Lake Tuscaloosa Dam Hydroelectric Project (Lake Tuscaloosa Project
or project) to be located at the U.S. Army Corps of Engineers' Lake
Tuscaloosa Dam on the North River in Tuscaloosa County, Alabama. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit
[[Page 19169]]
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A control
structure with three 9.5-foot-wide, 25-foot-long spill gates; (2) one
6-foot-diameter, 98-foot-long penstock with a butterfly valve; (3) a
bifurcation structure; (4) two 4-foot-diameter, 32-foot-long penstocks;
(5) a powerhouse containing two generating units with a total capacity
of 1.65 megawatts; (6) a 1000-foot-long, 220-foot-wide tailrace; (7) a
substation; and (8) a 2.5-mile-long, 69 kV transmission line. The
proposed project would have an estimated average annual generation of
5,200 megawatt-hours, and operate as directed by the Corps.
Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone:
(954) 248-8425; Email: agonzalez@energyresources.es.
FERC Contact: Christiane Casey; phone: (202) 502-8577.
Deadline for filing comments and motions to intervene: 60 days from
the issuance of this notice.
The Commission strongly encourages electronic filing. Please file
comments and motions to intervene using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-14750-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14750) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07531 Filed 4-1-16; 8:45 am]