Download as PDF 18904 Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676; for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Dated: March 28, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–07494 Filed 4–3–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13817–001] EBD Hydro Apple Inc.; Notice of Transfer of Exemption mstockstill on DSK4VPTVN1PROD with NOTICES 1. By letter filed on December 9, 2013 and supplemented on December 27, 2013, EBD Hydro informed the Commission that the exemption from licensing for the 45-Mile Hydroelectric Project, FERC No. 13817, originally issued December 17, 2010,1 has been transferred to Apple Inc. The project will be located at the concrete drop structure of the North Unit Irrigation District’s main irrigation canal in Jefferson County, Oregon. The transfer of an exemption does not require Commission approval. 2. Apple Inc. is now the exemptee of the 45-Mile Hydroelectric Project, FERC No. 13817. All correspondence should be forwarded to: Apple Inc., Attn: Real Estate Counsel, 1 Infinite Loop, MS: 4D– LAW, Cupertino, CA 95014. Dated: March 31, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–07535 Filed 4–3–14; 8:45 am] BILLING CODE 6717–01–P 1 133 FERC ¶ 62,268, Order Granting Exemption From Licensing (Conduit). VerDate Mar<15>2010 17:37 Apr 03, 2014 Jkt 232001 FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–1606–000] Cosima Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Cosima Energy, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is April 21, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Dated: March 31, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–07539 Filed 4–3–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD14–8–000] Winter 2013–2014 Operations and Market Performance in Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Technical Conference As announced in the Notice issued on February 21, 2014, and the Supplemental Notice issued on March 19, 2014 (March 19 Notice), the Federal Energy Regulatory Commission (Commission) will hold a Commissioner-led technical conference on Tuesday, April 1, 2014, from 9:00 a.m. to approximately 5:15 p.m. to discuss the impacts of recent cold weather events on the Regional Transmission Organizations/ Independent System Operators (RTOs/ISOs), and discuss actions taken to respond during those occurrences. The conference will be held at the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This conference is free of charge and open to the public. Commission members will participate in the conference. Following the conference, the Commission will take written public comments until May 15, 2014. While this conference is not for the purpose of discussing specific cases, the March 19 Notice noted that discussions at the technical conference may address matters at issue in a number of Commission proceedings that are either pending or within their rehearing period and included a list of those proceedings. The following additional Commission proceedings may also involve issues that could be addressed at the technical conference: Posting of Offers to Purchase Capacity, Docket No. RP14– 442; California Independent System Operator Corporation, Docket No. EL14– 22; ISO New England Inc., Docket No. EL14–23; PJM Interconnection, LLC, Docket No. EL14–24; Midcontinent Independent System Operator, Inc., Docket No. EL14–25; New York Independent System Operator, Inc., E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Page 18904]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07535]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13817-001]


EBD Hydro Apple Inc.; Notice of Transfer of Exemption

    1. By letter filed on December 9, 2013 and supplemented on December 
27, 2013, EBD Hydro informed the Commission that the exemption from 
licensing for the 45-Mile Hydroelectric Project, FERC No. 13817, 
originally issued December 17, 2010,\1\ has been transferred to Apple 
Inc. The project will be located at the concrete drop structure of the 
North Unit Irrigation District's main irrigation canal in Jefferson 
County, Oregon. The transfer of an exemption does not require 
Commission approval.
---------------------------------------------------------------------------

    \1\ 133 FERC ] 62,268, Order Granting Exemption From Licensing 
(Conduit).
---------------------------------------------------------------------------

    2. Apple Inc. is now the exemptee of the 45-Mile Hydroelectric 
Project, FERC No. 13817. All correspondence should be forwarded to: 
Apple Inc., Attn: Real Estate Counsel, 1 Infinite Loop, MS: 4D-LAW, 
Cupertino, CA 95014.

    Dated: March 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07535 Filed 4-3-14; 8:45 am]
BILLING CODE 6717-01-P