Search and Track the Federal Register
Department or Agency:
Show:
Regulations Filed: All Dates
Between and
Full Text (optional):


Bonneville Power Administration – Federal Register Recent Federal Regulation Documents

Results 1 - 50 of 57
Document Doc Number PDF Type Agency
October 13, 2009
Environmental Impact Statements; Availability, etc.: I–5 Corridor Reinforcement Project 52482–52483 [E9–24469] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration I-5 Corridor Reinforcement Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV) transmission line... [read document]
 
October 5, 2009
Availability of the Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions 51142–51143 [E9–23921] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including... [read document]
 
September 23, 2009
Record of Decision: Washington-Action Agency Estuary Habitat Memorandum of Agreement 48530–48531 [E9–22926] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Washington-Action Agency Estuary Habitat Memorandum of Agreement Record of Decision AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD under the National Environmental Policy Act (NEPA) for the Estuary Habitat Memorandum of Agreement (MOA) with the State of Washington consistent with and tiered to the... [read document]
 
September 16, 2009
Electrical Interconnection of the Kittitas Valley Wind Project 47570 [E9–22284] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration; Electrical Interconnection of the Kittitas Valley Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of record of decision (ROD). SUMMARY: The Bonneville Power Administration (BPA) has decided to offer Sagebrush Power Partners, LLC, a Large Generator Interconnection Agreement for interconnection of up to 108 megawatts of power into the Federal Columbia River Transmission... [read document]
 
August 24, 2009
Availability of Record of Decision (ROD): Electrical Interconnection of the Golden Hills Wind Project 42667 [E9–20303] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Golden Hills Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA) has decided to offer BP Alternative Energy North America, Inc. a Large Generator Interconnection Agreement for interconnection of up to 200 megawatts of power into the Federal Columbia River... [read document]
 
July 30, 2009
Environmental Impact Statements; Availability, etc.: Mid Columbia Coho Restoration Project 38001–38002 [E9–18188] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Mid-Columbia Coho Restoration Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: This notice announces BPA's intention to prepare an EIS on funding the Confederated Tribes and Bands of the Yakama Nation (YN) to undertake the reintroduction of coho salmon into mid-Columbia River... [read document]
 
July 17, 2009
Environmental Impact Statements; Availability, etc.: Klickitat Hatchery Program 34740–34741 [E9–17034] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Klickitat Hatchery Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and a floodplain and wetland assessment. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on funding proposed changes to the existing salmon and steelhead hatchery program in the Klickitat subbasin in Klickitat and... [read document]
 
June 19, 2009
Environmental Impact Statement; Intent, etc.: Central Ferry – Lower Monumental Transmission Line Project 29205–29206 [E9–14448] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Central Ferry-Lower Monumental Transmission Line Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV)... [read document]
 
June 3, 2009
Environmental Impact Statements; Intent: Big Eddy – Knight Transmission Project 26679–26680 [E9–12915] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration; Big Eddy-Knight Transmission Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV) transmission line and... [read document]
 
May 29, 2009
Public Hearings: 2012 Tiered Rate Methodology Supplemental Proceeding 25729–25732 [E9–12489] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: TRM-12S] 2012 Tiered Rate Methodology Supplemental Proceeding; Public Hearings and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of proposed modifications to the Tiered Rate Methodology. SUMMARY: BPA is proposing modifications to its Tiered Rate Methodology (TRM), TRM-12-A-02, which specifies the methodology to be used in setting BPA's... [read document]
 
April 21, 2009
Environmental Impact Statement; Intent: Whistling Ridge Energy Project; Floodplain and Wetland Involvement 18213–18214 [E9–9096] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Whistling Ridge Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Intent to prepare an Environmental Impact Statement (EIS) and floodplain and wetland involvement. SUMMARY: This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS with the Washington Energy Facility Site Evaluation Council (EFSEC) for a... [read document]
 
Leaning Juniper II Wind Project 18214 [E9–9094] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Leaning Juniper II Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms for interconnection of up to 200 megawatts of wind generation from the Iberdrola Renewables, Inc.'s proposed Leaning Juniper II Wind Project into the Federal Columbia River Transmission System. This decision is... [read document]
 
March 31, 2009
Final Policy: Revised Policy on Determining Net Requirements of Pacific Northwest Utility Customers 14544 [E9–7168] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Notice of Final Policy; Revised Policy on Determining Net Requirements of Pacific Northwest Utility Customers Under Sections 5(b)(1) and 9(c) of the Northwest Power Act AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: In July 2007, the Bonneville Power Administration released its Long-Term Regional Dialogue Final Policy (RD Policy) and associated Record of Decision (ROD). The RD... [read document]
 
March 2, 2009
Fiscal Year (FY) 2010–2011 Proposed Power and Transmission Rate Adjustments: Public Hearing and Opportunities for Public Review and Comment; Correction 9090–9091 [E9–4323] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Fiscal Year (FY) 2010-2011 Proposed Power and Transmission Rate Adjustments; Public Hearing and Opportunities for Public Review and Comment; Correction AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of FY 2010-2011 Proposed Power and Transmission Rate Adjustments; Correction. SUMMARY: On February 10, 2009, BPA published a notice in the Federal Register (74 FR 6609), (February 10, 2009 Notice)... [read document]
 
Fiscal Year (FY) 2010–2011 Proposed Power and Transmission Rate Adjustments: Lyle Falls Fish Passage Project 9091 [E9–4324] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Lyle Falls Fish Passage Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to implement the Proposed Action identified in the Lyle Falls Fish Passage Project EIS (DOE/EIS-0397, November 2008). BPA has decided to fund modifications to the existing Lyle Falls Fishway on the lower Klickitat River... [read document]
 
February 10, 2009
FY 2010–2011 Proposed Power and Transmission Rate Adjustments: Public Hearing and Opportunities for Public Review and Comment 6609–6618 [E9–2750] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Fiscal Year (FY) 2010-2011 Proposed Power and Transmission Rate Adjustments; Public Hearing and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of FY 2010-2011 Proposed Power and Transmission Rate Adjustments. SUMMARY: BPA is holding a consolidated rate proceeding, BPA-10, that will have separate sub-dockets for power and transmission rates for FY 2010-2011.... [read document]
 
November 17, 2008
2008 Columbia Basin Fish Accords Memorandum of Agreement with the Shoshone Bannock Tribes 67865 [E8–27186] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration 2008 Columbia Basin Fish Accords Memorandum of Agreement with the Shoshone-Bannock Tribes AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD for the 2008 Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Shoshone-Bannock Tribes consistent with and tiered to the Fish and Wildlife... [read document]
 
September 24, 2008
Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) 55059–55060 [E8–22357] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including... [read document]
 
August 1, 2008
Record of Decision: Libby to Bonners Ferry 115-kilovolt Transmission Line Project, MT 44979–44980 [E8–17726] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-Kilovolt Transmission Line Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC)... [read document]
 
July 28, 2008
Shepherds Flat Wind Project; Record of Decision 43730 [E8–17241] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Shepherds Flat Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 846 megawatts of power to be generated by the proposed Shepherds Flat Wind Project (Wind... [read document]
 
June 27, 2008
Willow Creek Wind Project 36500–36501 [E8–14610] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Willow Creek Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 72 megawatts of power to be generated by the proposed Willow Creek Wind Project (Wind... [read document]
 
May 9, 2008
Record of Decision; Availability: Columbia Basin Fish Accords 26380 [E8–10435] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Columbia Basin Fish Accords AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD for the 2008 Columbia Basin Fish Accords (Accords) consistent with and tiered to the Fish and Wildlife Implementation Plan Environmental Impact Statement (DOE/EIS-0312, April 2003) and ROD (October 31, 2003). BPA has decided... [read document]
 
May 6, 2008
2012 Tiered Rate Methodology Proceeding; republication 24961–24964 [E8–9953] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: TRM-12] 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment Editorial Note: FR Doc. E8-9572 was originally published at page 24059 in the issue of May 1, 2008. That document was inadvertently published prior to the requested publication date, as stated in an Office of the Federal Register correction notice published at 73 FR 24496, May 2, 2008. FR Doc. E8-9572 is being... [read document]
 
May 1, 2008
2012 Tiered Rate Methodology Proceeding 24059–24062 [E8–9572] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: TRM-12] 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of proposed tiered rate methodology. SUMMARY: BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 2012-2013 rate period. The primary feature of this Tiered Rate... [read document]
 
February 8, 2008
2007 Supplemental Wholesale Power Rate Adjustment Proceeding, Public Hearings, and Opportunities for Public Review and Comment 7539–7555 [E8–2339] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration 2007 Supplemental Wholesale Power Rate Adjustment Proceeding, Public Hearings, and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Proposed Wholesale Power Rates (Notice). BPA File No.: WP-07. SUMMARY: The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review and... [read document]
 
February 7, 2008
Proposed Methodology for Determining Average System Cost of Resources for Electric Utilities: Bonneville Power Administration 7270–7279 [E8–2258] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Proposed Methodology for Determining the Average System Cost of Resources for Electric Utilities Participating in the Residential Exchange Program Established by Section 5(c) of the Pacific Northwest Electric Power Planning and Conservation Act AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice; request for comments (BPA File No.: ASCM-08). SUMMARY: Bonneville Power Administration (BPA) proposes a revised methodology for... [read document]
 
Proposed Wind IntegrationWithin-Hour Balancing Service Rate 7279–7282 [E8–2253] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA Docket No. WI-09] Proposed Wind Integration--Within-Hour Balancing Service Rate for Public Hearing, and Opportunity for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Wind Integration--Within-Hour Balancing Service Rate (Notice), BPA Docket No. WI-09. SUMMARY: The purpose of the hearing is to adopt a rate for Wind Integration--Within-Hour Balancing Service. As... [read document]
 
September 28, 2007
Reports and guidance documents; availability, etc.: Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions 55193 [E7–19195] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including... [read document]
 
August 13, 2007
Reports and guidance documents; availability, etc.: Pacific Northwest; long-term regional dialogue policy 45238–45239 [E7–15770] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Notice of Final Policy; Bonneville Power Administration Long-Term Regional Dialogue Policy AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: The Regional Dialogue Policy defines BPA's power supply and marketing role for the long term and does so in a way that meets key regional and national energy goals. This Policy sets the parameters for moving forward into the next phase of the... [read document]
 
July 27, 2007
Reports and guidance documents; availability, etc.: Pacific Northwest power supply after 2011; long-term regional dialogue policy 41307 [E7–14529] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Long-Term Regional Dialogue Policy AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of a National Environmental Policy Act (NEPA) Record of Decision (ROD). SUMMARY: This notice announces the availability of the NEPA ROD for BPA's adoption of a policy for its power supply role after fiscal year 2011. This policy is intended to provide BPA's customers with greater clarity about their... [read document]
 
March 19, 2007
Environmental statements; record of decision: Coyote Business Park Project; OR 12786 [E7–4913] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Coyote Business Park Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to implement BPA's portion of the Proposed Action identified in the United States Department of the Interior, Bureau of Indian Affairs' (BIA) Coyote Business Park Final Environmental Impact Statement (EIS) (DOE/EIS-0371, September 2006).... [read document]
 
February 22, 2007
Environmental statements; record of decision: Fish and wildlife mitigation projects (2007-2009 FY) 7972 [E7–2998] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration FY 2007-2009 Fish and Wildlife Project Implementation Decision AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD for BPA's 2007-2009 Fish and Wildlife Project Implementation Decision. BPA has decided to implement certain new and ongoing fish and wildlife mitigation projects for Fiscal Years 2007... [read document]
 
February 5, 2007
Meetings: Transmission rate case; hearing 5283–5288 [E7–1773] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA Docket No. TR-08] 2008 Transmission Rate Case; Public Hearing and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of 2008 Transmission Rate Case. SUMMARY: BPA requests that all motions, petitions, comments and documents intended to become part of the Official Record of the 2008 Transmission Rate Case proceeding include the designation TR-08. BPA's... [read document]
 
December 6, 2006
Environmental statements; record of decision: Windy Point Wind Energy Project 70748 [E6–20654] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Windy Point Wind Energy Project; November 2006 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms for interconnection of up to 250 megawatts of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). BPA has... [read document]
 
November 3, 2006
Environmental statements; record of decision: Klondike III Biglow Canyon Wind Integration Project, OR 64689 [E6–18610] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Klondike III/Biglow Canyon Wind Integration Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (EIS) (DOE/ EIS-0374, September 2006). BPA will offer PPM Energy, Inc.... [read document]
 
October 5, 2006
Reports and guidance documents; availability, etc.: Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions 58851–58852 [E6–16459] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including... [read document]
 
August 10, 2006
Reports and guidance documents; availability, etc.: Pacific Northwest power supply after 2011; long-term regional dialogue policy; meetings 45799–45800 [E6–13033] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Opportunity for Public Comment; Bonneville Power Administration Long-Term Regional Dialogue Policy Proposal AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of Regional Dialogue policy proposal and opportunity for public comment. SUMMARY: BPA is publishing a policy proposal regarding the agency's future power supply role in the Pacific Northwest after 2011. This proposal addresses how the agency proposes to... [read document]
 
June 26, 2006
Environmental statements; notice of intent: Klickitat County, WA; Lyle Falls Fish Passage Project 36329–36330 [E6–9999] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Lyle Falls Fish Passage Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: This notice announces BPA's intention to prepare an EIS on proposed improvements to the Lyle Falls Fishway in Klickitat County, near Lyle, Washington. The improvements would ease fish passage to upstream... [read document]
 
June 19, 2006
Reports and guidance documents; availability, etc.: Service to direct service industrial customers (FY 2007-2011); record of decision 35266 [E6–9584] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: BPA Administrator Stephen J. Wright signed a supplement to the Administrator's Record of Decision (ROD) on Bonneville Power Administration's Service to Direct Service... [read document]
 
May 12, 2006
Environmental statements; record of decision: South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program 27714 [06–4441] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of record of decision (ROD). SUMMARY: This notice announces the availability of the ROD for the South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, based on the South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program... [read document]
 
December 6, 2005
Environmental statements; notice of intent: Klondike III Wind Project Interconnection, OR 72635–72636 [E5–6904] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Klondike III/Biglow Canyon Wind Integration Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Extension of Comment Period for an Environmental Impact Statement (EIS). SUMMARY: This notice extends the close of comment for scoping from the previously published May 13, 2005 to January 5, 2006. BPA is preparing its Klondike III/Biglow Canyon Wind Integration EIS under the National Environmental... [read document]
 
November 25, 2005
Environmental statements; record of decision: Federal Columbia River Transmission System— Goodnoe Hills and Whitecreek Wind Energy Projects, WA; interconnection 71113 [E5–6522] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Goodnoe Hills and White Creek Wind Energy Projects, October 2005 AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: BPA has decided to offer contract terms for interconnection of the Goodnoe Hills and White Creek Wind Energy Projects into the Federal Columbia River Transmission System (FCRTS) at the Rock Creek substation in Klickitat County,... [read document]
 
November 8, 2005
Electric power transmission, acquisition, and conservation: Wholesale power rate adjustment (2007 FY); hearing 67685–67697 [05–22233] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: WP-07] 2007 Wholesale Power Rate Adjustment Proceeding; Public Hearings, and Opportunities for Public Review and Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of proposed wholesale power rates. SUMMARY: The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), 16 U.S.C. 839, provides that BPA must establish and periodically review and revise its... [read document]
 
September 30, 2005
Reports and guidance documents; availability, etc.: Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) 57276–57277 [05–19590] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including... [read document]
 
August 2, 2005
Environmental statements; notice of intent: Chief Joseph Dam Hatchery Program 44347–44348 [05–15192] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Chief Joseph Dam Hatchery Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS). SUMMARY: This notice announces BPA's intention to prepare an EIS on a comprehensive management program for summer/fall Chinook salmon in the Okanogan subbasin and the Columbia River between the confluence of the Okanogan River and Chief Joseph Dam including... [read document]
 
July 15, 2005
Reports and guidance documents; availability, etc.: Federal Columbia River Transmission System— Pacific Northwest direct service industries; policy statement 40999–41000 [05–13940] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Bonneville Power Administration's Record of Decision for Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: On February 4, 2005, BPA issued a final policy and record of decision (ROD) regarding how the agency will market power and distribute the costs and benefits of the Federal Columbia River Power System... [read document]
 
May 5, 2005
Environmental statements; notice of intent: Port Angeles-Juan de Fuca High Voltage Direct Current Transmission Project, WA 23855–23856 [05–8995] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Office of Electricity and Energy Assurance; Port Angeles--Juan de Fuca High Voltage Direct Current Transmission Project AGENCIES: Bonneville Power Administration (BPA) and Office of Electricity and Energy Assurance (OEEA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS). SUMMARY: This notice announces the Department of Energy's (DOE) intent to prepare an EIS (DOE/EIS-0378) and to conduct... [read document]
 
Environmental statements; notice of intent: Libby to Bonners Ferry 115-kilovolt transmission line, MT 23856–23857 [05–8996] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS). SUMMARY: BPA intends to prepare an EIS on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line... [read document]
 
April 4, 2005
Environmental statements; record of decision: Federal Columbia River Transmission System— Big Horn Energy Project, WA; interconnection 17078 [05–6595] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Big Horn Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms for interconnection of 200 megawatts of power to be generated by the proposed Big Horn Wind Energy Project into the Federal Columbia River Transmission System. The project would be interconnected at... [read document]
 
March 23, 2005
Environmental statements; record of decision: Federal Columbia River Transmission System— Jones Canyon Switching Station, OR; Leaning Juniper Wind Project 14662–14663 [05–5726] PDF Notice Bonneville Power Administration
DEPARTMENT OF ENERGY Bonneville Power Administration Leaning Juniper Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms for interconnection of up to 200 megawatts of wind generation from the PPM Energy, Inc.'s, proposed Leaning Juniper Wind Project into the Federal Columbia River Transmission System. This decision is... [read document]
 
        Next >
Add to your RSS Reader Add to your Google Add to your My Yahoo Add to your My MSN Add to your My AOL Add to your Feedster Add to your Newsgator Add to your Bloglines Add to your NewsBurst Add to your Rojo Add to your Pluck